915
|
Monday, April 04, 2022, 20:56 |
Carla Babcock | | | | | | | | wiring reverted for cathode-bias FEBIAD | Wiring which was changed to run the mass
marker tests has been reverted:
anode bias cable connected |
|
251
|
Monday, December 17, 2012, 22:35 |
Sebastian Raeder | RFQ empty | | | | | | | wire connection for RFQ test | Overview over the connections of the new
9Pin connector inside the vacuum and in the
HV cage |
|
128
|
Thursday, July 05, 2012, 10:59 |
Friedhelm Ames | | | | | | | Problems/Solutions | water tripping in front of HV power supplies | Found some water tripping in front of the
high voltage power supplies rack from the
water lines at the ceiling. Plastic sheets |
|
124
|
Wednesday, July 04, 2012, 13:07 |
Anders Mjos | | | | | | | Problems/Solutions | water lines purged |
|
|
57
|
Wednesday, March 07, 2012, 09:27 |
Friedhelm Ames | Nb#6 | | | | | | Done | water cooling started | water cooling line valves opened. No response
on vacuum TSG:IG1 3.5e-7 T |
|
254
|
Wednesday, December 19, 2012, 09:44 |
Sebastian Raeder | | | | | | | In progress | venting | venting and inspect the target
Wednesday, December 19, 2012, 09:43:
vqacuum at 1.9E-7T, stop turbos |
|
29
|
Friday, January 20, 2012, 10:37 |
Friedhelm Ames | | | | | | | | vacuum pumps shut off | turbo pumps shut off due to work on
cooling water system |
|
51
|
Monday, March 05, 2012, 14:41 |
Friedhelm Ames | | | | | | | | vacuum and optics switched off | vacuum and optics at teststand switched
off to allow work on the water cooling system. |
|
56
|
Tuesday, March 06, 2012, 15:51 |
Friedhelm Ames | | | | | | | | turbopumps in mass separator section started | |
|
71
|
Wednesday, April 11, 2012, 09:34 |
Friedhelm Ames | | | | | | | | turbopumps in mass separator section started | turbopumps in mass separator section started
after power outages |
|
123
|
Wednesday, July 04, 2012, 09:22 |
Friedhelm Ames | | | | | | | Problems/Solutions | turbo pumps stopped | turbo pumps stopped to prepare for venting
for anode short investigation. |
|
30
|
Tuesday, January 24, 2012, 09:44 |
Friedhelm Ames | | | | | | | | turbo pumps restarted | All turbo pumps have been restarted after
cooling water is back and running.
|
|
52
|
Monday, March 05, 2012, 19:31 |
Friedhelm Ames | | | | | | | Failed | turbo pumps failed | Both turbo pumps at the source box cannot
be started. A fault report has been issued. |
|
2
|
Wednesday, September 14, 2011, 15:33 |
John Wong | Test#1 | HP-SIS | ITW | TM1 | test | test | In progress | testing elog for test stand | Wednesday, September 14, 2011, 15:33
blah blah blah... |
|
146
|
Thursday, July 12, 2012, 15:49 |
Anders Mjos | | | | | | | | test stand vented for TP1A replacement | see e-fault 6142 |
|
9
|
Friday, September 23, 2011, 15:38 |
Rick Maharaj | | | | | | | | test stand vented | Test stand vented |
|
89
|
Tuesday, May 15, 2012, 08:42 |
Rick Maharaj | | | | | | | | target removed | |
|
90
|
Tuesday, May 15, 2012, 09:46 |
Rick Maharaj | | | | | | | | target reinstalled pumping started | |
|
91
|
Tuesday, May 15, 2012, 10:14 |
Anders Mjos | SiC#27 | HP-SIS | ITE | TM4 | | | In progress | target ready to be heated and biased | Tuesday, May 15, 2012, 10:13: Turbo
pumps at speed. Vacuum at 1.4E-5.
Tuesday, May 15, 2012, 12:03: Cooling |
|
253
|
Tuesday, December 18, 2012, 16:00 |
Sebastian Raeder | RFQ empty | | | | | | Done | target heating | Tuesday, December 18, 2012, ~ 13:00 start
ramping the TGHT current, vacuum at 1.7E-7T
Tuesday, December 18, 2012, 15:56: |
|