ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject Text Attachments
  570   Wednesday, February 15, 2017, 13:42 Aaron Schmidt    42218-1141751-6Problems/SolutionsVacuum Check (Water leak)*Vacuum from previous test still active,
minus turbo pumps. Same target, & heat
shield as well.*
  
  571   Tuesday, February 21, 2017, 10:35 Aaron Schmidt    42218-1141751-6Problems/SolutionsWater leak (E)(G)Water leak found on water block lines (E)
& (G) on FS #3.
Both lines were removed at the water
  
  577   Monday, April 10, 2017, 15:12 Anders Mjos      Problems/SolutionsVacuum leak on front doorThe vacuum behaved erratic over night with
excursion up into the mid 10^-6 Torr range.
To investigate the chamber was vented. With
  
  578   Wednesday, April 12, 2017, 16:04 Anders Mjos      Problems/SolutionsLeak on FS#3 COIL and EEA water to vacuum leak has been found on
FS#3. The leak is not detected on the leak
detector, but can be seen as an increase
 2017-04-12_COIL_Leak_IG1.png2017-04-12_COIL_Leak_RGA.png4-18-2017_TP1B_&_water_leak.docx 
  579   Tuesday, April 18, 2017, 07:46 Aaron Schmidt      Problems/SolutionsTSG:TP1B & TSG:BV1B trippedTuesday, April 18, 2017, 07:30: TSG : TP1B
Tripped on Saturday.
Tuesday, April 18, 2017, 07:40: TSG
 Cooling_&_Turbo_Replacement.docx 
  585   Wednesday, May 17, 2017, 10:17 Anders Mjos HP-FEBIAD-CTL    Problems/SolutionsSparking between new coil line and ground electrodeWednesday, May 17, 2017, 10:17: Sparking
around 20 kV. Will need to vent to increase
gap between water lines.
  
  587   Wednesday, May 24, 2017, 11:12 Anders Mjos      Problems/SolutionsFEBIAD Anode bias configuration The Test Stand has been configured
for Anode bias. John Chow changed the power
supply and the electrical connections have
 20170524-ST-currentvscoil-CHT300A.PNG 
  589   Saturday, June 03, 2017, 09:34 Anders Mjos      Problems/SolutionsFEBIAD Cathode bias configuration


   
        
            
  
  601   Thursday, August 03, 2017, 17:00 Anders Mjos      Problems/SolutionsVacuum system tripped on power interruption Thursday, August 03, 2017, 17:00:
Restarted TPs
  
  603   Thursday, August 17, 2017, 12:45 Anders Mjos      Problems/SolutionsTBHT power supply removed  The Xantrex 10V 600 A power supply
for the TBHT has been moved to ITE to replace
the failed TGHT power supply
  
  604   Monday, August 21, 2017, 16:20 Anders Mjos      Problems/SolutionsTBHT power supply removed


   
        
            
  
  613   Monday, October 30, 2017, 08:54 Anders Mjos      Problems/SolutionsTMS:TP6 shut down due to high noiseThe turbo pump will need replacement.   
  614   Wednesday, November 15, 2017, 10:56 Aaron Schmidt      Problems/SolutionsTMS:TP6 replacementTurbo pump TP6 requires replacement.
Wednesday, November 15, 2017, 09:55:
Turbo (TP2) off. Ion gauge off.
  
  616   Monday, December 04, 2017, 08:29 Aaron Schmidt      Problems/SolutionsPower outagePower outage over the weekend. Reboot PLC
and systems.
Monday, December 04, 2017, 08:22:
 20171205_103324.jpg 
  620   Tuesday, January 02, 2018, 09:18 Anders Mjos      Problems/SolutionsStarting systemTuesday, January 02, 2018
Cycled power for TCSIOC and PLCIOC
TP2 and TP6 started
  
  628   Monday, February 05, 2018, 09:17 Aaron Schmidt      Problems/SolutionsEpics lossMonday, February 05, 2018, 09:10: the epics
program was in 'White-out'. Turbo pumps tripped.
Unplug, re-plug PLC.
  
  650   Tuesday, March 20, 2018, 09:14 Aaron Schmidt      Problems/SolutionsOptics issueTuesday, March 20, 2018, 09:11: TMS:Q5
& TMS:Q2 controllers require repair.
Unable to hold a negative voltage.
  
  661   Tuesday, May 22, 2018, 08:48 Anders Mjos      Problems/SolutionsTSG:TP1A not runningPump found off on Tuesday morning.
Tuesday, May 22, 2018, 08:40: Starting
TP1A
  
  662   Thursday, May 24, 2018, 08:38 Anders Mjos      Problems/SolutionsVenting beamline for IG6 replacementThursday, May 24, 2018, 08:38: TPs stopped
Thursday, May 24, 2018, 09:18: Venting
Thursday, May 24, 2018, 14:30: IG6
  
  663   Thursday, May 24, 2018, 15:28 Anders Mjos      Problems/SolutionsReconfigured FEBIAD coil for testing new source trayThursday, May 24, 2018: Configured coil
to be (-) E&F, (+) G&H. Water should
be supplied to both terminals in either configuration.
  