4
|
Thursday, September 15, 2011, 09:20 |
Anders Mjos | | | | | | | | ISAC TestStand old e-log |
link to old e-log |
5
|
Thursday, September 15, 2011, 13:46 |
Anders Mjos | FEBIAD Test | HP-FEBIAD | | | | | Failed | FEBIAD Broken Tube |
See attached file for photos of the broken tube |
Attachment 1: FEBIAD_Broken_Tube.pdf
|
|
10
|
Friday, September 23, 2011, 16:40 |
Anders Mjos | | | | | | | Problems/Solutions | 9-pin connectors swapped on source tray |
Friday, September 23, 2011, 16:3: The connection on the 9-pin connector for FEBIAD targets showed burn marks from the previous FEBIAD tests. Corresponding mark was found on the connector on the target side. Because of this the upper and lower 9-pin connectors were swapped to have a clean connector for the next FEBIAD target. |
11
|
Friday, September 23, 2011, 16:42 |
Anders Mjos | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | In progress | Target ready to be heated |
Friday, September 23, 2011, 16:4: Target installed and roughing started.
Friday, September 23, 2011, 17:12: Started turbo pumps.
Monday, September 26, 2011, 09:00: Opened up water flow. Vacuum rose from 3e-6 to 3e-5 torr in 30 s. Closed water flow.
Monday, September 26, 2011, 09:00: Venting for leak check.
Monday, September 26, 2011, 10:20: Pressurized water lines with 120 PSI He. Leak detected on right water line connection to heat shield.
Monday, September 26, 2011, 12:00: Leak repaired. Pumping down. Kapton added on target heater cooling line to prevent short with cooling line for FEBIAD coil.
Monday, September 26, 2011, 12:47: Started turbo pumps.
Monday, September 26, 2011, 15:45: Opened up water flow. Vacuum stable at 3.5e-6 torr.Target ready to be heated. |
13
|
Monday, September 26, 2011, 16:14 |
Anders Mjos | | | | | | | Problems/Solutions | Fixed leak on water line for HS, added Kapton insulation |
- While testing SiC#26 a leak was discovered on the water line to the heat shield. The leak was in the right joint (see attachment). The heat shield water lines were removed from the test stand and repaired in the Machine Shop.
- Kapton was added to the FEBIAD coil line to prevent it from shorting to the target heater line (see attachment).
|
Attachment 1: Water_Leak.pdf
|
|
Attachment 2: Kapton.pdf
|
|
19
|
Monday, October 03, 2011, 13:56 |
Anders Mjos | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Done | Venting |
Aurelia Laxdal wrote: |
Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on.
|
Monday, October 03, 2011, 13:45: Venting. |
20
|
Monday, October 03, 2011, 14:46 |
Anders Mjos | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Done | Target stored under vacuum |
Anders Mjos wrote: |
Aurelia Laxdal wrote: |
Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on.
|
Monday, October 03, 2011, 13:45: Venting.
|
Monday, October 03, 2011, 14:45
- Target was visually inspected and found to be ready to go online.
- No burn marks found on the 9-pin connectors.
- Pumping down. Target will be stored under vacuum for now. Target is scheduled to go to Hot Cell on Oct. 20th. Electrical connections (target/tube heater + coil) are not connected
|
21
|
Wednesday, October 12, 2011, 13:14 |
Anders Mjos | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Done | Target removed |
Anders Mjos wrote: |
Anders Mjos wrote: |
Aurelia Laxdal wrote: |
Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on.
|
Monday, October 03, 2011, 13:45: Venting.
|
Monday, October 03, 2011, 14:45
- Target was visually inspected and found to be ready to go online.
- No burn marks found on the 9-pin connectors.
- Pumping down. Target will be stored under vacuum for now. Target is scheduled to go to Hot Cell on Oct. 20th. Electrical connections (target/tube heater + coil) are not connected
|
Wednesday, October 12, 2011, 13:15: Venting
Wednesday, October 12, 2011, 14:15: Target brought back to lab for inspection and final check. |
23
|
Thursday, October 13, 2011, 15:42 |
Anders Mjos | Training | HP-FEBIAD | | | | | Problems/Solutions | Target ready to be heated |
Rick Maharaj wrote: |
test stand vented
|
Thursday, October 13, 2011, 15:40: Pumping down
Friday, October 14, 2011, 10:00: Cooling water is on. Pressure increase from 8e-7 to 3e-6 torr. Venting.
Friday, October 14, 2011, 11:10: Replaced seals on cooling lines with new silver plated SS seals. Pumping down.
Friday, October 14, 2011, 13:25: Cooling water is on. Vacuum at 1.35e-6 torr.
Monday, October 17, 2011, 09:00: Vacuum at 5.4e-7 torr. target ready to be heated. |
24
|
Monday, October 17, 2011, 10:22 |
Anders Mjos | FEBIAD | | | | | | Problems/Solutions | Variable leak valve replaced |
Variable leak valve with serial number F3-592 has been replaced by F3-649 due to regulating problems described previously by Fridhelm Ames. |
Attachment 1: F3-649.PDF
|
|
25
|
Monday, November 14, 2011, 15:40 |
Anders Mjos | | | | | | | Problems/Solutions | Variable leak valve repaired |
Anders Mjos wrote: |
Variable leak valve with serial number F3-592 has been replaced by F3-649 due to regulating problems described previously by Fridhelm Ames.
|
The variable leak valve
F3-592
has been repaired. Contaminated diaphragm was replaced. See attachment for details. |
Attachment 1: F3-VCR-43_Repair_F3-592.PDF
|
|
28
|
Tuesday, December 20, 2011, 16:09 |
Anders Mjos | | | | | | | Problems/Solutions | Variable leak valve repaired |
Anders Mjos wrote: |
Anders Mjos wrote: |
Variable leak valve with serial number F3-592 has been replaced by F3-649 due to regulating problems described previously by Fridhelm Ames.
|
The variable leak valve F3-592 has been repaired. Contaminated diaphragm was replaced. See attachment for details.
|
The leak valve has been tested with He and a leak detector. The leak valve could regulate in the complete range of the leak detector. 10^-11 to 10^-4 atm cc/s |
33
|
Thursday, February 16, 2012, 15:59 |
Anders Mjos | | | | | | | Problems/Solutions | He and Ne installed and gas lines leak checked |
New supply of He and Ne was installed yesterday and gas lines leak checked. The He bottle is currently closed.
UPDATE Monday, June 17, 2013, 15:17
Specifications for the currently installed Ne leak (SN: 11-231) can be found on DocuShare
https://documents.triumf.ca/docushare/dsweb/Get/Document-46969 |
49
|
Friday, March 02, 2012, 08:53 |
Anders Mjos | FEBIAD test | | | | | | Problems/Solutions | Tube heater insulator glowing |
The insulator for the tube heater was observed to be glowing with a blue shine when the target was on high voltage. The insulator was glowing on the side closest to the 9-pin connector. See attached photo. |
Attachment 1: glowing_insulator.jpg
|
|
50
|
Friday, March 02, 2012, 13:28 |
Anders Mjos | FEBIAD test | | | | | | | Venting test stand |
Venting for target exchange |
72
|
Monday, April 16, 2012, 11:16 |
Anders Mjos | Nb#6 | LP-SIS | ITW | TM1 | | | In progress | Venting, purging cooling lines |
Venting chamber and purging cooling lines in preparation for target removal |
73
|
Monday, April 16, 2012, 11:56 |
Anders Mjos | Nb#6 | LP-SIS | ITW | TM1 | | | In progress | Venting, purging cooling lines |
Anders Mjos wrote: |
Venting chamber and purging cooling lines in preparation for target removal
|
Monday, April 16, 2012, 11:55: Target removed. Cooling lines must be blanked off before pumping down. |
74
|
Wednesday, April 18, 2012, 12:19 |
Anders Mjos | | | | | | | Problems/Solutions | Noise from roughing pump TSGRP1 |
Wednesday, April 18, 2012, 12:15: Blanked off cooling lines. Chamber ready to be pumped down.
Wednesday, April 18, 2012, 12:16: TSGRP1 makes unusual noise when attempting to pump down vacuum chamber. Roughing aborted for now. Edi Dalla Valle is informed. He will have a look at it after lunch. |
75
|
Wednesday, April 18, 2012, 13:09 |
Anders Mjos | | | | | | | Problems/Solutions | Noise from roughing pump TSGRP1 |
Wednesday, April 18, 2012, 13:08 Anders Mjos wrote: |
Wednesday, April 18, 2012, 12:15: Blanked off cooling lines. Chamber ready to be pumped down.
Wednesday, April 18, 2012, 12:16: TSGRP1 makes unusual noise when attempting to pump down vacuum chamber. Roughing aborted for now. Edi Dalla Valle is informed. He will have a look at it after lunch.
|
Wednesday, April 18, 2012, 13:08: Started pumping down again with Edi present. No noise was observed. |
76
|
Wednesday, April 18, 2012, 13:10 |
Anders Mjos | No target | | | | | | In progress | Pumping down empty vacuum chamber |
Wednesday, April 18, 2012, 13:10: Roughing the vacuum chamber.
Wednesday, April 18, 2012, 13:34 : Turbo pumps started and at speed. Pressure 3.5 E-5 torr |