Entry  Friday, September 28, 2012, 09:59, Aurelia Laxdal, , , , , , , In progress, SiC-HP-FEBIAD for operator training - Source Off 

Checked with ISAC Ops this morning and they are not available for FEBIAD training. Turned off the source until next week.

Entry  Monday, October 01, 2012, 10:41, Aurelia Laxdal, , HP-FEBIAD, , , , , In progress, SiC-HP-FEBIAD for operator training - Source ON  

Turned the source back ON. Heaters are ramping up.

Entry  Wednesday, October 03, 2012, 13:50, Aurelia Laxdal, , HP-FEBIAD, , , , , In progress, Training updates 

On Monday October 1, the HP-FEBIAD source was turned ON again, to complete the operator training. The last session was yesterday and for the time being the ISAC operators can play with the source when time allows, and from the ISAC Control room. For this purpose the source will be kept on this week and also over the week-end.

Entry  Thursday, October 25, 2012, 11:13, Anders Mjos, Test, HP-FEBIAD, , , , , In progress, Venting chamber for installation of TiC#3 

Thursday, October 25, 2012, 11:11: Vacuum at 1.3E-7 T

Thursday, October 25, 2012, 11:12: Turbos off

Thursday, October 25, 2012, 11:50: Venting

Entry  Thursday, October 25, 2012, 13:02, Anders Mjos, TiC#3, LP-SIS, ITW, TM1, , , In progress, Pumping down 

Thursday, October 25, 2012, 13:00: Roughing

Thursday, October 25, 2012, 13:19 : Turbos on

Thursday, October 25, 2012, 13:28 : Turbos at speed

Thursday, October 25, 2012, 13:29 : Vacuum at 1.6E-5 T

Entry  Thursday, November 29, 2012, 14:15, Anders Mjos, , , , , , , In progress, Venting in preparation for RFQ work 

 Thursday, November 29, 2012, 14:15: Stopping turbos

Thursday, November 29, 2012, 15:57: Venting

Entry  Friday, November 30, 2012, 12:04, Anders Mjos, , , , , , , In progress, 9-pin connector installation work in progress 

in preparation for RFQ testing. By Sebastian and Anders

An insulated  9-pin D-sub connector was installed on the service cap in port Q (as labeled in ISK4523). The connector mating to the target assembly was placed in the upper slot on the source tray.

Friday, November 30, 2012, 14:57: Rouging in preparation for leak check (next week).

Friday, November 30, 2012, 15:16: Turbos on

Friday, November 30, 2012, 15:25 : Turbos at speed

Friday, November 30, 2012, 15:26 : Vacuum at 3.4E-5 T

Entry  Monday, December 03, 2012, 15:33, Anders Mjos, , , , , , , In progress, Leak check of 9-pin feed through 

Base leak rate 6 - 7 E-9 mbar-l/s

A leak was found around the 9-pin feed through.

Entry  Tuesday, December 04, 2012, 17:27, Anders Mjos, RFQ empty, , , , , , In progress, Pumping down 

The RFQ heating test target was installed by Sebastian and Anders.

Tuesday, December 04, 2012, 17:26: roughing

Tuesday, December 04, 2012, 17:45: starting turbos

Tuesday, December 04, 2012, 17:55 : turbos at speed

Tuesday, December 04, 2012, 17:55 : vacuum at 3.3E-5 T

Entry  Wednesday, December 05, 2012, 11:18, Anders Mjos, , , , , , , In progress, Leak checking 9-pin feed through 

Vacuum at 4.4E-7T

Base leak rate 2 - 3 E-9 mbar-l/sec

No response above background.

Entry  Thursday, December 13, 2012, 08:40, Anders Mjos, RFQ empty, , , , , , In progress, Venting 

Thursday, December 13, 2012, 08:38: TBHT and TGHT off

Thursday, December 13, 2012, 08:38 : Vacuum at 1.8E-7 T

Thursday, December 13, 2012, 08:38 : Turbos off

Thursday, December 13, 2012, 11:19: Venting

Thursday, December 13, 2012, 11:30: Water lines purged

Thursday, December 13, 2012, 11:41: Target removed for inspection.

    Reply  Friday, December 14, 2012, 15:28, Anders Mjos, RFQ empty, , , , , , In progress, Venting 

Sebastian Raeder wrote:

Friday, December 14, 2012, 14:24 Stop Turbopumps and prepare venting to insert RFQ target

Friday, December 14, 2012, 15:27 : Venting

Entry  Wednesday, December 19, 2012, 09:44, Sebastian Raeder, , , , , , , In progress, venting 

venting and inspect the target

Wednesday, December 19, 2012, 09:43: vqacuum at 1.9E-7T, stop turbos

Entry  Friday, January 04, 2013, 10:52, Anders Mjos, , , , , , , In progress, Preparing for venting 

 Friday, January 04, 2013, 10:51: Vacuum at 3.2E-7 T

Friday, January 04, 2013, 10:52: Turbos stopped

Friday, January 04, 2013, 13:50: Venting

Entry  Friday, January 04, 2013, 15:07, Anders Mjos, RFQ empty, , , , , , In progress, Pumping down 

Friday, January 04, 2013, 15:04: Roughing

Friday, January 04, 2013, 15:24: Starting turbos

Friday, January 04, 2013, 15:33 : Turbos at speed

Friday, January 04, 2013, 15:34 : Vacuum at 1.7E-5 T

Entry  Wednesday, January 09, 2013, 10:39, Anders Mjos, RFQ empty, , , , , , In progress, Venting 

 Wednesday, January 09, 2013, 10:38: Turbos off. Vacuum at 1.7 E-7 T

Wednesday, January 09, 2013, 13:24 : Venting with nitgogen

Wednesday, January 09, 2013, 14:12: Target removed

Entry  Friday, January 11, 2013, 08:37, Anders Mjos, Empty, , , , , , In progress, Venting 

Friday, January 11, 2013, 08:36: Venting for installation of RFQ test target later today

Entry  Monday, January 14, 2013, 13:51, Sebastian Raeder, RFQ empty, , , , , , In progress, heating 

Started heating the target, now Silica sleevings are installed for wire insulation and the gap target -- repeller is now 0.6mm (was 0.25mm)

Entry  Thursday, January 17, 2013, 08:16, Sebastian Raeder, RFQ empty, , , , , , In progress, heating 

Thursday, January 17, 2013, 08:16: started heating of the target, vacuum at 2.6E-7T

 Thursday, January 17, 2013, 14:55: current at 572A/6.95V (panel reading), vacuum at 6.7E-7T

Thursday, January 17, 2013, 18:40: measurements done, vacuum at 5.3E-7T, current 572V/6.94V, start cooling down

    Reply  Friday, January 18, 2013, 16:17, Anders Mjos, RFQ empty, , , , , , In progress, heating Test_Stand_cooling_temp_data_2013-01-16.pdfTest_Stand_strip_tool_TGHT_CUR_2013-01-16.PNG

 

Sebastian Raeder wrote:

Thursday, January 17, 2013, 08:16: started heating of the target, vacuum at 2.6E-7T

 Thursday, January 17, 2013, 14:55: current at 572A/6.95V (panel reading), vacuum at 6.7E-7T

Thursday, January 17, 2013, 18:40: measurements done, vacuum at 5.3E-7T, current 572V/6.94V, start cooling down

 

 The temperature of the cooling water was logged during this test. See attachments for details. Note that current and voltage read back is not available due to trouble with the power supply. One thermocouple (Heat Shield circuit) came loose before the end of the test (not shown in plot).