176
|
Friday, August 17, 2012, 10:09 |
Pierre Bricault | | | | | | | In progress | FEBIAD test cathode bias | Backing pressure on the bender section
is quite large. TMSIG6 reads 5.09E-7 T and
TMS:CG2B reads 0.249 T! |
|
|
178
|
Thursday, August 23, 2012, 10:11 |
Anders Mjos | | | | | | | In progress | Venting - installation of NiO#1 | Thursday, August 23, 2012, 10:10: Vacuum
2.1E-7
Thursday, August 23, 2012, 10:10: |
|
|
180
|
Thursday, August 23, 2012, 11:39 |
Anders Mjos | NiO#1 | HP-FEBIAD | ITE | TM4 | | | In progress | NiO#1 installed | Thursday, August 23, 2012, 11:38: NiO#1
installed.
Thursday, August 23, 2012, 11:38: |
|
|
183
|
Monday, August 27, 2012, 13:21 |
Aurelia Laxdal | NiO#1 | HP-FEBIAD | ITE | TM4 | | | In progress | HV conditioning at Test Stand | Did HV conditioning up to TSG:BIAS=30kV,
TSH=EE=-600V
Turned off the HV for Kazuya to check |
|
|
184
|
Monday, August 27, 2012, 15:21 |
Aurelia Laxdal | | | | | | | In progress | Xantrex PS 10-600 for TSH:TGHT is not working | When turned ON it was not going higher
than 3.6A (EPICS/front panel). Kazuya checked
the connections at the back and also the |
|
|
185
|
Tuesday, August 28, 2012, 16:57 |
Aurelia Laxdal | | HP-FEBIAD | ITE | TM4 | | | In progress | Updates for NiO#1 at Test Stand | Tested the power supplies and locked up
the HV cage.
Turned on the HV: 30kV. |
|
|
186
|
Wednesday, August 29, 2012, 11:34 |
Aurelia Laxdal | | HP-FEBIAD | ITE | TM4 | | | In progress | NiO#1 heating startup & few checks | Friedhelm checked the voltage across R4
from ISK4563D-rev2.pdf. It shows 50 kOhms
with the power supplies off and everything |
|
|
187
|
Thursday, August 30, 2012, 14:34 |
Aurelia Laxdal | | HP-FEBIAD | ITE | TM4 | | | In progress | NiO#1 updates |
Normal
0
false
false
false
|
|
|
188
|
Thursday, August 30, 2012, 16:51 |
Aurelia Laxdal | | HP-FEBIAD | ITE | TM4 | | | In progress | NiO#1 cooldown started | Started the cooldown. |
|
|
192
|
Friday, August 31, 2012, 13:59 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | In progress | Nb#7 installed | Friday, August 31, 2012, 15:19: roughing
Friday, August 31, 2012, 15:39 :
starting turbos |
|
|
195
|
Friday, September 07, 2012, 12:11 |
Friedhelm Ames | NB#7 | LP-SIS | | | | | In progress | mass scan started | mass scan has been started after optimization
on 23Na |
|
|
198
|
Tuesday, September 11, 2012, 13:13 |
Friedhelm Ames | Nb#7 | LP-SIS | | | | | In progress | start cool down | start cooldown. Found computer at teststand
off. Somebody tried to login with username
ARIEL. |
|
|
200
|
Wednesday, September 12, 2012, 08:02 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | In progress | Venting | Wednesday, September 12, 2012, 08:01: Turbos
off
Wednesday, September 12, 2012, 13:35: |
|
|
201
|
Wednesday, September 12, 2012, 17:04 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | In progress | Pumping down - w/replaced insulators | Replaced swollen insulator and added Ta
heat shield on insulator.
|
|
|
202
|
Thursday, September 13, 2012, 08:24 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | In progress | Water on | Thursday, September 13, 2012, 08:16: Opened
up cooling water. Vacuum (IG1) increased
from 5.9E-7 to 6.2E-7 before returning to |
|
|
205
|
Friday, September 14, 2012, 16:33 |
Anders Mjos | | | | | | | In progress | Pumping down empty chamber | Friday, September 14, 2012, 16:33: Roughing
Friday, September 14, 2012, 16:57:
Starting turbos |
|
|
206
|
Thursday, September 20, 2012, 14:24 |
Anders Mjos | | | | | | | In progress | Venting - installation of FEBIAD test target for operator training | Thursday, September 20, 2012, 14:24: Turbos
off
Thursday, September 20, 2012, 15:20: |
|
|
207
|
Thursday, September 20, 2012, 15:52 |
Anders Mjos | TEST SiC | HP-FEBIAD | | | | | In progress | Installilng SiC-HP-FEBIAD target for operator training | Thursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54:
Aborting. VCR for gas line not connected. |
|
|
208
|
Friday, September 21, 2012, 08:20 |
Anders Mjos | TEST SiC | HP-FEBIAD | | | | | In progress | Installilng SiC-HP-FEBIAD target for operator training |
|
|
|
216
|
Thursday, September 27, 2012, 12:27 |
Aurelia Laxdal | | | | | | | In progress | SiC-HP-FEBIAD for operator training | The source was used yesterday for operator
training.
Today, I found the source off: the |
|