Entry  Monday, August 23, 2021, 09:55, Fernando Maldonado, , , , , , , Problems/Solutions, RP1 changed back 

 Monday, August 23, 2021, 09:53: RP1 was swapped back to our original pump. (see e-log 889)

Derek informed that they test it overnight and performed well, and it's a bit slow but it goes down to 20 mT.

Current is at 36 mTorr and dropping.

Entry  Monday, August 23, 2021, 10:49, Aaron Schmidt - Fernando Maldonado, , , , , , , Problems/Solutions, RGA replaced with a blind flange 

Monday, August 23, 2021, 10:49: Aaron removed the Extorr RGA and install a blind instead.

When the new RGA arrives it will be changed.

Entry  Monday, April 11, 2022, 14:52, Aaron Schmidt, , , , , , , Problems/Solutions, TP6 controller  

Monday, April 11, 2022, 13:58: Controller for TP6 is dead. Literally smokes if you try to use it.

Monday, April 11, 2022, 14:51: TP6 Controller is replaced. TP6 on.

Entry  Wednesday, April 13, 2022, 07:46, Aaron Schmidt, , , , , , , Problems/Solutions, Water leak 

Wednesday, April 13, 2022, 07:38: Appears to have a water leak. Vacuum @ 8.48e-06T. All power / sources shut off. (Had already tripped).

Wednesday, April 13, 2022, 07:44: All waterlines closed. Water leak confirmed. Vacuum dropped to 2.33e-06T.

Wednesday, April 13, 2022, 08:23: Vacuum @ 2.06e-06T.

Wednesday, April 13, 2022, 08:28: Open FS#2. Vacuum @ 2.06e-06T.

Wednesday, April 13, 2022, 08:34: Vacuum @ 2.06e-06T. Open FS#3. Vacuum @ 2.06e-06T.

Wednesday, April 13, 2022, 08:39:. Open FS#4. immediate spike to 2.57e-06T.

Wednesday, April 13, 2022, 08:44: All lines closed & purged.

Wednesday, April 13, 2022, 08:47: Opened FS#4 w/ added air pressure (40 PSI). Immediate spike noticed.

Wednesday, April 13, 2022, 08:50: FS#5 Pressurized. No change. Leak appears on FS#4.

Wednesday, April 13, 2022, 08:51: IG1 & Turbo pumps off.

 

Entry  Thursday, April 21, 2022, 13:38, Aaron Schmidt, , , , , , , Problems/Solutions, Leak checks 

https://elog.triumf.ca/TIS/Test-Stand/919

Vacuum Group LD#1

(A) Top feed through fittings upgraded

Thursday, April 21, 2022, 13:11: Pumping directly on FS#4-Line A (TBHT). Leak rate @ 0.0E-07 atm-cc/sec.

Thursday, April 21, 2022, 13:13: Sprayed He on Block (A) & the TBHT solder joints. No signal change.

(B) Top feed through fittings upgraded.

Thursday, April 21, 2022, 13:39: Pumping directly on FS#4-Line B (TBHT). Leak rate @ 0.0E-07 atm-cc/sec.

Thursday, April 21, 2022, 13:42: Sprayed He on Block (A) & the TBHT solder joints. Dips up to a Leak rate @ 0.1E-07 atm-cc/sec & back to 0.0.

Disconnect LD. Will need to pressurize w/ He.

Thursday, April 21, 2022, 14:09: Pressurize FS#4-Line B (TBHT) to 50 PSI.

Thursday, April 21, 2022, 14:20: False positives. Saturated the area w/ He. LD off & lines depressurized.


Tuesday, April 26, 2022, 11:14: Leak rate @ 0.0E-07 atm-cc/sec. (No He)

Tuesday, April 26, 2022, 11:15: Pressurize FS#4-Line B (TBHT) to 120 PSI.

Tuesday, April 26, 2022, 11:20: Checked TBHT solder joints & water block (B). Leak rate @ 0.0E-07 atm-cc/sec. Disconnect, purge, & swap fittings to (A)

Tuesday, April 26, 2022, 11:31: Pressurize FS#4-Line A (TBHT) to 120 PSI. Leak rate @ 0.0E-07 atm-cc/sec

Tuesday, April 26, 2022, 11:38: Checked TBHT solder joints & water block (A). Leak rate @ 0.4E-07 atm-cc/sec on the water block.  Disconnect, purge.


Wednesday, April 27, 2022, 10:38: Indium gasket installed on FS#4-Line A water block.

Wednesday, April 27, 2022, 10:43: Leak rate @ 0.0E-07 atm-cc/sec. (No He)

Wednesday, April 27, 2022, 10:44: Spiked as soon as He was applied.

Wednesday, April 27, 2022, 11:14: Line A removed.

Wednesday, April 27, 2022, 11:40: Line A reinstalled after inspection w/ new Indium gasket fitted. Gasket only. No C-Seal.

Wednesday, April 27, 2022, 11:44: Leak rate @ 0.0E-07 atm-cc/sec. (No He)

Wednesday, April 27, 2022, 11:46: Spiked as soon as He was applied.

Wednesday, April 27, 2022, 11:53: New Indium gasket fitted. Gasket only. No C-Seal.

Leak rate @ 0.0E-07 atm-cc/sec. (No He)

Wednesday, April 27, 2022, 11:54: Pressurize to 30 PSI. Leak rate @ 0.0E-07 atm-cc/sec

Wednesday, April 27, 2022, 11:57: Pressurize to 50 PSI. Leak rate gradually increased to the (X)E-05 atm-cc/sec range.


Multiple leak checks & gasket attempts Thursday.


Monday, May 02, 2022, 09:45: Indium gasket installed w/ 90-100 inch pounds of torque. Used a heat gun up to 90. Allowed to cool, then given one more tightening.

Monday, May 02, 2022, 09:57: Leak rate @ 0.0E-08 atm-cc/sec. (No He) using the sniffer.

Monday, May 02, 2022, 09:59: Initial leak rate @ 0.0E-08 atm-cc/sec. (w/ 120 PSI He)

Monday, May 02, 2022, 10:11: Leak rate @ 0.0E-08 atm-cc/sec. (w/ 120 PSI He).

Monday, May 02, 2022, 10:20: BV1B open. Rouging

Monday, May 02, 2022, 10:22: BV1A open.

Monday, May 02, 2022, 11:51: TP1B on.

Monday, May 02, 2022, 11:57: TP1A on.

Monday, May 02, 2022, 12:05: IG1 on.

Monday, May 02, 2022, 12:10: Vacuum @ 4.19e-05T & dropping.

Monday, May 02, 2022, 13:59: Vacuum @ 1.33e-05T

Monday, May 02, 2022, 14:04: FS#4 open. Vacuum @ 1.33e-05T. Stable. No immediate Spike.

Monday, May 02, 2022, 14:05: FS#2 open. Vacuum @ 1.33e-05T.

Monday, May 02, 2022, 14:06: FS#3 open. Vacuum @ 1.33e-05T.

Monday, May 02, 2022, 14:09: FS#5 open. Vacuum @ 1.33e-05T. Stable.

 

Entry  Sunday, July 10, 2022, 22:19, Aaron Schmidt, , , , , , , Problems/Solutions, TP2 Trip / TMS:RP2 issue 

 Sunday, July 10, 2022, 22:19: A trip was noted on TP2. the backing pressure is quite high. Shutting off the turbo pumps for the beamline side.


Monday, July 11, 2022, 06:01: Venting.

Monday, July 11, 2022, 08:12: RP1 off.

Monday, July 11, 2022, 09:01: RP changed. SN#LPA49885

Monday, July 11, 2022, 09:02: Down to 0.032T Fast. TP2 & TP6 on.

Monday, July 11, 2022, 09:08: Pumps up to speed. IG6 on.

Entry  Wednesday, November 16, 2022, 13:28, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:TP1A Replaced 

 See elog 944

Wednesday, November 16, 2022, 13:23: TP1 A replaced

Wednesday, November 16, 2022, 13:25: Roughing.

Wednesday, November 16, 2022, 14:53: TP1B on

Wednesday, November 16, 2022, 14:56: TP1B at speed.

Wednesday, November 16, 2022, 14:58: TP1A on.

Wednesday, November 16, 2022, 15:07: TP1A at speed. IG1 on. Vacuum @ 3.32e-05T

 

 

Entry  Tuesday, January 17, 2023, 09:48, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:RP2 Failure 

Tuesday, January 17, 2023, 09:48: TMS:RP2 off. Audible failure was in progress. Also observable on the strip tool. Vacuum group contacted.

Entry  Thursday, January 18, 2024, 10:47, Aaron Schmidt, , , , , , , Problems/Solutions, FC0 Solenoid Replaced. 

Issues with valve operations due to a leak in the solenoid valve above FC0. The HPA leak did not allow for sufficient pressure to remain in the lines to operate. The solenoid as changed this morning.

Thursday, January 18, 2024, 10:32: Roughing. Valves can be cycled. FC0 cycled. OK.

Thursday, January 18, 2024, 10:40: TMS TP6 & TMS:TP2 on.

Thursday, January 18, 2024, 10:45: IG6 on.

 

Entry  Tuesday, February 06, 2024, 14:09, Aaron Schmidt, , , , , , , Problems/Solutions, FC0 Solenoid issue 

Tuesday, February 06, 2024, 14:06: Attempted to 'Close' FC0. While it succeeded in moving into position, HPA rushed out of the exhaust. This solenoid was replaced recently on January 18th. Requires replacement. (ordered)

Reference: https://elog.triumf.ca/TIS/Test-Stand/990

Stores PN: 01-7/01026

Valve, Solenoid, 24 Volt 5 Port

Entry  Friday, February 16, 2024, 05:03, Aaron Schmidt, , , , , , , Problems/Solutions, Coil PS issue Coil_PS_Control_Card.png

15-02-2024

The coil PS control card is fried. Roughly since the beginning of December. The PS was removed.

See attached image.


New PS was installed on Friday.

Tuesday, February 20, 2024, 08:01: Check Coil  not responding.

Tuesday, February 20, 2024, 09:48: System check 2: TGHT / TBHT manually to 5 / 5 A. BIAS / EE / EZL to 1 / -0.5 / 1 kV. Anode to 50 V.

Coil set to 15 A, did not adjust.

Tuesday, February 20, 2024, 12:04: Coil PS SW1-7 switch in was in an "Off" position & wouldn't allow the voltage signal through to the PS. Switched to "on". Coil tapped to 7 A manually & back to 0 A ok.

Fixed*

 

Entry  Monday, February 26, 2024, 10:24, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:RP2 purge. TS exhaust clearing. + TMS:TP6 

Monday, February 26, 2024, 10:12:

While attempting to cycle FC0, noticed that the turbo pumps TMS:TP6 & TMS:TP2 were off, with TP2 being tripped off. The vacuum on TMS:CG2A sat around 0.825T although RP2 was running. The ballast plug has since been removed to allow for a 2 hour purge of the roughing pump.


Thursday, February 29, 2024, 13:10: Backing pressure still had not stabilized. RP2 removed & taken to Vacuum Group.


Wednesday, March 06, 2024, 10:28:

Tip seals were replaced by Vacuum Group. Roughing.

Wednesday, March 06, 2024, 10:31: TMS:TP6 & TMS:TP2 on.

Wednesday, March 06, 2024, 10:49: TP6 has tripped twice. TP2 ok.

Wednesday, March 06, 2024, 12:25: Venting. TP6 is not operating above 3 krpm.

Vacuum Group acquired TP6. It was nearly seized.

Wednesday, March 06, 2024, 14:57: Varian 551 pump installed from the furnace behind the TS. Roughing.


Friday, March 08, 2024, 06:58: Soft start initiated.

Friday, March 08, 2024, 08:47: TP6 at speed.

Entry  Monday, April 15, 2024, 14:35, Aaron Schmidt, , , , , , , Problems/Solutions, TSH:EE Issues 

Monday, April 15, 2024, 14:33: On Friday it was noted that the EE was being troublesome. If we put -500 V on the EE the PS would deliver -1000 V. However it would slowly trickle downward. elog:1002.

Tom H. had a look at it this afternoon & determined the PS is operating, however the signal going to it is peculiar. Controls group as been notified as well. Awaiting further response.


Tuesday, April 16, 2024, 16:09: Full epics & PLC restart needed. All TP & RP shut down.

Tuesday, April 16, 2024, 17:45: Restart RP. TP1B on. TP6 & TP2 on.

Tuesday, April 16, 2024, 17:49: TP1A on.

Tuesday, April 16, 2024, 17:55: Restarted TP6.

Tuesday, April 16, 2024, 18:05: Long sigh* TP6 was in soft start mode. Controller put back to regular start. TP6 started.

Tuesday, April 16, 2024, 18:08: IG1 & IG6 on.


Wednesday, April 17, 2024, 10:25: IG, TP, & RP, off.

Wednesday, April 17, 2024, 13:03: RP on.

Wednesday, April 17, 2024, 13:14: TP1A on.

Wednesday, April 17, 2024, 13:07: TP6, TP2, & TP1B on.

Wednesday, April 17, 2024, 13:23: IG6 & IG1 on.

Wednesday, April 17, 2024, 13:25: EE to -500V. Read back on Epics -500V. PS direct @ -500V

Wednesday, April 17, 2024, 13:26: EE to -1500V. Read back on Epics -1500V. PS direct @ -1500V

Wednesday, April 17, 2024, 14:07: EE was brought back to 0V. ISAC TS closed up & ready for operation.

 

Entry  Tuesday, August 06, 2024, 15:50, Aaron Schmidt, , , , , , , Problems/Solutions, TS Troubleshooting - Leak/HV spark issues 

Due to HV sparking & possible water leaks on the previous TiC & Ta targets, checks are to be performed.

Chamber is empty. U-Line installed. All waterlines purged. FS#2, 3, 4, & 5 are closed.

Vacuum Group LD #2 - Connected to TP1B backing line

Tuesday, August 06, 2024, 15:50: Vacuum @ 3.38e-06T.

Tuesday, August 06, 2024, 15:52: No He connected. 7.0 E-09 atm-cc. LD TP pressure 1.0e-03T.

Tuesday, August 06, 2024, 16:20: No He connected. 1.1 E-08 atm-cc. LD TP pressure 1.0e-03T.

Tuesday, August 06, 2024, 16:23: Open to chamber. 1.6 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.97e-06T.

Tuesday, August 06, 2024, 16:26: 20 PSI. 1.6 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.97e-06T.

Tuesday, August 06, 2024, 16:32: FS#5 Charged with 20 PSI He. 1.6 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.75e-06T.

Tuesday, August 06, 2024, 16:34: Close FS#5

Tuesday, August 06, 2024, 16:35: FS#4 Charged with 20 PSI He. Increase to 2.5 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.75e-06T.

Tuesday, August 06, 2024, 16:42: While purging FS#4 with HPA, an increase of 8.3 E-08 atm-cc was observed. Vacuum @ 2.75e-06T.

Tuesday, August 06, 2024, 16:50: Re-connected He. FS#3 Charged with 20 PSI He. Increase to from 3.6 to 9.0 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.59e-06T.

Tuesday, August 06, 2024, 16:52: 5.1 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.57e-06T. Line still @ 20 PSI.

Tuesday, August 06, 2024, 16:53: Release pressure on FS#3. 5.1 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.57e-06T. Line still @ 20 PSI.

Tuesday, August 06, 2024, 16:55: FS#2 Charged with 20 PSI He. Steady @ 5.1 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.59e-06T.

Observed increases on FS#3 & FS4.

Tuesday, August 06, 2024, 17:02: All lines purged with HPA. Allow vacuum to continue down.

Tuesday, August 06, 2024, 17:03: Close off LD to TP1B valve. Dropped to 1.7 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.48e-06T. Safe to vent LD.

Tuesday, August 06, 2024, 17:06: LD vented & disconnected.


Wednesday, August 07, 2024, 09:15: Vacuum @ 6.43e-07T. Gradually refill the waterlines. 

Wednesday, August 07, 2024, 09:20: FS#5 open. Vacuum remains steady.

Wednesday, August 07, 2024, 09:28: FS#2 open. Vacuum @ 6.38e-07T.

Wednesday, August 07, 2024, 09:30: FS#4 open. Vacuum @ 6.38e-07T. Wait 5 min.

Wednesday, August 07, 2024, 09:35: Vacuum steady @ 6.36e-07T. Occasional dip to 6.27e-07T.

Wednesday, August 07, 2024, 09:36: FS#3 open. Vacuum steady. Wait 5 min.

Wednesday, August 07, 2024, 09:41: No change to vacuum.

While the helium did get through on yesterdays tests as a minor molecular leak, the water does not appear to have an affect. Moving to an empty HV test.

Wednesday, August 07, 2024, 09:53: Vacuum 6.20e-07T.

Wednesday, August 07, 2024, 10:43: Vacuum 6.20e-07T. IG1 & TP off.   -   venting test stand for target installation

 

Wednesday, August 07, 2024, end of day.  mass marker target installed in test stand with side foil removed so the target is visible through the view port. vacuum roughed, then turbo pumps turned on at end of day for overnight pumping

Thursday, August 08, 2024, 09:19 - vacuum at 6.27e-7T. water cooling was switched on. no effect on vacuum. TGHT and TBHT began ramping at 1A/30s. will test high voltage at low heat and at high heat.

 Thursday, August 08, 2024, 10:04   HV at 35kV. No sparks.  TGHT TBHT at <80A throughout HV ramp and plateau

Thursday, August 08, 2024, 10:14    BIAS down.  TGHT TBHT at 100A. increasing ramp rate to 1.7A/10s. heating up to 480/230

 Thursday, August 08, 2024, 13:59  BIAS has slowly been brought to 28kV . no sparks at all, despite being over 24kV for ~50min. 

Thursday, August 08, 2024, 14:00 increasing TGHT to 580A to attempt to induce sparks. 

Thursday, August 08, 2024, 14:42   at TGHT TBHT 580 230, HV bias at 28kV (with EZL and EE at 0 and 0), no sparks at all over the ramp and over 10 minutes at this condition. 

Thursday, August 08, 2024, 14:43 ramping HV to 30kV

Thursday, August 08, 2024, 15:01  - -  no sparks at 30kV.   bringing up EZL to 13kV  (EE=0)

Thursday, August 08, 2024, 15:11   -  no sparks with EZL at 13kV.  bringing up EE to -2500V

Thursday, August 08, 2024, 15:13  - no sparks with EE at -2500kV

 Thursday, August 08, 2024, 15:22   turned on beam optics to observe beam out, but no beam currently detected on FC0, nor on the wire scanners, nor on FC6. This target commonly has a normal beam output of primarily Na and K

Thursday, August 08, 2024, 15:50  have not been able to deduce reason for lack of beam. increasing BIAS to 50kV.

Thursday, August 08, 2024, 15:51  during ramp up, at 38kV, many optics elements tripped and switched off. however, no spark was registered at the strip tool. not sure of the cause for this.

Thursday, August 08, 2024, 15:54  at 38.8kV, a small spark, only registered on BIAS:RDCUR  (no voltage drop), tripped off beam elements prior to FC0 again.

Thursday, August 08, 2024, 16:00 BIAS at 40kV. no sparks apart from those mentioned immediately above. still have not registered any beam on FC0.

 Thursday, August 08, 2024, 16:02 Vacuum pressure has raised from 6.5e-7 to 1.3e-6 T.

Thursday, August 08, 2024, 16:03  just now, there was a spike drop in pressure and optics elements have shut down again. nothing registered on BIAS, EZL, or EE.

 

 

Thursday, August 08, 2024, 16:11   a spark occurred at 43.3 kV

 

 Thursday, August 08, 2024, 16:23  this spark was audible at the test stand --- ie, not inside

 

 

 Thursday, August 08, 2024, 16:51  Saw no indication overall of the same HV sparking issues that we saw with the previous two targets. However, we were unable to generate beam  register any beam output on FC0, FC6, or wire scanners.  And we don't mean 'low signal'. Actually nothing at all.

 

Thursday, August 08, 2024, 16:54   Ramping down TGHT TBHT now

Friday, August 09, 2024, 08:05   turbo pumps off and spinning down in preparation to vent. will remove the inner foil from the target to observe if a change in shine from the target induces sparking as before. 

Friday, August 09, 2024, 08:58   turbo pumps no longer spinning. venting now.

Friday, August 09, 2024, 10:26    foil stripped off the target. there was a hole in the source for gas (febiad/mass marker). This hole is now plugged. reinstalled, roughing.

Friday, August 09, 2024, 11:59   vacuum at 1.2e-5T.  turning on water cooling lines.  no effect on vacuum.

Friday, August 09, 2024, 12:50 heating TGHT TBHT at 1A/30s

Friday, August 09, 2024, 13:47 increasing heating rate to 1.7A/10s, up to 580/230A

Friday, August 09, 2024, 14:42  TGHT TBHT at 550 230,  increasing BIAS to 30kV 

Friday, August 09, 2024, 15:03   BIAS at 30kV.  no sparks other than a single small one at 25kV. No beam detected at FC0, FC6, or wire scanners.

 Friday, August 09, 2024, 15:18 increased BIAS again. there was one spark at 35kV, then it was stable for 8 minutes with no sparks. still no signal on FC0.  This lack of signal is highly irregular, and should not be the case despite being an empty target. Will have to compare to the next target in the test stand. To attempt to correct, we have:

- manually adjusted gain

- reset bias

- flipped polarity back and forth

- confirmed FC in position

- confirmed no flagged power supply issue

- confirmed clear beam line to FC0

- confirmed upsteam optics are tuned appropriately

 

Friday, August 09, 2024, 15:23  cooling target and ramping down HV

 Friday, August 09, 2024, 16:06 TGHT TBHT at 0. turbo pumps off and spinning down.

 

 

Entry  Tuesday, August 13, 2024, 09:31, Dave Neilson, , , , , , , Problems/Solutions, Troubleshooting HV sparks and FC0 signal temp_8-13.PNG

Monday, August 12, 2024, 17:00   EOD. target installed, roughed, turbos on. No effect on vacuum from turning on water cooling lines. TGHT TBHT slowly brought to 230A/230A overnight. 

Tuesday, August 13, 2024, 09:28.  Vacuum at 9.9e-7T.  TGHT TBHT at 210/210. accelerating heating to 230/230. bringing up HV EZL EE to 30 / 2.5 / 13   kV

Tuesday, August 13, 2024, 09:51.  with EZL 13kV, EE 2.5kV. When increasing BIAS from 17.0 to 17.5kV.  Signal becomes detectable on FC0, at 7.75e-10A

Tuesday, August 13, 2024, 10:13  at BIAS 30kV. FC0 and wire scanners appear to be working correctly. FC0 reading 2.66e-8A 

Tuesday, August 13, 2024, 10:13  turning on all beam optics for FC6 mass scan.

 Tuesday, August 13, 2024, 10:31   mass scan procedure is doing a very poor job of recording the background noise. filename  2024-08-13_10-44 Ksalt mm 230-230

Tuesday, August 13, 2024, 10:46   increasing tght to 330

Tuesday, August 13, 2024, 10:59    FC0 at 2.1e-8A

Tuesday, August 13, 2024, 11:12  running mass scan at TGHT TBHT = 330/230 A.   filename 2024-08-13_11-21 Ksalt mm 330-230

Tuesday, August 13, 2024, 11:23 increasing TGHT to 430

Tuesday, August 13, 2024, 11:29  three sparks within 2 min at TGHT 378A.  (no sparks at all previous to this). TGHT ramp aborted. 

Tuesday, August 13, 2024, 11:36  resuming TGHT increase after 6 minutes of no sparks.  

Tuesday, August 13, 2024, 11:51  FC0 reading 1.6e-8.  FC0 signal fluctuating throughout test. rises during ramp and drops during static TGHT TBHT level.

Tuesday, August 13, 2024, 11:53  running mass scan at TGHT TBHT 430/230 A .  filename 2024-08-13_12-16 Ksalt mm 430-230 

Tuesday, August 13, 2024, 12:17  increasing TGHT to 530A.  

Tuesday, August 13, 2024, 12:31  FC0 at 3.03e-8 A

Tuesday, August 13, 2024, 12:31  beginning mass scan   -  filename   2024-08-13_13-02 Ksalt mm 530-230

Tuesday, August 13, 2024, 13:02 increasing TGHT to 580A 

Tuesday, August 13, 2024, 13:13   FC0 at 3.58e-8A.  beginning mass scan - filename  2024-08-13_13-35 Ksalt mm 580-230

Tuesday, August 13, 2024, 13:37    increasing bias to test sparking

Tuesday, August 13, 2024, 13:58   at 37kV, a number of optics elements prior to FC0 went down. no voltage or current spikes

Tuesday, August 13, 2024, 13:59  at 42.4kV, a couple sparks, seem to involve TGHT and BIAS. these dropped a few optics elements. when I brought them back up, they went down again, at a time with no voltage or current spikes.

Tuesday, August 13, 2024, 14:30 at 43.6kV, the sparking frequency became regular, with HV bias sparks occurring approximately every 5 minutes

Tuesday, August 13, 2024, 17:00 considerable time was spent until end of day manipulating the bias and the TGHT current level in an effort to discover the location of the regular sparking

increases in HV were found to increase the frequency of sparking, and eventually the HV increase was found to hit a threshold where the current would increase noticeably, with a stable voltage. this was accompanied by a buzzing coming from the feedthroughs on top of the cage. seemed to be coming from the TGHT(+) feedthrough. At no time did there appear to be sparking within the chamber of the test stand. In one instance, with HV just below the threshold of buzzing, increasing TGHT seemed to induce the buzzing state.

 

Wednesday, August 14, 2024, 11:16  ramping up bias to HV. intending to push HV today to find the source of these sparks and buzzing. initially, will be observing this with TGHT TBHT at 180/180 A

Wednesday, August 14, 2024, 11:47 at BIAS = 32.6kV (with EE 2.5 kV and EZL 13 kV), HV appears to be stable. Yesterday, we observed a fluctuating BIAS current which seemed to culminate in regular sparking activity (although this was at voltages of >40kV)

 Wednesday, August 14, 2024, 12:26 at bias = 38.8kV, there was a significant accompanying increase in BIAS current, but no evidence of sparking or buzzing

 Wednesday, August 14, 2024, 12:46  at BIAS = 49.2kV, the buzzing begins.  On the strip tool this is also seen as a large jump in current, with stable voltage

Wednesday, August 14, 2024, 12:49  dropping the bias by ~1kV stopped the buzzing. ramping up quickly again caused a spark and more buzzing.  increasing the voltage to attempt to locate the source.

 

 

Wednesday, August 14, 2024, 13:18   at bias of 49.2kV, buzzing began. dropping the bias stopped it. to attempt to locate the source, we increased the bias significantly. At 53kV, the bias power supply began to current limit. when this was increased, a spark caused the putty connection at the test stand to disconnect and two turbo pumps to trip off. once restored, another increase of the bias eventually caused a large spark when trying to locate the buzzing sound. Again, it seems to be at the feedthroughs of TGHT TBHT. My guess is TGHT+, but there is nothing visual to confirm it is coming from there. This buzzing state is also accompanied by a drop in EZL current to 0 and a large increase in EZL voltage readback.

 Wednesday, August 14, 2024, 15:05 dropped the HV and removed the cage to investigate any issues. we propose that this likely involves jumping to the einzel lens and are curious if raising the EZL voltage significantly would prevent this state from recurring. cage back on, raising HV

 

Resuming testing after TGHT TBHT power supply updates:

 

Friday, September 06, 2024, 12:09:   Ramped up TGHT and TBHT to ~170A at 1A/30s.  Increasing ramp rate to 1.7A/10s up to 580A/230A

 Friday, September 06, 2024, 14:11  slowly increasing BIAS, EE and EZL to 30kV, 2.5kV, 13kV

Friday, September 06, 2024, 15:53  appears that FC0 and wire scanners are working normally. However, there is a threshold reading problem with FC6. seems that a negative readout is present on FC6 if there is no substantial signal, and then nothing is recorded to the mass scans.

Friday, September 06, 2024, 15:54  increasing voltage to test high voltage sparking (BIAS AND EZL)

Friday, September 06, 2024, 16:23  after resetting the FC6 polarity and the FC6 bias, the background signal began showing up.

Tuesday, September 10, 2024, 12:19  Test stand vented, target removed.

Entry  Thursday, December 05, 2024, 11:08, Aaron Schmidt, , , , , , , Problems/Solutions, Swap RP1 & Inspection (ITS Pumps) Media.jpgMedia_(2).jpgMedia_(1).jpgMedia_(3).jpgMedia_(4).jpg

 Thursday, December 05, 2024, 11:04: RP1 was struggling to pump down. RP SN: MY20055A02 removed. Tip seal replacement likely req'd.

Swapped with a new roughing pump SN: MY2340SA06 (Voltage set to 115V. Shipping locks loosened prior to install)

Ballast filter installed.

Thursday, December 05, 2024, 11:05: Roughing.

Thursday, December 05, 2024, 11:10: Vacuum pressure dropping optimally. Down below 1T already

Thursday, December 05, 2024, 11:47: TP & other RP ok. Note TP1A is getting louder on startup. Will likely need a change out in Q1 - 2025.


Additional source tray inspection:

Monday, December 16, 2024, 15:30: OK

Images attached.

Entry  Wednesday, September 14, 2011, 15:33, John Wong, Test#1, HP-SIS, ITW, TM1, test, test, In progress, testing elog for test stand 

Wednesday, September 14, 2011, 15:33

blah blah blah...

Entry  Wednesday, September 14, 2011, 15:40, Anders Mjos, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, In progress, TaC#1 installed and pumping down. 

Wednesday, September 14, 2011, 15:39: Vacuum at 1.3e-5 torr 

Thursday, September 15, 2011, 08:59: Vacuum at 2.9e-7 torr. Water flowing and vacuum stable. 

Entry  Friday, September 16, 2011, 12:39, Aurelia Laxdal, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, In progress, HV conditioning 

Started the HV conditioning: TSG:BIAS=30kV and TSH:EE=-700V.

Entry  Monday, September 19, 2011, 09:11, Aurelia Laxdal, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, In progress, Started target and tube heaters.  

Heaters conditioning went fine: 580A and 230A.

Did a mass scan:

Plotdump-local-clean.txt Sept19 11 12-45-22.txt

Set for Li-7 for over the night on TMS:FC6.