217
|
Friday, September 28, 2012, 09:59 |
Aurelia Laxdal | | | | | | | In progress | SiC-HP-FEBIAD for operator training - Source Off | Checked with ISAC Ops this morning and
they are not available for FEBIAD training.
Turned off the source until next week. |
|
|
218
|
Monday, October 01, 2012, 10:41 |
Aurelia Laxdal | | HP-FEBIAD | | | | | In progress | SiC-HP-FEBIAD for operator training - Source ON | Turned the source back ON. Heaters are
ramping up. |
|
|
219
|
Wednesday, October 03, 2012, 13:50 |
Aurelia Laxdal | | HP-FEBIAD | | | | | In progress | Training updates | On Monday October 1, the HP-FEBIAD source
was turned ON again, to complete the operator
training. The last session was yesterday |
|
|
222
|
Thursday, October 25, 2012, 11:13 |
Anders Mjos | Test | HP-FEBIAD | | | | | In progress | Venting chamber for installation of TiC#3 | Thursday, October 25, 2012, 11:11: Vacuum
at 1.3E-7 T
Thursday, October 25, 2012, 11:12: |
|
|
223
|
Thursday, October 25, 2012, 13:02 |
Anders Mjos | TiC#3 | LP-SIS | ITW | TM1 | | | In progress | Pumping down | Thursday, October 25, 2012, 13:00: Roughing
Thursday, October 25, 2012, 13:19
: Turbos on |
|
|
235
|
Thursday, November 29, 2012, 14:15 |
Anders Mjos | | | | | | | In progress | Venting in preparation for RFQ work | Thursday, November 29, 2012, 14:15:
Stopping turbos
Thursday, November 29, 2012, 15:57: |
|
|
238
|
Friday, November 30, 2012, 12:04 |
Anders Mjos | | | | | | | In progress | 9-pin connector installation work in progress | in preparation for RFQ testing. By Sebastian
and Anders
An insulated 9-pin D-sub connector |
|
|
239
|
Monday, December 03, 2012, 15:33 |
Anders Mjos | | | | | | | In progress | Leak check of 9-pin feed through | Base leak rate 6 - 7 E-9 mbar-l/s
A leak was found around the 9-pin
feed through. |
|
|
241
|
Tuesday, December 04, 2012, 17:27 |
Anders Mjos | RFQ empty | | | | | | In progress | Pumping down | The RFQ heating test target was installed
by Sebastian and Anders.
Tuesday, December 04, 2012, 17:26: |
|
|
242
|
Wednesday, December 05, 2012, 11:18 |
Anders Mjos | | | | | | | In progress | Leak checking 9-pin feed through | Vacuum at 4.4E-7T
Base leak rate 2 - 3 E-9 mbar-l/sec
No response above background. |
|
|
246
|
Thursday, December 13, 2012, 08:40 |
Anders Mjos | RFQ empty | | | | | | In progress | Venting | Thursday, December 13, 2012, 08:38: TBHT
and TGHT off
Thursday, December 13, 2012, 08:38 : |
|
|
249
|
Friday, December 14, 2012, 15:28 |
Anders Mjos | RFQ empty | | | | | | In progress | Venting |
|
|
|
254
|
Wednesday, December 19, 2012, 09:44 |
Sebastian Raeder | | | | | | | In progress | venting | venting and inspect the target
Wednesday, December 19, 2012, 09:43:
vqacuum at 1.9E-7T, stop turbos |
|
|
260
|
Friday, January 04, 2013, 10:52 |
Anders Mjos | | | | | | | In progress | Preparing for venting | Friday, January 04, 2013, 10:51:
Vacuum at 3.2E-7 T
Friday, January 04, 2013, 10:52: |
|
|
261
|
Friday, January 04, 2013, 15:07 |
Anders Mjos | RFQ empty | | | | | | In progress | Pumping down | Friday, January 04, 2013, 15:04: Roughing
Friday, January 04, 2013, 15:24:
Starting turbos |
|
|
263
|
Wednesday, January 09, 2013, 10:39 |
Anders Mjos | RFQ empty | | | | | | In progress | Venting | Wednesday, January 09, 2013, 10:38:
Turbos off. Vacuum at 1.7 E-7 T
Wednesday, January 09, 2013, 13:24 |
|
|
265
|
Friday, January 11, 2013, 08:37 |
Anders Mjos | Empty | | | | | | In progress | Venting | Friday, January 11, 2013, 08:36: Venting
for installation of RFQ test target later
today |
|
|
267
|
Monday, January 14, 2013, 13:51 |
Sebastian Raeder | RFQ empty | | | | | | In progress | heating | Started heating the target, now Silica
sleevings are installed for wire insulation
and the gap target -- repeller is now 0.6mm |
|
|
272
|
Thursday, January 17, 2013, 08:16 |
Sebastian Raeder | RFQ empty | | | | | | In progress | heating | Thursday, January 17, 2013, 08:16: started
heating of the target, vacuum at 2.6E-7T
Thursday, January 17, 2013, |
|
|
276
|
Friday, January 18, 2013, 16:17 |
Anders Mjos | RFQ empty | | | | | | In progress | heating |
|
|
|