  176   Friday, August 17, 2012, 10:09 Pierre Bricault      In progressFEBIAD test cathode bias

Backing pressure on the bender section is quite large. TMSIG6 reads 5.09E-7 T and TMS:CG2B reads 0.249 T!

  178   Thursday, August 23, 2012, 10:11 Anders Mjos      In progressVenting - installation of NiO#1

Thursday, August 23, 2012, 10:10: Vacuum 2.1E-7

Thursday, August 23, 2012, 10:10: Stopped both turbos.

Thursday, August 23, 2012, 10:20: Water purged.

Thursday, August 23, 2012, 10:53: Venting

  180   Thursday, August 23, 2012, 11:39 Anders MjosNiO#1HP-FEBIADITETM4  In progressNiO#1 installed

Thursday, August 23, 2012, 11:38: NiO#1 installed.

Thursday, August 23, 2012, 11:38: Started roughing. Both roughing pumps timed out.

Thursday, August 23, 2012, 11:54: Roughing.

Thursday, August 23, 2012, 12:12 : Starting turbos.

Thursday, August 23, 2012, 12:16 : TP1B at speed.

Thursday, August 23, 2012, 12:20 : TP1A timed out. Restarted.

Thursday, August 23, 2012, 12:20 : Turbos at speed. Vacuum at 2.5E-5

Thursday, August 23, 2012, 12:22: Vacuum at 2E-5

Friday, August 24, 2012, 08:26: Vacuum at 3.1E-7

  183   Monday, August 27, 2012, 13:21 Aurelia LaxdalNiO#1HP-FEBIADITETM4  In progressHV conditioning at Test Stand

Did HV conditioning up to TSG:BIAS=30kV, TSH=EE=-600V

Turned off the HV for Kazuya to check the connection/output of the TSG:TGHT Xantrex power supply.

  184   Monday, August 27, 2012, 15:21 Aurelia Laxdal      In progressXantrex PS 10-600 for TSH:TGHT is not working

When turned ON it was not going higher than 3.6A (EPICS/front panel). Kazuya checked the connections at the back and also the EPICS/PLC/PS input/output signals. He compared these values with the similar once of the TSH:TBHT PS (which is also a Xantrex PS 10-600). E-Fault 6275

It turned out to be the connections on the top of the ion source box: the target heater was not connected and the power supply was not seeing the load. Tomorrow we'll check all the top connections, with the corresponding power supplies.

  185   Tuesday, August 28, 2012, 16:57 Aurelia Laxdal HP-FEBIADITETM4  In progressUpdates for NiO#1 at Test Stand

Tested the power supplies and locked up the HV cage.

Turned on the HV: 30kV.

Tomorrow we'll start up the heaters: 580A for the target and 280-300A for the tube.

  186   Wednesday, August 29, 2012, 11:34 Aurelia Laxdal HP-FEBIADITETM4  In progressNiO#1 heating startup & few checks

Friedhelm checked the voltage across R4 from ISK4563D-rev2.pdf. It shows 50 kOhms with the power supplies off and everything connected according to the drawing. With the Anode PS On and set at 20V, we could see the same readback on EPICS and on the meter.

Then started the heater ramping: auto ramp 2A/min.

We'd be watching the vacuum carefully during this process. Also the setup is such that:

- the target and tube heaters are only incremented if the vacuum is less than 5e-6Torr

- and if the vacuum exceeds 2e-5Torr the last increment of the target and tube heater is backed off.

Pierre asked for the 2e-5Torr limit to be changed to 8e-6Torr.

Anders asked to stop the heating at 500A to take a temperature measurement.

Raising the target heater from 500A to 580A.

Did a mass scan at TGHT=580A & TBHT=280A:  Plotdump-local-clean.txt Aug29 12 19-53-16.txt

http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html

  187   Thursday, August 30, 2012, 14:34 Aurelia Laxdal HP-FEBIADITETM4  In progressNiO#1 updates

Did another mass scan at 280A for the ionizer:

Plotdump-local-clean.txt Aug30 12 14-28-14.txt

http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html

Ramping up the TBHT from 280A -> 290A

 

And from 290A -> 300A:

Plotdump-local-clean.txt Aug30 12 16-40-29.txt

http://isacwserv.triumf.ca/onlylocal/isac/IsacInternalFrameSet.html

  188   Thursday, August 30, 2012, 16:51 Aurelia Laxdal HP-FEBIADITETM4  In progressNiO#1 cooldown started

Started the cooldown.

  192   Friday, August 31, 2012, 13:59 Anders MjosNb#7LP-SISITWTM1  In progressNb#7 installed

Friday, August 31, 2012, 15:19: roughing

Friday, August 31, 2012, 15:39 : starting turbos

Friday, August 31, 2012, 15:44 : TP1B at speed

Friday, August 31, 2012, 15:48 : TP1A timed out

Friday, August 31, 2012, 15:48 : TP1A restarted. at speed.

Friday, August 31, 2012, 15:49 : both turbos at speed. Vacuum @2.7E-5

  195   Friday, September 07, 2012, 12:11 Friedhelm AmesNB#7LP-SIS    In progressmass scan started

mass scan has been started after optimization on 23Na

  198   Tuesday, September 11, 2012, 13:13 Friedhelm AmesNb#7LP-SIS    In progressstart cool down

start cooldown. Found computer at teststand off. Somebody tried to login with username ARIEL.

  200   Wednesday, September 12, 2012, 08:02 Anders MjosNb#7LP-SISITWTM1  In progressVenting

Wednesday, September 12, 2012, 08:01: Turbos off

Wednesday, September 12, 2012, 13:35: Venting, water off and purged.

Wednesday, September 12, 2012, 13:55: Vented

  201   Wednesday, September 12, 2012, 17:04 Anders MjosNb#7LP-SISITWTM1  In progressPumping down - w/replaced insulators

Replaced swollen insulator and added Ta heat shield on insulator.

 

Wednesday, September 12, 2012, 17:03: Roughing

Wednesday, September 12, 2012, 17:23 : Starting turbos

Wednesday, September 12, 2012, 17:32 : Turbos at speed

Wednesday, September 12, 2012, 17:33 : Vacuum at 3.2E-5

  202   Thursday, September 13, 2012, 08:24 Anders MjosNb#7LP-SISITWTM1  In progressWater on

Thursday, September 13, 2012, 08:16: Opened up cooling water. Vacuum (IG1) increased from 5.9E-7 to 6.2E-7 before returning to 5.9E-7. Similar response on IG6 (valve closed). Response is however similar to previous (short time ~5 min) vacuum fluctuations.

  205   Friday, September 14, 2012, 16:33 Anders Mjos      In progressPumping down empty chamber

Friday, September 14, 2012, 16:33: Roughing

Friday, September 14, 2012, 16:57: Starting turbos

Friday, September 14, 2012, 17:05 : Turbos at speed

Friday, September 14, 2012, 17:07: Vacuum at 8.7E-6

 

  206   Thursday, September 20, 2012, 14:24 Anders Mjos      In progressVenting - installation of FEBIAD test target for operator training

Thursday, September 20, 2012, 14:24: Turbos off

Thursday, September 20, 2012, 15:20: Venting

  207   Thursday, September 20, 2012, 15:52 Anders MjosTEST SiCHP-FEBIAD    In progressInstallilng SiC-HP-FEBIAD target for operator training

Thursday, September 20, 2012, 15:50: Roughing

Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.

Thursday, September 20, 2012, 16:09: Roughing

Thursday, September 20, 2012, 16:29: Starting turbos

Thursday, September 20, 2012, 16:38 : Turbos at speed

Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr

 

  208   Friday, September 21, 2012, 08:20 Anders MjosTEST SiCHP-FEBIAD    In progressInstallilng SiC-HP-FEBIAD target for operator training

Anders Mjos wrote:

Thursday, September 20, 2012, 15:50: Roughing

Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.

Thursday, September 20, 2012, 16:09: Roughing

Thursday, September 20, 2012, 16:29: Starting turbos

Thursday, September 20, 2012, 16:38 : Turbos at speed

Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr

 

 Friday, September 21, 2012, 08:19: Cooling water on. Vacuum stable at 2.3E-7 torr.

  216   Thursday, September 27, 2012, 12:27 Aurelia Laxdal      In progressSiC-HP-FEBIAD for operator training

The source was used yesterday for operator training.

Today, I found the source off: the ISAC PLC Status was stopped. Kazuya re-started the PLC. I will re-start the source.