  Test-Stand, Page 16 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Source Stationdown Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  155   Thursday, August 09, 2012, 13:08 Pierre Bricault       Test FEBIADWaiting Rick for the fitting on the vacuum
pump.
  
  156   Friday, August 10, 2012, 11:29 Pierre BricaultNA   N ANAIn progressTest FEBIADThe helium bottle was found empty.
Rick will refill it and hook the
leak detector on the system to find out
  
  157   Friday, August 10, 2012, 12:44 Pierre BricaultNALP-FEBIAD  NANAIn progressFEBIAD testRick put the helium bottle back in the
rack.
Waiting for status of the gas lines.
  
  158   Friday, August 10, 2012, 13:48 Anders Mjos      Problems/SolutionsHe line leak checked - leak fixedA major leak was found on the connection
to the regulation valve on the He bottle.
Ferrule replaced. System leak checked.
  
  159   Friday, August 10, 2012, 14:08 Rick Maharaj       Gas line pumpGas line vacuum pump reinstalled after
fitting was modified to receive a standard
swagelok connector. The vacuum line was plumbed
  
  160   Friday, August 10, 2012, 15:29 Pierre BricaultNALP-FEBIAD  NANA finishing the gas installation and its pump1524H Start small pump.
1529H stop the pump.
 
  
  161   Friday, August 10, 2012, 15:57 Pierre Bricault        Test high voltage to 30 kV ok
Test gas valve open at 6.1 V
Test Ne leak ok
  
  162   Saturday, August 11, 2012, 13:34 Pierre BricaultNALP-FEBIAD  NANAIn progressTest FEBIAD anode bias 120 V    
  163   Saturday, August 11, 2012, 16:18 Pierre Bricault       Test FEBIAD anode biased at 120 VThe ramp up finished.
I have 3.35E-6 Amp out of the source
on FC0.
  
  164   Sunday, August 12, 2012, 21:50 Pierre Bricault      In progressTest FEBIADLost communication with EPICS. Came in
reset the ...
So far no luck.
  
  165   Sunday, August 12, 2012, 22:07 Pierre Bricault      In progressFBIAD testThe reset restored the control.
But magnet supply does not put any
amperage out.
  
  166   Monday, August 13, 2012, 08:39 Anders Mjos      Problems/SolutionsStarted ArchiversArchivers not running this morning. Started
both ISACT and SOURCES
  
  167   Monday, August 13, 2012, 10:59 Pierre Bricault      Problems/SolutionsTest FEBIADThis morning I try to contact PS group
no one answer. Dan Louie is in vacation.
I went into the can diagnostics panel
  
  168   Monday, August 13, 2012, 14:26 Pierre Bricault      In progressFEBIAD testI am done with the FEBIAD test (anode biased)
We will swap the bias now to the
cathode and change the polarity to negative.
  
  169   Monday, August 13, 2012, 14:56 Pierre Bricault      In progressFEBIAD testOne thing that seems to be strange regarding
this FEBIAD is the best results are without
any current in the coil.
  
  170   Thursday, August 16, 2012, 10:41 Pierre Bricault      In progressTest FEBIADRay is finishing the electrical modifications
for the FEBIAD with the biased cathode.
We found the source of the sparks.
  
  171   Thursday, August 16, 2012, 15:30 Anders Mjos      Problems/SolutionsVenting to investigate short between anode - cathodeThursday, August 16, 2012, 15:29: Turbos
off
Thursday, August 16, 2012, 15:50
  
  172   Thursday, August 16, 2012, 16:54 Anders Mjos      Problems/SolutionsShort between gas line and heat shieldThere was a short between the gas line
and the heat shield - as the gas line insulator
was not tied to the heat shield. A Ta-wire
  
  173   Thursday, August 16, 2012, 16:56 Anders Mjos      Problems/SolutionsTarget heater PS disconnected from controls.As per Ray Dube for the FEBIAD anode bias
test. The PS will need to be reconnected
before a target is run.
  
  174   Thursday, August 16, 2012, 16:56 Anders Mjos      In progressPumping down after troubleshootingThursday, August 16, 2012, 17:04 : Starting
turbos
Thursday, August 16, 2012, 17:09
  