Entry  Monday, October 17, 2011, 10:22, Anders Mjos, FEBIAD, , , , , , Problems/Solutions, Variable leak valve replaced F3-649.PDF

Variable leak valve with serial number F3-592 has been replaced by F3-649 due to regulating problems described previously by Fridhelm Ames.

    Reply  Monday, November 14, 2011, 15:40, Anders Mjos, , , , , , , Problems/Solutions, Variable leak valve repaired F3-VCR-43_Repair_F3-592.PDF

Anders Mjos wrote:

Variable leak valve with serial number F3-592 has been replaced by F3-649 due to regulating problems described previously by Fridhelm Ames.

 The variable leak valve F3-592 has been repaired. Contaminated diaphragm was replaced. See attachment for details.

Entry  Tuesday, December 13, 2011, 14:10, Aurelia Laxdal, , , , , , , , Test Stand IOC reboot 

Evgeniy rebooted the ISAC Test Stand IOC. Re-started EPICS at the Test Stand.

Found all 4 turbo pumps off and their backing valves closed. Re-started the pumps.

Entry  Monday, December 19, 2011, 13:09, Aurelia Laxdal, , , , , , , , Test Stand updates 

In January Controls will install a new firewall for ISAC Test Stand. Until then ISAC Test Stand can be used, but it may require an IOC reboot once in while.

    Reply  Tuesday, December 20, 2011, 16:09, Anders Mjos, , , , , , , Problems/Solutions, Variable leak valve repaired 

Anders Mjos wrote:

Anders Mjos wrote:

Variable leak valve with serial number F3-592 has been replaced by F3-649 due to regulating problems described previously by Fridhelm Ames.

 The variable leak valve F3-592 has been repaired. Contaminated diaphragm was replaced. See attachment for details.

 The leak valve has been tested with He and a leak detector. The leak valve could regulate in the complete range of the leak detector. 10^-11 to 10^-4 atm cc/s

Entry  Friday, January 20, 2012, 10:37, Friedhelm Ames, , , , , , , , vacuum pumps shut off 

turbo pumps shut off due to work on cooling water system

Entry  Tuesday, January 24, 2012, 09:44, Friedhelm Ames, , , , , , , , turbo pumps restarted 

All turbo pumps have been restarted after cooling water is back and running.

 

Entry  Wednesday, February 08, 2012, 17:39, Friedhelm Ames, , , , , , , Failed, TSG:TP1B failure 

Both turbo pumps at the source box were found off. TSG:TP1A has been started normally. TSG:TP1B does not spin up above 3KRPM even after several attemps. A fault report has been send to vacuum group.

 

    Reply  Wednesday, February 08, 2012, 18:16, Friedhelm Ames, , , , , , , Failed, TSG:TP1B and TSG:TP1A failure  

Friedhelm Ames wrote:

Both turbo pumps at the source box were found off. TSG:TP1A has been started normally. TSG:TP1B does not spin up above 3KRPM even after several attemps. A fault report has been send to vacuum group.

 

 after about 30 minutes running at normal speed TP1A failed as well. Both pumps will be kept off over night.

Entry  Thursday, February 16, 2012, 15:59, Anders Mjos, , , , , , , Problems/Solutions, He and Ne installed and gas lines leak checked 

New supply of He and Ne was installed yesterday and gas lines leak checked. The He bottle is currently closed.


UPDATE Monday, June 17, 2013, 15:17

Specifications for the currently installed Ne leak (SN: 11-231) can be found on DocuShare

https://documents.triumf.ca/docushare/dsweb/Get/Document-46969

Entry  Friday, February 17, 2012, 10:27, Aurelia Laxdal, , , , , , , Done, Started the Archivers 

Started both ISACT and SOURCES Archivers.

Entry  Monday, February 27, 2012, 17:39, Friedhelm Ames, , , , , , , In progress, target and tube heaters ramped up 

ramping up target to 300 A and tube to 270 A

Entry  Tuesday, February 28, 2012, 10:29, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Test FEBIAD at ISAC test statnd 
 
Entry  Tuesday, February 28, 2012, 11:04, Pierre Bricault, , , , , , , ,  

 Calibrating the gas valve

Entry  Tuesday, February 28, 2012, 16:32, Brandon Humphries, , , , , , , , Initial settings for FEBIAD on Test Stand grab.V13332.pnggrab.m13336.png

ISAC Test Stand FEBIAD Ion Source and ISACT optics screen grabs before practicing tuning.  Tune saved as: data/febiaddata/tune/120228-1620_0.snap and data/isactdata/tune/120228-1620_0.snap respectively.<br>

Seeing 1.93e-06 on TMS:FC0 and 3.30e-09 on TMS:FC6.

Entry  Wednesday, February 29, 2012, 09:43, Friedhelm Ames, , , , , , , , checking gas inlet valve for FEBIAD 
 
Entry  Wednesday, February 29, 2012, 15:08, Friedhelm Ames, , , , , , , , connected Al(CH3)3 

connected A(CH3)3 instead of He, pumped line and valve with pump on the high voltage rack.. Opened regulating valve first response at mass 27 with valve set point at 7.0.

Entry  Wednesday, February 29, 2012, 17:22, Friedhelm Ames, , , , , , , , mass scan  grab.BI5978.png

mass scan with valve at 7.2 to let in Al(CH3)3 saved as

plotdump-local-clean.txt_Feb29_12_17-19-20.txt


Entry  Wednesday, February 29, 2012, 17:26, Friedhelm Ames, , , , , , , , gas inlet valves closed 
 
Entry  Thursday, March 01, 2012, 17:04, Friedhelm Ames, , , , , , , , new mass scan grab.S19441.png

bigger mass scan after separator optimization and with finer step size

 