  Test-Stand, Page 15 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O#down Status Subject Text Attachments
  29   Friday, January 20, 2012, 10:37 Friedhelm Ames       vacuum pumps shut offturbo pumps shut off due to work on
cooling water system
  
  30   Tuesday, January 24, 2012, 09:44 Friedhelm Ames       turbo pumps restartedAll turbo pumps have been restarted after
cooling water is back and running.
 
  
  31   Wednesday, February 08, 2012, 17:39 Friedhelm Ames      FailedTSG:TP1B failureBoth turbo pumps at the source box were
found off. TSG:TP1A has been started normally.
TSG:TP1B does not spin up above 3KRPM even
  
  32   Wednesday, February 08, 2012, 18:16 Friedhelm Ames      FailedTSG:TP1B and TSG:TP1A failure


   
        
            
  
  33   Thursday, February 16, 2012, 15:59 Anders Mjos      Problems/SolutionsHe and Ne installed and gas lines leak checkedNew supply of He and Ne was installed yesterday
and gas lines leak checked. The He bottle
is currently closed.
  
  34   Friday, February 17, 2012, 10:27 Aurelia Laxdal      DoneStarted the ArchiversStarted both ISACT and SOURCES Archivers.   
  35   Monday, February 27, 2012, 17:39 Friedhelm Ames      In progresstarget and tube heaters ramped upramping up target to 300 A and tube to
270 A
  
  36   Tuesday, February 28, 2012, 10:29 Pierre Bricault LP-FEBIAD    In progressTest FEBIAD at ISAC test statnd    
  37   Tuesday, February 28, 2012, 11:04 Pierre Bricault         Calibrating the gas valve   
  40   Tuesday, February 28, 2012, 16:32 Brandon Humphries       Initial settings for FEBIAD on Test StandISAC Test Stand FEBIAD Ion Source and ISACT
optics screen grabs before practicing tuning. 
Tune saved as: data/febiaddata/tune/120228-1620_0.snap
 grab.V13332.pnggrab.m13336.png 
  41   Wednesday, February 29, 2012, 09:43 Friedhelm Ames       checking gas inlet valve for FEBIAD    
  42   Wednesday, February 29, 2012, 15:08 Friedhelm Ames       connected Al(CH3)3connected A(CH3)3 instead of He, pumped
line and valve with pump on the high voltage
rack.. Opened regulating valve first response
  
  43   Wednesday, February 29, 2012, 17:22 Friedhelm Ames       mass scan mass scan with valve at 7.2 to let in Al(CH3)3
saved as
plotdump-local-clean.txt_Feb29_12_17-19-20.txt


 grab.BI5978.png 
  44   Wednesday, February 29, 2012, 17:26 Friedhelm Ames       gas inlet valves closed    
  45   Thursday, March 01, 2012, 17:04 Friedhelm Ames       new mass scanbigger mass scan after separator optimization
and with finer step size
 
 grab.S19441.png 
  46   Thursday, March 01, 2012, 17:05 Friedhelm Ames       start heater ramping down    
  47   Thursday, March 01, 2012, 17:09 Friedhelm Ames       new mass scan


   
        
            
  
  48   Thursday, March 01, 2012, 17:10 Friedhelm Ames       start ramping down of heaters    
  49   Friday, March 02, 2012, 08:53 Anders MjosFEBIAD test     Problems/SolutionsTube heater insulator glowing   The insulator for the tube
heater was observed to be glowing with a
blue shine when the target was on high voltage.
 glowing_insulator.jpg 
  50   Friday, March 02, 2012, 13:28 Anders MjosFEBIAD test      Venting test standVenting for target exchange   
ELOG V2.9.2-2455