894
|
Monday, August 23, 2021, 09:55 |
Fernando Maldonado | | | | | | | Problems/Solutions | RP1 changed back | Monday, August 23, 2021, 09:53: RP1
was swapped back to our original pump. (see e-log |
|
895
|
Monday, August 23, 2021, 10:49 |
Aaron Schmidt - Fernando Maldonado | | | | | | | Problems/Solutions | RGA replaced with a blind flange | Monday, August 23, 2021, 10:49: Aaron
removed the Extorr RGA and install a blind
instead. |
|
918
|
Monday, April 11, 2022, 14:52 |
Aaron Schmidt | | | | | | | Problems/Solutions | TP6 controller | Monday, April 11, 2022, 13:58: Controller
for TP6 is dead. Literally smokes if you
try to use it. |
|
919
|
Wednesday, April 13, 2022, 07:46 |
Aaron Schmidt | | | | | | | Problems/Solutions | Water leak | Wednesday, April 13, 2022, 07:38: Appears
to have a water leak. Vacuum @ 8.48e-06T.
All power / sources shut off. (Had already |
|
921
|
Thursday, April 21, 2022, 13:38 |
Aaron Schmidt | | | | | | | Problems/Solutions | Leak checks | https://elog.triumf.ca/TIS/Test-Stand/919
Vacuum Group LD#1
(A) Top feed through fittings upgraded |
|
937
|
Sunday, July 10, 2022, 22:19 |
Aaron Schmidt | | | | | | | Problems/Solutions | TP2 Trip / TMS:RP2 issue | Sunday, July 10, 2022, 22:19: A trip
was noted on TP2. the backing pressure is
quite high. Shutting off the turbo pumps |
|
946
|
Wednesday, November 16, 2022, 13:28 |
Aaron Schmidt | | | | | | | Problems/Solutions | TSG:TP1A Replaced | See elog 944
Wednesday, November 16, 2022, 13:23:
TP1 A replaced |
|
957
|
Tuesday, January 17, 2023, 09:48 |
Aaron Schmidt | | | | | | | Problems/Solutions | TMS:RP2 Failure | Tuesday, January 17, 2023, 09:48: TMS:RP2
off. Audible failure was in progress. Also
observable on the strip tool. Vacuum group |
|
990
|
Thursday, January 18, 2024, 10:47 |
Aaron Schmidt | | | | | | | Problems/Solutions | FC0 Solenoid Replaced. | Issues with valve operations due to a leak
in the solenoid valve above FC0. The HPA
leak did not allow for sufficient pressure |
|
994
|
Tuesday, February 06, 2024, 14:09 |
Aaron Schmidt | | | | | | | Problems/Solutions | FC0 Solenoid issue | Tuesday, February 06, 2024, 14:06: Attempted
to 'Close' FC0. While it succeeded in moving
into position, HPA rushed out of the exhaust. |
|
995
|
Friday, February 16, 2024, 05:03 |
Aaron Schmidt | | | | | | | Problems/Solutions | Coil PS issue | 15-02-2024
The coil PS control card is fried.
Roughly since the beginning of December. |
|
998
|
Monday, February 26, 2024, 10:24 |
Aaron Schmidt | | | | | | | Problems/Solutions | TMS:RP2 purge. TS exhaust clearing. + TMS:TP6 | Monday, February 26, 2024, 10:12:
While attempting to cycle FC0, noticed
that the turbo pumps TMS:TP6 & TMS:TP2 |
|
1003
|
Monday, April 15, 2024, 14:35 |
Aaron Schmidt | | | | | | | Problems/Solutions | TSH:EE Issues | Monday, April 15, 2024, 14:33: On Friday
it was noted that the EE was being troublesome.
If we put -500 V on the EE the PS would deliver |
|
1017
|
Tuesday, August 06, 2024, 15:50 |
Aaron Schmidt | | | | | | | Problems/Solutions | TS Troubleshooting - Leak/HV spark issues | Due to HV sparking & possible water
leaks on the previous TiC & Ta targets,
checks are to be performed. |
|
1019
|
Tuesday, August 13, 2024, 09:31 |
Dave Neilson | | | | | | | Problems/Solutions | Troubleshooting HV sparks and FC0 signal | Monday, August 12, 2024, 17:00 EOD.
target installed, roughed, turbos on. No
effect on vacuum from turning on water cooling |
|
1036
|
Thursday, December 05, 2024, 11:08 |
Aaron Schmidt | | | | | | | Problems/Solutions | Swap RP1 & Inspection (ITS Pumps) | Thursday, December 05, 2024, 11:04:
RP1 was struggling to pump down. RP SN: MY20055A02
removed. Tip seal replacement likely req'd. |
|
2
|
Wednesday, September 14, 2011, 15:33 |
John Wong | Test#1 | HP-SIS | ITW | TM1 | test | test | In progress | testing elog for test stand | Wednesday, September 14, 2011, 15:33
blah blah blah... |
|
3
|
Wednesday, September 14, 2011, 15:40 |
Anders Mjos | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | In progress | TaC#1 installed and pumping down. | Wednesday, September 14, 2011, 15:39: Vacuum
at 1.3e-5 torr
Thursday, September 15, 2011, 08:59: |
|
6
|
Friday, September 16, 2011, 12:39 |
Aurelia Laxdal | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | In progress | HV conditioning | Started the HV conditioning: TSG:BIAS=30kV
and TSH:EE=-700V. |
|
7
|
Monday, September 19, 2011, 09:11 |
Aurelia Laxdal | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | In progress | Started target and tube heaters. | Heaters conditioning went fine: 580A and
230A.
Did a mass scan: |
|