  Test-Stand, Page 18 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject Text Attachments
  176   Friday, August 17, 2012, 10:09 Pierre Bricault      In progressFEBIAD test cathode biasBacking pressure on the bender section
is quite large. TMSIG6 reads 5.09E-7 T and
TMS:CG2B reads 0.249 T!
  
  178   Thursday, August 23, 2012, 10:11 Anders Mjos      In progressVenting - installation of NiO#1Thursday, August 23, 2012, 10:10: Vacuum
2.1E-7
Thursday, August 23, 2012, 10:10:
  
  180   Thursday, August 23, 2012, 11:39 Anders MjosNiO#1HP-FEBIADITETM4  In progressNiO#1 installedThursday, August 23, 2012, 11:38: NiO#1
installed.
Thursday, August 23, 2012, 11:38:
  
  183   Monday, August 27, 2012, 13:21 Aurelia LaxdalNiO#1HP-FEBIADITETM4  In progressHV conditioning at Test Stand Did HV conditioning up to TSG:BIAS=30kV,
TSH=EE=-600V
Turned off the HV for Kazuya to check
  
  184   Monday, August 27, 2012, 15:21 Aurelia Laxdal      In progressXantrex PS 10-600 for TSH:TGHT is not working When turned ON it was not going higher
than 3.6A (EPICS/front panel).  Kazuya checked
the connections at the back and also the
  
  185   Tuesday, August 28, 2012, 16:57 Aurelia Laxdal HP-FEBIADITETM4  In progressUpdates for NiO#1 at Test StandTested the power supplies and locked up
the HV cage.
Turned on the HV: 30kV.
  
  186   Wednesday, August 29, 2012, 11:34 Aurelia Laxdal HP-FEBIADITETM4  In progressNiO#1 heating startup & few checksFriedhelm checked the voltage across R4
from ISK4563D-rev2.pdf. It shows 50 kOhms
with the power supplies off and everything
  
  187   Thursday, August 30, 2012, 14:34 Aurelia Laxdal HP-FEBIADITETM4  In progressNiO#1 updates

Normal
0




false
false
false
  
  188   Thursday, August 30, 2012, 16:51 Aurelia Laxdal HP-FEBIADITETM4  In progressNiO#1 cooldown startedStarted the cooldown.   
  192   Friday, August 31, 2012, 13:59 Anders MjosNb#7LP-SISITWTM1  In progressNb#7 installedFriday, August 31, 2012, 15:19: roughing
Friday, August 31, 2012, 15:39 :
starting turbos
  
  195   Friday, September 07, 2012, 12:11 Friedhelm AmesNB#7LP-SIS    In progressmass scan startedmass scan has been started after optimization
on 23Na
  
  198   Tuesday, September 11, 2012, 13:13 Friedhelm AmesNb#7LP-SIS    In progressstart cool downstart cooldown. Found computer at teststand
off. Somebody tried to login with username
ARIEL.
  
  200   Wednesday, September 12, 2012, 08:02 Anders MjosNb#7LP-SISITWTM1  In progressVentingWednesday, September 12, 2012, 08:01: Turbos
off
Wednesday, September 12, 2012, 13:35:
  
  201   Wednesday, September 12, 2012, 17:04 Anders MjosNb#7LP-SISITWTM1  In progressPumping down - w/replaced insulatorsReplaced swollen insulator and added Ta
heat shield on insulator.
 
  
  202   Thursday, September 13, 2012, 08:24 Anders MjosNb#7LP-SISITWTM1  In progressWater onThursday, September 13, 2012, 08:16: Opened
up cooling water. Vacuum (IG1) increased
from 5.9E-7 to 6.2E-7 before returning to
  
  205   Friday, September 14, 2012, 16:33 Anders Mjos      In progressPumping down empty chamberFriday, September 14, 2012, 16:33: Roughing
Friday, September 14, 2012, 16:57:
Starting turbos
  
  206   Thursday, September 20, 2012, 14:24 Anders Mjos      In progressVenting - installation of FEBIAD test target for operator trainingThursday, September 20, 2012, 14:24: Turbos
off
Thursday, September 20, 2012, 15:20:
  
  207   Thursday, September 20, 2012, 15:52 Anders MjosTEST SiCHP-FEBIAD    In progressInstallilng SiC-HP-FEBIAD target for operator trainingThursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54:
Aborting. VCR for gas line not connected.
  
  208   Friday, September 21, 2012, 08:20 Anders MjosTEST SiCHP-FEBIAD    In progressInstallilng SiC-HP-FEBIAD target for operator training

    

       
            
  
  216   Thursday, September 27, 2012, 12:27 Aurelia Laxdal      In progressSiC-HP-FEBIAD for operator trainingThe source was used yesterday for operator
training.
Today, I found the source off: the
  