29
|
Friday, January 20, 2012, 10:37 |
Friedhelm Ames | | | | | | | | vacuum pumps shut off | turbo pumps shut off due to work on
cooling water system |
|
30
|
Tuesday, January 24, 2012, 09:44 |
Friedhelm Ames | | | | | | | | turbo pumps restarted | All turbo pumps have been restarted after
cooling water is back and running.
|
|
31
|
Wednesday, February 08, 2012, 17:39 |
Friedhelm Ames | | | | | | | Failed | TSG:TP1B failure | Both turbo pumps at the source box were
found off. TSG:TP1A has been started normally.
TSG:TP1B does not spin up above 3KRPM even |
|
32
|
Wednesday, February 08, 2012, 18:16 |
Friedhelm Ames | | | | | | | Failed | TSG:TP1B and TSG:TP1A failure |
|
|
33
|
Thursday, February 16, 2012, 15:59 |
Anders Mjos | | | | | | | Problems/Solutions | He and Ne installed and gas lines leak checked | New supply of He and Ne was installed yesterday
and gas lines leak checked. The He bottle
is currently closed. |
|
34
|
Friday, February 17, 2012, 10:27 |
Aurelia Laxdal | | | | | | | Done | Started the Archivers | Started both ISACT and SOURCES Archivers. |
|
35
|
Monday, February 27, 2012, 17:39 |
Friedhelm Ames | | | | | | | In progress | target and tube heaters ramped up | ramping up target to 300 A and tube to
270 A |
|
36
|
Tuesday, February 28, 2012, 10:29 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Test FEBIAD at ISAC test statnd | |
|
37
|
Tuesday, February 28, 2012, 11:04 |
Pierre Bricault | | | | | | | | | Calibrating the gas valve |
|
40
|
Tuesday, February 28, 2012, 16:32 |
Brandon Humphries | | | | | | | | Initial settings for FEBIAD on Test Stand | ISAC Test Stand FEBIAD Ion Source and ISACT
optics screen grabs before practicing tuning.
Tune saved as: data/febiaddata/tune/120228-1620_0.snap |
 |
41
|
Wednesday, February 29, 2012, 09:43 |
Friedhelm Ames | | | | | | | | checking gas inlet valve for FEBIAD | |
|
42
|
Wednesday, February 29, 2012, 15:08 |
Friedhelm Ames | | | | | | | | connected Al(CH3)3 | connected A(CH3)3 instead of He, pumped
line and valve with pump on the high voltage
rack.. Opened regulating valve first response |
|
43
|
Wednesday, February 29, 2012, 17:22 |
Friedhelm Ames | | | | | | | | mass scan | mass scan with valve at 7.2 to let in Al(CH3)3
saved as
plotdump-local-clean.txt_Feb29_12_17-19-20.txt
|
|
44
|
Wednesday, February 29, 2012, 17:26 |
Friedhelm Ames | | | | | | | | gas inlet valves closed | |
|
45
|
Thursday, March 01, 2012, 17:04 |
Friedhelm Ames | | | | | | | | new mass scan | bigger mass scan after separator optimization
and with finer step size
|
|
46
|
Thursday, March 01, 2012, 17:05 |
Friedhelm Ames | | | | | | | | start heater ramping down | |
|
47
|
Thursday, March 01, 2012, 17:09 |
Friedhelm Ames | | | | | | | | new mass scan |
|
|
48
|
Thursday, March 01, 2012, 17:10 |
Friedhelm Ames | | | | | | | | start ramping down of heaters | |
|
49
|
Friday, March 02, 2012, 08:53 |
Anders Mjos | FEBIAD test | | | | | | Problems/Solutions | Tube heater insulator glowing | The insulator for the tube
heater was observed to be glowing with a
blue shine when the target was on high voltage. |
|
50
|
Friday, March 02, 2012, 13:28 |
Anders Mjos | FEBIAD test | | | | | | | Venting test stand | Venting for target exchange |
|