  Test-Stand, Page 19 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject
  217   Friday, September 28, 2012, 09:59 Aurelia Laxdal      In progressSiC-HP-FEBIAD for operator training - Source Off

Checked with ISAC Ops this morning and they are not available for FEBIAD training. Turned off the source until next week.

  218   Monday, October 01, 2012, 10:41 Aurelia Laxdal HP-FEBIAD    In progressSiC-HP-FEBIAD for operator training - Source ON

Turned the source back ON. Heaters are ramping up.

  219   Wednesday, October 03, 2012, 13:50 Aurelia Laxdal HP-FEBIAD    In progressTraining updates

On Monday October 1, the HP-FEBIAD source was turned ON again, to complete the operator training. The last session was yesterday and for the time being the ISAC operators can play with the source when time allows, and from the ISAC Control room. For this purpose the source will be kept on this week and also over the week-end.

  222   Thursday, October 25, 2012, 11:13 Anders MjosTestHP-FEBIAD    In progressVenting chamber for installation of TiC#3

Thursday, October 25, 2012, 11:11: Vacuum at 1.3E-7 T

Thursday, October 25, 2012, 11:12: Turbos off

Thursday, October 25, 2012, 11:50: Venting

  223   Thursday, October 25, 2012, 13:02 Anders MjosTiC#3LP-SISITWTM1  In progressPumping down

Thursday, October 25, 2012, 13:00: Roughing

Thursday, October 25, 2012, 13:19 : Turbos on

Thursday, October 25, 2012, 13:28 : Turbos at speed

Thursday, October 25, 2012, 13:29 : Vacuum at 1.6E-5 T

  235   Thursday, November 29, 2012, 14:15 Anders Mjos      In progressVenting in preparation for RFQ work

 Thursday, November 29, 2012, 14:15: Stopping turbos

Thursday, November 29, 2012, 15:57: Venting

  238   Friday, November 30, 2012, 12:04 Anders Mjos      In progress9-pin connector installation work in progress

in preparation for RFQ testing. By Sebastian and Anders

An insulated  9-pin D-sub connector was installed on the service cap in port Q (as labeled in ISK4523). The connector mating to the target assembly was placed in the upper slot on the source tray.

Friday, November 30, 2012, 14:57: Rouging in preparation for leak check (next week).

Friday, November 30, 2012, 15:16: Turbos on

Friday, November 30, 2012, 15:25 : Turbos at speed

Friday, November 30, 2012, 15:26 : Vacuum at 3.4E-5 T

  239   Monday, December 03, 2012, 15:33 Anders Mjos      In progressLeak check of 9-pin feed through

Base leak rate 6 - 7 E-9 mbar-l/s

A leak was found around the 9-pin feed through.

  241   Tuesday, December 04, 2012, 17:27 Anders MjosRFQ empty     In progressPumping down

The RFQ heating test target was installed by Sebastian and Anders.

Tuesday, December 04, 2012, 17:26: roughing

Tuesday, December 04, 2012, 17:45: starting turbos

Tuesday, December 04, 2012, 17:55 : turbos at speed

Tuesday, December 04, 2012, 17:55 : vacuum at 3.3E-5 T

  242   Wednesday, December 05, 2012, 11:18 Anders Mjos      In progressLeak checking 9-pin feed through

Vacuum at 4.4E-7T

Base leak rate 2 - 3 E-9 mbar-l/sec

No response above background.

  246   Thursday, December 13, 2012, 08:40 Anders MjosRFQ empty     In progressVenting

Thursday, December 13, 2012, 08:38: TBHT and TGHT off

Thursday, December 13, 2012, 08:38 : Vacuum at 1.8E-7 T

Thursday, December 13, 2012, 08:38 : Turbos off

Thursday, December 13, 2012, 11:19: Venting

Thursday, December 13, 2012, 11:30: Water lines purged

Thursday, December 13, 2012, 11:41: Target removed for inspection.

  249   Friday, December 14, 2012, 15:28 Anders MjosRFQ empty     In progressVenting

Sebastian Raeder wrote:

Friday, December 14, 2012, 14:24 Stop Turbopumps and prepare venting to insert RFQ target

Friday, December 14, 2012, 15:27 : Venting

  254   Wednesday, December 19, 2012, 09:44 Sebastian Raeder      In progressventing

venting and inspect the target

Wednesday, December 19, 2012, 09:43: vqacuum at 1.9E-7T, stop turbos

  260   Friday, January 04, 2013, 10:52 Anders Mjos      In progressPreparing for venting

 Friday, January 04, 2013, 10:51: Vacuum at 3.2E-7 T

Friday, January 04, 2013, 10:52: Turbos stopped

Friday, January 04, 2013, 13:50: Venting

  261   Friday, January 04, 2013, 15:07 Anders MjosRFQ empty     In progressPumping down

Friday, January 04, 2013, 15:04: Roughing

Friday, January 04, 2013, 15:24: Starting turbos

Friday, January 04, 2013, 15:33 : Turbos at speed

Friday, January 04, 2013, 15:34 : Vacuum at 1.7E-5 T

  263   Wednesday, January 09, 2013, 10:39 Anders MjosRFQ empty     In progressVenting

 Wednesday, January 09, 2013, 10:38: Turbos off. Vacuum at 1.7 E-7 T

Wednesday, January 09, 2013, 13:24 : Venting with nitgogen

Wednesday, January 09, 2013, 14:12: Target removed

  265   Friday, January 11, 2013, 08:37 Anders MjosEmpty     In progressVenting

Friday, January 11, 2013, 08:36: Venting for installation of RFQ test target later today

  267   Monday, January 14, 2013, 13:51 Sebastian RaederRFQ empty     In progressheating

Started heating the target, now Silica sleevings are installed for wire insulation and the gap target -- repeller is now 0.6mm (was 0.25mm)

  272   Thursday, January 17, 2013, 08:16 Sebastian RaederRFQ empty     In progressheating

Thursday, January 17, 2013, 08:16: started heating of the target, vacuum at 2.6E-7T

 Thursday, January 17, 2013, 14:55: current at 572A/6.95V (panel reading), vacuum at 6.7E-7T

Thursday, January 17, 2013, 18:40: measurements done, vacuum at 5.3E-7T, current 572V/6.94V, start cooling down

  276   Friday, January 18, 2013, 16:17 Anders MjosRFQ empty     In progressheating

 

Sebastian Raeder wrote:

Thursday, January 17, 2013, 08:16: started heating of the target, vacuum at 2.6E-7T

 Thursday, January 17, 2013, 14:55: current at 572A/6.95V (panel reading), vacuum at 6.7E-7T

Thursday, January 17, 2013, 18:40: measurements done, vacuum at 5.3E-7T, current 572V/6.94V, start cooling down

 

 The temperature of the cooling water was logged during this test. See attachments for details. Note that current and voltage read back is not available due to trouble with the power supply. One thermocouple (Heat Shield circuit) came loose before the end of the test (not shown in plot).

Attachment 1: Test_Stand_cooling_temp_data_2013-01-16.pdf
Test_Stand_cooling_temp_data_2013-01-16.pdf
Attachment 2: Test_Stand_strip_tool_TGHT_CUR_2013-01-16.PNG
Test_Stand_strip_tool_TGHT_CUR_2013-01-16.PNG