56
|
Tuesday, March 06, 2012, 15:51 |
Friedhelm Ames | | | | | | | | turbopumps in mass separator section started | |
|
58
|
Wednesday, March 07, 2012, 10:36 |
Paul Mocock | | | | | | | | HV conditioning begins. | HV conditioning has begins. Vacuum chamber
pressure is currently 3.2e-07 Torr on TSG:IG1. |
|
64
|
Thursday, March 08, 2012, 17:39 |
Friedhelm Ames | | | | | | | Problems/Solutions | TPS:Q2 amd TMS:MB1 failed | TPS:Q2 and TMS:MB1 failed during the scan.
-> restarted. |
|
65
|
Thursday, March 08, 2012, 18:32 |
Friedhelm Ames | | | | | | | | mass scan crashed due to a network error | mass scan crashed due to a network error
will be restarted tomorrow |
|
69
|
Friday, March 09, 2012, 17:25 |
Friedhelm Ames | | | | | | | | heaters and HV power supplies off | heaters and HV power supplies have been
switched off
IG1 5.1e-9 T. |
|
70
|
Wednesday, April 11, 2012, 09:30 |
Friedhelm Ames | | | | | | | Failed | TSGRP1 poor vacuum | The backing pressure at TSGRP1 does not
go below 578 mT. Fault report to vacuum. |
|
71
|
Wednesday, April 11, 2012, 09:34 |
Friedhelm Ames | | | | | | | | turbopumps in mass separator section started | turbopumps in mass separator section started
after power outages |
|
74
|
Wednesday, April 18, 2012, 12:19 |
Anders Mjos | | | | | | | Problems/Solutions | Noise from roughing pump TSGRP1 | Wednesday, April 18, 2012, 12:15: Blanked
off cooling lines. Chamber ready to be pumped
down. |
|
75
|
Wednesday, April 18, 2012, 13:09 |
Anders Mjos | | | | | | | Problems/Solutions | Noise from roughing pump TSGRP1 |
|
|
78
|
Thursday, April 26, 2012, 09:14 |
Anders Mjos | | | | | | | | removed Al(CH3)3 |
|
|
79
|
Wednesday, May 09, 2012, 08:56 |
Anders Mjos | | | | | | | Problems/Solutions | TSGIG1 not working | TSGIG1 has timed out. As seen on
the attached screen shot, the IG has been
out since 17h May 1st. |
|
80
|
Wednesday, May 09, 2012, 09:16 |
Anders Mjos | | | | | | | Problems/Solutions | TSGIG1 not working |
|
|
81
|
Thursday, May 10, 2012, 08:13 |
Anders Mjos | | | | | | | Problems/Solutions | Venting for TSGIG1 repair |
|
|
82
|
Thursday, May 10, 2012, 09:48 |
Anders Mjos | | | | | | | Problems/Solutions | Ion Gauge filament replaced |
|
|
83
|
Monday, May 14, 2012, 15:36 |
Aurelia Laxdal | | | | | | | | Test Stand - IOC reboot | Did a local IOC reboot to cure to white-out.
The test stand is now operational. |
|
84
|
Monday, May 14, 2012, 16:57 |
Aurelia Laxdal | | | ITE | TM4 | | | | SiC#27-HP-SIS installed in the Test Stand | Rick and John installed the ITE-TM4-SiC#27-HP-SIS-May2012
in the Test Stand. Pumping down. |
|
87
|
Tuesday, May 15, 2012, 08:15 |
Rick Maharaj | | | | | | | | Test Stand chamber venting | |
|
88
|
Tuesday, May 15, 2012, 08:16 |
Rick Maharaj | | | | | | | | Water circuits flushed | |
|
89
|
Tuesday, May 15, 2012, 08:42 |
Rick Maharaj | | | | | | | | target removed | |
|
90
|
Tuesday, May 15, 2012, 09:46 |
Rick Maharaj | | | | | | | | target reinstalled pumping started | |
|