  493   Friday, January 22, 2016, 13:35 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  496   Wednesday, March 02, 2016, 12:08 Anders Mjos      Problems/SolutionsTGHT insulator broken The insulator for the TGHT terminals
cracked during an attempt to remove a seized
bolt.The right TGHT block was removed with
  
  504   Friday, April 15, 2016, 16:07 Anders Mjos      Problems/SolutionsANODE polarity switched to positiveto test the effect of extraction when biasing
of the target.
  
  505   Wednesday, April 20, 2016, 08:27 Anders Mjos      Problems/SolutionsANODE polarity switched to negative

    

       
            
  
  513   Friday, June 10, 2016, 12:42 Anders Mjos      Problems/SolutionsFC0 BIAS probelm Graham Waters is looking into this
problem. The IOC has been rebooted a couple
of times.
  
  520   Wednesday, July 06, 2016, 10:42 Anders Mjos      Problems/SolutionsEmittance scanner check/repair.Dave Morris increased the current from
~ 1 A to ~2.5 A. This seem to solve the problem
with the in/out drive of the emittance meter
  
  526   Thursday, July 28, 2016, 08:21 Anders Mjos      Problems/SolutionsTMS:MB1 time outFault report submitted. 9156
Thursday, July 28, 2016, 09:55: Controls
group resolved the issue by cycling the power
  
  531   Friday, August 12, 2016, 14:40 Aaron Schmidt      Problems/SolutionsEmittance scanner communicationsWednesday, July 27, 2016, 16:06:  Spark
around 15:10 or 16:05
Emittance rig communications affected.
  
  538   Wednesday, September 07, 2016, 15:50 Aaron Schmidt      Problems/SolutionsTSG:RP1 running unevenFault report was submitted.
Anders informed Anthony on Tuesday,
Sept 6, 2016.
  
  540   Thursday, September 08, 2016, 09:12 Anders Mjos      Problems/SolutionsFilament change on IG6Thursday, September 08, 2016, 08:20: Vacuum
group changed to the other filament to investigate
vacuum spikes on IG6
  
  541   Tuesday, September 13, 2016, 14:38 Anders Mjos      Problems/SolutionsTSG:RP1 replaced

    

       
            
  
  542   Wednesday, September 14, 2016, 13:58 Anders Mjos      Problems/SolutionsTSG:RP1 latched breaker

    

       
            
  
  544   Friday, September 30, 2016, 11:14 Aaron Schmidt      Problems/SolutionsTSG:RP1 ReplacementFriday, September 30, 2016, 10:01: Roughing
pump RP1 failed during roughing. Breaker
was tripped to RP1 & RP2.

Friday, September
  
  546   Friday, October 14, 2016, 13:17 Anders Mjos      Problems/SolutionsPowerbump tripped off turbosFriday, October 14, 2016, 13:17: Restarted
pumps
Friday, October 14, 2016, 13:4: Another
  
  548   Monday, October 24, 2016, 16:02 Aaron Schmidt      Problems/SolutionsPump down empty chamber/Clean Exhaust/TestMonday, October 24, 2016, 15:45: Remove
metal mesh covering roughing pump exhaust.
Clean out mesh (3/4"-5/8"
 Exhaust_pump_down.docx 
  552   Thursday, November 24, 2016, 10:39 Aaron Schmidt      Problems/SolutionsTMS:TP2 Thursday, November 24, 2016, 08:05: Whining
sound (high pitch) heard from TMS:TP2
Thursday, November 24, 2016, 10:37:
  
  555   Tuesday, November 29, 2016, 11:20 Anders Mjos      Problems/SolutionsTSH:UHV1 remvoedThe variable leak rate valve will be used
for TM3 HV spark tests in TCS
  
  560   Thursday, January 19, 2017, 13:23 Anders Mjos      Problems/SolutionsTSH:UHV1 remvoed


   
        
            
  
  561   Friday, January 20, 2017, 08:45 Aaron Schmidt      Problems/SolutionsTSG:TP1A & TSG:BV1A trippedFriday, January 20, 2017, 08:25: TSG :
TP1A and TSG : BV1A were noticed to be tripped
around 6am.
  
  569   Monday, February 06, 2017, 09:14 Aaron Schmidt      Problems/SolutionsPower outage.Weekend power outage. All turbos were tripped.
Epics white out. Control group notified.
Monday, February 06, 2017, 09:07:
  