Entry  Monday, August 23, 2021, 09:55, Fernando Maldonado, , , , , , , Problems/Solutions, RP1 changed back 
 Monday, August 23, 2021, 09:53: RP1 was swapped back to our original pump. (see e-log
889)
Derek informed that they test it overnight and performed well, and it's a bit slow but it goes down to 20 mT.
Entry  Monday, August 23, 2021, 10:49, Aaron Schmidt - Fernando Maldonado, , , , , , , Problems/Solutions, RGA replaced with a blind flange 
Monday, August 23, 2021, 10:49: Aaron removed the Extorr RGA and install a blind instead.
When the new RGA arrives it will be changed.
Entry  Monday, April 11, 2022, 14:52, Aaron Schmidt, , , , , , , Problems/Solutions, TP6 controller  
Monday, April 11, 2022, 13:58: Controller for TP6 is dead. Literally smokes if you try to use it.
Monday, April 11, 2022, 14:51: TP6 Controller is replaced. TP6 on. 
Entry  Wednesday, April 13, 2022, 07:46, Aaron Schmidt, , , , , , , Problems/Solutions, Water leak 
Wednesday, April 13, 2022, 07:38: Appears to have a water leak. Vacuum @ 8.48e-06T. All power / sources shut off. (Had already tripped).
Wednesday, April 13, 2022, 07:44: All waterlines closed. Water leak confirmed. Vacuum dropped to 2.33e-06T.
Entry  Thursday, April 21, 2022, 13:38, Aaron Schmidt, , , , , , , Problems/Solutions, Leak checks 
https://elog.triumf.ca/TIS/Test-Stand/919
Vacuum Group LD#1
(A) Top feed through fittings upgraded
Entry  Sunday, July 10, 2022, 22:19, Aaron Schmidt, , , , , , , Problems/Solutions, TP2 Trip / TMS:RP2 issue 
 Sunday, July 10, 2022, 22:19: A trip was noted on TP2. the backing pressure is quite high. Shutting off the turbo pumps for the beamline side.
Entry  Wednesday, November 16, 2022, 13:28, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:TP1A Replaced 
 See elog 944
Wednesday, November 16, 2022, 13:23: TP1 A replaced
Wednesday, November 16, 2022, 13:25: Roughing.
Entry  Tuesday, January 17, 2023, 09:48, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:RP2 Failure 
Tuesday, January 17, 2023, 09:48: TMS:RP2 off. Audible failure was in progress. Also observable on the strip tool. Vacuum group contacted.
Entry  Thursday, January 18, 2024, 10:47, Aaron Schmidt, , , , , , , Problems/Solutions, FC0 Solenoid Replaced. 
Issues with valve operations due to a leak in the solenoid valve above FC0. The HPA leak did not allow for sufficient pressure to remain in the lines
to operate. The solenoid as changed this morning.
Thursday, January 18, 2024, 10:32: Roughing. Valves can be cycled. FC0 cycled. OK.
Entry  Tuesday, February 06, 2024, 14:09, Aaron Schmidt, , , , , , , Problems/Solutions, FC0 Solenoid issue 
Tuesday, February 06, 2024, 14:06: Attempted to 'Close' FC0. While it succeeded in moving into position, HPA rushed out of the exhaust. This solenoid
was replaced recently on January 18th. Requires replacement. (ordered)
Reference: https://elog.triumf.ca/TIS/Test-Stand/990
Entry  Friday, February 16, 2024, 05:03, Aaron Schmidt, , , , , , , Problems/Solutions, Coil PS issue Coil_PS_Control_Card.png
15-02-2024
The coil PS control card is fried. Roughly since the beginning of December. The PS was removed.
See attached image.
Entry  Monday, February 26, 2024, 10:24, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:RP2 purge. TS exhaust clearing. + TMS:TP6 
Monday, February 26, 2024, 10:12:
While attempting to cycle FC0, noticed that the turbo pumps TMS:TP6 & TMS:TP2 were off, with TP2 being tripped off. The vacuum on TMS:CG2A
sat around 0.825T although RP2 was running. The ballast plug has since been removed to allow for a 2 hour purge of the roughing pump.
Entry  Monday, April 15, 2024, 14:35, Aaron Schmidt, , , , , , , Problems/Solutions, TSH:EE Issues 
Monday, April 15, 2024, 14:33: On Friday it was noted that the EE was being troublesome. If we put -500 V on the EE the PS would deliver -1000 V. However
it would slowly trickle downward. elog:1002.
Entry  Tuesday, August 06, 2024, 15:50, Aaron Schmidt, , , , , , , Problems/Solutions, TS Troubleshooting - Leak/HV spark issues 
Due to HV sparking & possible water leaks on the previous TiC & Ta targets, checks are to be performed.
Chamber is empty. U-Line installed. All waterlines purged. FS#2, 3, 4, & 5 are closed.
Vacuum Group LD #2 - Connected to TP1B backing line
Entry  Tuesday, August 13, 2024, 09:31, Dave Neilson, , , , , , , Problems/Solutions, Troubleshooting HV sparks and FC0 signal temp_8-13.PNG
Monday, August 12, 2024, 17:00   EOD. target installed, roughed, turbos on. No effect on vacuum from turning on water cooling lines. TGHT TBHT
slowly brought to 230A/230A overnight. 
Tuesday, August 13, 2024, 09:28.  Vacuum at 9.9e-7T.  TGHT TBHT at 210/210. accelerating heating to 230/230. bringing up HV EZL
Entry  Thursday, December 05, 2024, 11:08, Aaron Schmidt, , , , , , , Problems/Solutions, Swap RP1 & Inspection (ITS Pumps) Media.jpgMedia_(2).jpgMedia_(1).jpgMedia_(3).jpgMedia_(4).jpg
 Thursday, December 05, 2024, 11:04: RP1 was struggling to pump down. RP SN: MY20055A02 removed. Tip seal replacement likely req'd.
Swapped with a new roughing pump SN: MY2340SA06 (Voltage set to 115V. Shipping locks loosened prior to install)
Ballast filter installed.
Entry  Wednesday, September 14, 2011, 15:33, John Wong, Test#1, HP-SIS, ITW, TM1, test, test, In progress, testing elog for test stand 
Wednesday, September 14, 2011, 15:33
blah blah blah...
Entry  Wednesday, September 14, 2011, 15:40, Anders Mjos, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, In progress, TaC#1 installed and pumping down. 
Wednesday, September 14, 2011, 15:39: Vacuum at 1.3e-5 torr 
Thursday, September 15, 2011, 08:59: Vacuum at 2.9e-7 torr. Water flowing and vacuum stable. 
Entry  Friday, September 16, 2011, 12:39, Aurelia Laxdal, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, In progress, HV conditioning 
Started the HV conditioning: TSG:BIAS=30kV and TSH:EE=-700V.
Entry  Monday, September 19, 2011, 09:11, Aurelia Laxdal, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, In progress, Started target and tube heaters.  
Heaters conditioning went fine: 580A and 230A.
Did a mass scan:
Plotdump-local-clean.txt Sept19 11 12-45-22.txt