    Reply  Friday, January 22, 2016, 13:35, Aurelia Laxdal, , , , , , , Problems/Solutions, TSG:RP1 nor performing 

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Aurelia Laxdal wrote:

Anders Mjos wrote:

The pump failed to pump down below 2 Torr. on Friday 15th E-fault 8680 submitted. Vacuum group will replace the pump today

Edi Dalla Valle from vacuum group replaced the roughing pump TSG:RP1 in the morning. However, the pumping curve showed a leak: see attachment. It was suspected the VCR water line connection between the lid and the base of the target Heat Shield. After venting the chamber found the VCR connection between the lid and the base forgotten finger tight. Tighten it with wrenches and restarted pumping.

 Turned ON the water for the heat shield cooling circuit. Put a lockout padlock on the transformer breaker since Controls work still seems to be underway.

Turned ON the TGHT and ramping it up at a rate of 1A/30sec. Currently it's at 108A.

Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields . Stopped for today at 360A for the TGHT and TBHT kept OFF.

 Temperature measurements in progress for Ta46clone HP-SIS target, wrapped with 3 Ta foil heat-shields. currently at 496A and the window is OK.

 Temperature measurements ended on Thursday, January 21, followed by cool down over night.

Entry  Wednesday, March 02, 2016, 12:08, Anders Mjos, , , , , , , Problems/Solutions, TGHT insulator broken 

 The insulator for the TGHT terminals cracked during an attempt to remove a seized bolt.The right TGHT block was removed with the target and the bolt cut to remove the target. The single stand-off insulator on the target assembly cracked in the process.


Friday, March 04, 2016

Re-installed the TGHT terminal with new Keensert.

Entry  Friday, April 15, 2016, 16:07, Anders Mjos, , , , , , , Problems/Solutions, ANODE polarity switched to positive 

to test the effect of extraction when biasing of the target.

    Reply  Wednesday, April 20, 2016, 08:27, Anders Mjos, , , , , , , Problems/Solutions, ANODE polarity switched to negative 

Anders Mjos wrote:

to test the effect of extraction when biasing of the target.

 Testing finished. Switched back to negative polarity.

Entry  Friday, June 10, 2016, 12:42, Anders Mjos, , , , , , , Problems/Solutions, FC0 BIAS probelm 

 Graham Waters is looking into this problem. The IOC has been rebooted a couple of times.

Entry  Wednesday, July 06, 2016, 10:42, Anders Mjos, , , , , , , Problems/Solutions, Emittance scanner check/repair. 

Dave Morris increased the current from ~ 1 A to ~2.5 A. This seem to solve the problem with the in/out drive of the emittance meter

Entry  Thursday, July 28, 2016, 08:21, Anders Mjos, , , , , , , Problems/Solutions, TMS:MB1 time out 

Fault report submitted. 9156

Thursday, July 28, 2016, 09:55: Controls group resolved the issue by cycling the power on the canbus controller

Entry  Friday, August 12, 2016, 14:40, Aaron Schmidt, , , , , , , Problems/Solutions, Emittance scanner communications 

Wednesday, July 27, 2016, 16:06: Spark around 15:10 or 16:05

Emittance rig communications affected.

Enter 100 on Dac -- Reads: -500

Enter -100 on Dac -- Reads: -500. No response

@ 10V


Friday, August 12, 2016, 15:53: Soft reboot on Emittance rig communications

Calibrate

test scan & park

Enter: 100 on Dac -- Reads 100

Enter: 200 on Dac -- Reads 200

Enter: 0 on Dac -- Reads 0

Enter: -200 on Dac -- Reads -200

Fixed

Entry  Wednesday, September 07, 2016, 15:50, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:RP1 running uneven 

Fault report was submitted.

Anders informed Anthony on Tuesday, Sept 6, 2016.

Fault report # 9233.

Entry  Thursday, September 08, 2016, 09:12, Anders Mjos, , , , , , , Problems/Solutions, Filament change on IG6 

Thursday, September 08, 2016, 08:20: Vacuum group changed to the other filament to investigate vacuum spikes on IG6

Spikes In Green.

Spikes in Grey.

    Reply  Tuesday, September 13, 2016, 14:38, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 replaced 

Aaron Schmidt wrote:

Fault report was submitted.

Anders informed Anthony on Tuesday, Sept 6, 2016.

Fault report # 9233.

 Tuesday, September 13, 2016, 14:38: RP1 replaced by Edi

    Reply  Wednesday, September 14, 2016, 13:58, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 latched breaker 

Anders Mjos wrote:

Aaron Schmidt wrote:

Fault report was submitted.

Anders informed Anthony on Tuesday, Sept 6, 2016.

Fault report # 9233.

 Tuesday, September 13, 2016, 14:38: RP1 replaced by Edi

Wednesday, September 14, 2016, 13:57: The pump does not run properly. Attempting to contact vacuum group

Found that the exhaust pipe needed to be disconnected from the pump. Asked plant group (Curtis) to investigate exhaust pipe on the outside of the building, to check if it is restricted again.


Thursday, September 15, 2016, 11:03: Starting turbos


Thursday, September 29, 2016, 11:16: Turbos stopped.


Friday, September 30, 2016, 08:24: Venting.

Entry  Friday, September 30, 2016, 11:14, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:RP1 Replacement 
Friday, September 30, 2016, 10:01: Roughing pump RP1 failed during roughing. Breaker was tripped to RP1 & RP2. Friday, September 30, 2016, 10:30: Roughing pump RP1 replaced and tested.
Entry  Friday, October 14, 2016, 13:17, Anders Mjos, , , , , , , Problems/Solutions, Powerbump tripped off turbos 

Friday, October 14, 2016, 13:17: Restarted pumps

Friday, October 14, 2016, 13:4: Another trip: restarted pumps


Tuesday, October 18, 2016, 12:12: Venting.

Entry  Monday, October 24, 2016, 16:02, Aaron Schmidt, , , , , , , Problems/Solutions, Pump down empty chamber/Clean Exhaust/Test Exhaust_pump_down.docx

Monday, October 24, 2016, 15:45: Remove metal mesh covering roughing pump exhaust.

Clean out mesh (3/4"-5/8" thick w/ layers of dust/material).

Monday, October 24, 2016, 15:52: Roughing 710.0 T.

Monday, October 24, 2016, 15:54: BV1B opened.

Monday, October 24, 2016, 16:00: Rouging 2.0 T.

Monday, October 24, 2016, 16:10: Turbo pumps available.


Tuesday, October 25, 2016, 08:08: Venting.

Tuesday, October 25, 2016, 08:40: Doors open.

Tuesday, October 25, 2016, 08:50: Roughing.

Tuesday, October 25, 2016, 08:51: Doors sealed for roughing.

Tuesday, October 25, 2016, 08:52: BV1B opened.

Tuesday, October 25, 2016, 09:10: Turbo pumps available & started.

Tuesday, October 25, 2016, 09:20: Ion gauge on.


Thursday, October 27, 2016, 08:35: Ion Gauge & Turbo pumps off.

Thursday, October 27, 2016, 11:44: Venting.

Entry  Thursday, November 24, 2016, 10:39, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:TP2  

Thursday, November 24, 2016, 08:05: Whining sound (high pitch) heard from TMS:TP2

Thursday, November 24, 2016, 10:37: Sound fades in and out roughly every 3-5 minutes. Vacuum group notified. Monitor.

Thursday, November 24, 2016, 15:21: Vent tomorrow AM as per Vacuum group. Edi.

Thursday, November 24, 2016, 15:38: Turbo  pumps TMS:TP6 & TMS:TP2 were turned of. Backing valves closed. Ion gauge IG6 also off.

Thursday, November 24, 2016, 16:34: Two short vent bursts. - AM


Friday, November 25, 2016, 10:21: Venting -AM

Friday, November 25, 2016, 11:00: Pump being replaced

 Friday, November 25, 2016, 14:01: Roughing

Friday, November 25, 2016, 14:40: Turbos started.

Friday, November 25, 2016, 14:45: Turbos at speed. Vacuum at 1.9E-5 T

*** Note *** : One of the copper cooling lines was leaking. The line was fixed. Monitor.


Monday, November 28, 2016, 08:47: Turbo pump operating well. No leaks detected on cooling lines.

Entry  Tuesday, November 29, 2016, 11:20, Anders Mjos, , , , , , , Problems/Solutions, TSH:UHV1 remvoed 

The variable leak rate valve will be used for TM3 HV spark tests in TCS

    Reply  Thursday, January 19, 2017, 13:23, Anders Mjos, , , , , , , Problems/Solutions, TSH:UHV1 remvoed 

Anders Mjos wrote:

The variable leak rate valve will be used for TM3 HV spark tests in TCS

 Variable leak valve returned yesterday (2017-01-18). New calibrated leaks installed. Ar and Ne. System leak checked OK after.

Entry  Friday, January 20, 2017, 08:45, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:TP1A & TSG:BV1A tripped 

Friday, January 20, 2017, 08:25: TSG : TP1A and TSG : BV1A were noticed to be tripped around 6am.

Friday, January 20, 2017, 08:42: Bypass to restart TSG : TP1A and TSG : BV1A. TP1A is at speed.

      ------      

Continue to monitor.

Entry  Monday, February 06, 2017, 09:14, Aaron Schmidt, , , , , , , Problems/Solutions, Power outage. 

Weekend power outage. All turbos were tripped. Epics white out. Control group notified.

Monday, February 06, 2017, 09:07: Turbo pumps TMS : TP2 & TMS : TP6 restarted.

Monday, February 06, 2017, 09:12: TMS: IG6 ion gauge restarted.

Monday, February 06, 2017, 10:14: Turbo pumps TSG : TP1A & TSG : TP1B restarted.

Monday, February 06, 2017, 10:19: Ion gauge on. TP1B @ speed 42 KRPM.

Monday, February 06, 2017, 10:22: TP1A @ speed 38 KRPM.