  217   Friday, September 28, 2012, 09:59 Aurelia Laxdal      In progressSiC-HP-FEBIAD for operator training - Source OffChecked with ISAC Ops this morning and
they are not available for FEBIAD training.
Turned off the source until next week.
  
  218   Monday, October 01, 2012, 10:41 Aurelia Laxdal HP-FEBIAD    In progressSiC-HP-FEBIAD for operator training - Source ON Turned the source back ON. Heaters are
ramping up.
  
  219   Wednesday, October 03, 2012, 13:50 Aurelia Laxdal HP-FEBIAD    In progressTraining updatesOn Monday October 1, the HP-FEBIAD source
was turned ON again, to complete the operator
training. The last session was yesterday
  
  222   Thursday, October 25, 2012, 11:13 Anders MjosTestHP-FEBIAD    In progressVenting chamber for installation of TiC#3Thursday, October 25, 2012, 11:11: Vacuum
at 1.3E-7 T
Thursday, October 25, 2012, 11:12:
  
  223   Thursday, October 25, 2012, 13:02 Anders MjosTiC#3LP-SISITWTM1  In progressPumping downThursday, October 25, 2012, 13:00: Roughing
Thursday, October 25, 2012, 13:19
: Turbos on
  
  235   Thursday, November 29, 2012, 14:15 Anders Mjos      In progressVenting in preparation for RFQ work Thursday, November 29, 2012, 14:15:
Stopping turbos
Thursday, November 29, 2012, 15:57:
  
  238   Friday, November 30, 2012, 12:04 Anders Mjos      In progress9-pin connector installation work in progressin preparation for RFQ testing. By Sebastian
and Anders
An insulated  9-pin D-sub connector
  
  239   Monday, December 03, 2012, 15:33 Anders Mjos      In progressLeak check of 9-pin feed throughBase leak rate 6 - 7 E-9 mbar-l/s
A leak was found around the 9-pin
feed through.
  
  241   Tuesday, December 04, 2012, 17:27 Anders MjosRFQ empty     In progressPumping downThe RFQ heating test target was installed
by Sebastian and Anders.
Tuesday, December 04, 2012, 17:26:
  
  242   Wednesday, December 05, 2012, 11:18 Anders Mjos      In progressLeak checking 9-pin feed throughVacuum at 4.4E-7T
Base leak rate 2 - 3 E-9 mbar-l/sec
No response above background.
  
  246   Thursday, December 13, 2012, 08:40 Anders MjosRFQ empty     In progressVentingThursday, December 13, 2012, 08:38: TBHT
and TGHT off
Thursday, December 13, 2012, 08:38 :
  
  249   Friday, December 14, 2012, 15:28 Anders MjosRFQ empty     In progressVenting

    

       
            
  
  254   Wednesday, December 19, 2012, 09:44 Sebastian Raeder      In progressventingventing and inspect the target
Wednesday, December 19, 2012, 09:43:
vqacuum at 1.9E-7T, stop turbos
  
  260   Friday, January 04, 2013, 10:52 Anders Mjos      In progressPreparing for venting Friday, January 04, 2013, 10:51:
Vacuum at 3.2E-7 T
Friday, January 04, 2013, 10:52:
  
  261   Friday, January 04, 2013, 15:07 Anders MjosRFQ empty     In progressPumping downFriday, January 04, 2013, 15:04: Roughing
Friday, January 04, 2013, 15:24:
Starting turbos
  
  263   Wednesday, January 09, 2013, 10:39 Anders MjosRFQ empty     In progressVenting Wednesday, January 09, 2013, 10:38:
Turbos off. Vacuum at 1.7 E-7 T
Wednesday, January 09, 2013, 13:24
  
  265   Friday, January 11, 2013, 08:37 Anders MjosEmpty     In progressVentingFriday, January 11, 2013, 08:36: Venting
for installation of RFQ test target later
today
  
  267   Monday, January 14, 2013, 13:51 Sebastian RaederRFQ empty     In progressheatingStarted heating the target, now Silica
sleevings are installed for wire insulation
and the gap target -- repeller is now 0.6mm
  
  272   Thursday, January 17, 2013, 08:16 Sebastian RaederRFQ empty     In progressheatingThursday, January 17, 2013, 08:16: started
heating of the target, vacuum at 2.6E-7T
 Thursday, January 17, 2013,
  
  276   Friday, January 18, 2013, 16:17 Anders MjosRFQ empty     In progressheating 

    
 Test_Stand_cooling_temp_data_2013-01-16.pdfTest_Stand_strip_tool_TGHT_CUR_2013-01-16.PNG 