  211   Monday, September 24, 2012, 13:52 Anders Mjos      Problems/SolutionsTSG:RP1 will not start without blowing the fuseSee e-fault 6329
Tried to start the pump from another
power outlet with Edi. No luck. Pump will
  
  213   Tuesday, September 25, 2012, 13:05 Anders Mjos      Problems/SolutionsTSG:RP1 will not start without blowing the fuse

    

       
            
  
  538   Wednesday, September 07, 2016, 15:50 Aaron Schmidt      Problems/SolutionsTSG:RP1 running unevenFault report was submitted.
Anders informed Anthony on Tuesday,
Sept 6, 2016.
  
  410   Monday, November 24, 2014, 08:41 Anders Mjos      Problems/SolutionsTSG:RP1 replaced by Edi on Friday Nov 11th   
  541   Tuesday, September 13, 2016, 14:38 Anders Mjos      Problems/SolutionsTSG:RP1 replaced

    

       
            
  
  486   Monday, January 18, 2016, 08:41 Anders Mjos      Problems/SolutionsTSG:RP1 nor performingThe pump failed to pump down below 2 Torr.
on Friday 15th E-fault 8680 submitted. Vacuum
group will replace the pump today
  
  487   Monday, January 18, 2016, 15:38 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
 2016-01-18_Pumping_on_Ta46Clone_(leak_at_Lid-Base_HS).png 
  488   Tuesday, January 19, 2016, 18:34 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  489   Wednesday, January 20, 2016, 14:26 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  490   Wednesday, January 20, 2016, 19:11 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  491   Thursday, January 21, 2016, 13:04 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  493   Friday, January 22, 2016, 13:35 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  542   Wednesday, September 14, 2016, 13:58 Anders Mjos      Problems/SolutionsTSG:RP1 latched breaker

    

       
            
  
  889   Friday, July 30, 2021, 15:34 Carla Babcock      FailedTSG:RP1 failureTP1A tripped off on Fernando, seems the
backing pressure got too high. Even with
PV1 closed the RP1 pump could not get below
  
  544   Friday, September 30, 2016, 11:14 Aaron Schmidt      Problems/SolutionsTSG:RP1 ReplacementFriday, September 30, 2016, 10:01: Roughing
pump RP1 failed during roughing. Breaker
was tripped to RP1 & RP2.

Friday, September
  
  765   Monday, October 28, 2019, 09:24 Fernando Maldonado      Problems/SolutionsTSG:CG1A checked with local readerMonday, October 28, 2019, 09:22: The local
reader indicated 42 mTorr while EPICS showed
51mTorr.
  
  453   Monday, June 29, 2015, 16:51 Friedhelm Ames      Problems/SolutionsTSG:BV1B closedfound TSG:TP1B tripped off. Closed TSG:BV1B
as pressure at TSG:iG1 was rising. Pressure
is coming down again.
  
  842   Friday, January 29, 2021, 09:13 Aaron Schmidt LP-SIS  44139-1044378-2In progressTS settings ok.Friday, January 29, 2021, 09:11: CANBUS
controller was replaced. Quick systems check
ok. Sources, HV, & Optics all good.
  
  690   Monday, October 22, 2018, 07:18 Aaron Schmidt       TS restart after power outageFriday, October 19, 2018, 10:00 (Approx):
Site wide power outage. TS completely shut
down. 
  
  706   Monday, January 14, 2019, 09:47 Aaron Schmidt       TS restart after power outageMonday, January 14, 2019, 09:00: Epics
white out
Ref: Fault report  11993 (11981
  