176
|
Friday, August 17, 2012, 10:09 |
Pierre Bricault | | | | | | | In progress | FEBIAD test cathode bias | Backing pressure on the bender section is quite large. TMSIG6 reads 5.09E-7 T and TMS:CG2B reads 0.249 T! |
|
178
|
Thursday, August 23, 2012, 10:11 |
Anders Mjos | | | | | | | In progress | Venting - installation of NiO#1 | Thursday, August 23, 2012, 10:10: Vacuum 2.1E-7
Thursday, August 23, 2012, 10:10: Stopped both turbos.
Thursday, August 23, 2012, 10:20: Water purged.
Thursday, August 23, 2012, 10:53: Venting |
|
180
|
Thursday, August 23, 2012, 11:39 |
Anders Mjos | NiO#1 | HP-FEBIAD | ITE | TM4 | | | In progress | NiO#1 installed | Thursday, August 23, 2012, 11:38: NiO#1 installed.
Thursday, August 23, 2012, 11:38: Started roughing. Both roughing pumps timed out.
Thursday, August 23, 2012, 11:54: Roughing.
Thursday, August 23, 2012, 12:12 : Starting turbos.
Thursday, August 23, 2012, 12:16 : TP1B at speed.
Thursday, August 23, 2012, 12:20 : TP1A timed out. Restarted.
Thursday, August 23, 2012, 12:20 : Turbos at speed. Vacuum at 2.5E-5
Thursday, August 23, 2012, 12:22: Vacuum at 2E-5
Friday, August 24, 2012, 08:26: Vacuum at 3.1E-7 |
|
183
|
Monday, August 27, 2012, 13:21 |
Aurelia Laxdal | NiO#1 | HP-FEBIAD | ITE | TM4 | | | In progress | HV conditioning at Test Stand | Did HV conditioning up to TSG:BIAS=30kV, TSH=EE=-600V
Turned off the HV for Kazuya to check the connection/output of the TSG:TGHT Xantrex power supply. |
|
184
|
Monday, August 27, 2012, 15:21 |
Aurelia Laxdal | | | | | | | In progress | Xantrex PS 10-600 for TSH:TGHT is not working | When turned ON it was not going higher than 3.6A (EPICS/front panel). Kazuya checked the connections at the back and also the EPICS/PLC/PS input/output signals. He compared these values with the similar once of the TSH:TBHT PS (which is also a Xantrex PS 10-600). E-Fault 6275
It turned out to be the connections on the top of the ion source box: the target heater was not connected and the power supply was not seeing the load. Tomorrow we'll check all the top connections, with the corresponding power supplies. |
|
185
|
Tuesday, August 28, 2012, 16:57 |
Aurelia Laxdal | | HP-FEBIAD | ITE | TM4 | | | In progress | Updates for NiO#1 at Test Stand | Tested the power supplies and locked up the HV cage.
Turned on the HV: 30kV.
Tomorrow we'll start up the heaters: 580A for the target and 280-300A for the tube. |
|
186
|
Wednesday, August 29, 2012, 11:34 |
Aurelia Laxdal | | HP-FEBIAD | ITE | TM4 | | | In progress | NiO#1 heating startup & few checks | Friedhelm checked the voltage across R4 from ISK4563D-rev2.pdf. It shows 50 kOhms with the power supplies off and everything connected according to the drawing. With the Anode PS On and set at 20V, we could see the same readback on EPICS and on the meter.
Then started the heater ramping: auto ramp 2A/min.
We'd be watching the vacuum carefully during this process. Also the setup is such that:
- the target and tube heaters are only incremented if the vacuum is less than 5e-6Torr
- and if the vacuum exceeds 2e-5Torr the last increment of the target and tube heater is backed off.
Pierre asked for the 2e-5Torr limit to be changed to 8e-6Torr.
Anders asked to stop the heating at 500A to take a temperature measurement.
Raising the target heater from 500A to 580A.
Did a mass scan at TGHT=580A & TBHT=280A: Plotdump-local-clean.txt Aug29 12 19-53-16.txt
http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html |
|
187
|
Thursday, August 30, 2012, 14:34 |
Aurelia Laxdal | | HP-FEBIAD | ITE | TM4 | | | In progress | NiO#1 updates |
Did another mass scan at 280A for the ionizer:
Plotdump-local-clean.txt Aug30 12 14-28-14.txt
http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html
Ramping up the TBHT from 280A -> 290A
And from 290A -> 300A:
Plotdump-local-clean.txt Aug30 12 16-40-29.txt
http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html |
|
188
|
Thursday, August 30, 2012, 16:51 |
Aurelia Laxdal | | HP-FEBIAD | ITE | TM4 | | | In progress | NiO#1 cooldown started | Started the cooldown. |
|
192
|
Friday, August 31, 2012, 13:59 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | In progress | Nb#7 installed | Friday, August 31, 2012, 15:19: roughing
Friday, August 31, 2012, 15:39 : starting turbos
Friday, August 31, 2012, 15:44 : TP1B at speed
Friday, August 31, 2012, 15:48 : TP1A timed out
Friday, August 31, 2012, 15:48 : TP1A restarted. at speed.
Friday, August 31, 2012, 15:49 : both turbos at speed. Vacuum @2.7E-5 |
|
195
|
Friday, September 07, 2012, 12:11 |
Friedhelm Ames | NB#7 | LP-SIS | | | | | In progress | mass scan started | mass scan has been started after optimization on 23Na |
|
198
|
Tuesday, September 11, 2012, 13:13 |
Friedhelm Ames | Nb#7 | LP-SIS | | | | | In progress | start cool down | start cooldown. Found computer at teststand off. Somebody tried to login with username ARIEL. |
|
200
|
Wednesday, September 12, 2012, 08:02 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | In progress | Venting | Wednesday, September 12, 2012, 08:01: Turbos off
Wednesday, September 12, 2012, 13:35: Venting, water off and purged.
Wednesday, September 12, 2012, 13:55: Vented |
|
201
|
Wednesday, September 12, 2012, 17:04 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | In progress | Pumping down - w/replaced insulators | Replaced swollen insulator and added Ta heat shield on insulator.
Wednesday, September 12, 2012, 17:03: Roughing
Wednesday, September 12, 2012, 17:23 : Starting turbos
Wednesday, September 12, 2012, 17:32 : Turbos at speed
Wednesday, September 12, 2012, 17:33 : Vacuum at 3.2E-5 |
|
202
|
Thursday, September 13, 2012, 08:24 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | In progress | Water on | Thursday, September 13, 2012, 08:16: Opened up cooling water. Vacuum (IG1) increased from 5.9E-7 to 6.2E-7 before returning to 5.9E-7. Similar response on IG6 (valve closed). Response is however similar to previous (short time ~5 min) vacuum fluctuations. |
|
205
|
Friday, September 14, 2012, 16:33 |
Anders Mjos | | | | | | | In progress | Pumping down empty chamber | Friday, September 14, 2012, 16:33: Roughing
Friday, September 14, 2012, 16:57: Starting turbos
Friday, September 14, 2012, 17:05 : Turbos at speed
Friday, September 14, 2012, 17:07: Vacuum at 8.7E-6
|
|
206
|
Thursday, September 20, 2012, 14:24 |
Anders Mjos | | | | | | | In progress | Venting - installation of FEBIAD test target for operator training | Thursday, September 20, 2012, 14:24: Turbos off
Thursday, September 20, 2012, 15:20: Venting |
|
207
|
Thursday, September 20, 2012, 15:52 |
Anders Mjos | TEST SiC | HP-FEBIAD | | | | | In progress | Installilng SiC-HP-FEBIAD target for operator training | Thursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.
Thursday, September 20, 2012, 16:09: Roughing
Thursday, September 20, 2012, 16:29: Starting turbos
Thursday, September 20, 2012, 16:38 : Turbos at speed
Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr
|
|
208
|
Friday, September 21, 2012, 08:20 |
Anders Mjos | TEST SiC | HP-FEBIAD | | | | | In progress | Installilng SiC-HP-FEBIAD target for operator training |
Anders Mjos wrote: |
Thursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.
Thursday, September 20, 2012, 16:09: Roughing
Thursday, September 20, 2012, 16:29: Starting turbos
Thursday, September 20, 2012, 16:38 : Turbos at speed
Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr
|
Friday, September 21, 2012, 08:19: Cooling water on. Vacuum stable at 2.3E-7 torr. |
|
216
|
Thursday, September 27, 2012, 12:27 |
Aurelia Laxdal | | | | | | | In progress | SiC-HP-FEBIAD for operator training | The source was used yesterday for operator training.
Today, I found the source off: the ISAC PLC Status was stopped. Kazuya re-started the PLC. I will re-start the source. |
|