871
|
Monday, April 19, 2021, 14:58 |
Anders Mjos | | P2N-SIS | | | | | Problems/Solutions | Water leak on coil neg (H and F) | Determined on Friday April 16th that the
water leak was on the coil negative circuit.
This was determined by circulating water |
|
872
|
Wednesday, April 28, 2021, 22:34 |
Luca Egoriti | P2N test - Apr 2021 | P2N-SIS | ITE | TM4 | | | In progress | P2N heating test | Wednesday, April 28, 2021, 22:30
First P2N heating test ongoing.
At P2NHT ~ 570 A and TBHT ~ 100 A |
|
922
|
Monday, May 02, 2022, 14:10 |
Aaron Schmidt | | P2N-SIS | | | | | | Empty Chamber PS test. | No P2N is loaded. Testing the power supplies.
Tuesday, May 03, 2022, 10:07
In the past few days, the ITS has |
|
923
|
Thursday, May 05, 2022, 14:43 |
Aaron Schmidt | | P2N-SIS | | | 45241-1 | 45240-1 | In progress | P2N assembly conditioning. | Thursday, May 05, 2022, 14:43: Roughing.
Open BV1B
Thursday, May 05, 2022, 14:46: Upper |
|
924
|
Monday, May 09, 2022, 10:08 |
Luca Egoriti | | P2N-SIS | ITE | TM4 | | | In progress | P2N heating test | Beginning of May:
The cabling on the top of the test
stand was changed to adapt for P2N testing. |
|
925
|
Tuesday, May 10, 2022, 10:09 |
Aaron Schmidt | | P2N-SIS | ITE | TM4 | 45241-1 | 45240-1 | In progress | P2N assembly conditioning - 2 | Ref: https://elog.triumf.ca/TIS/Test-Stand/924.
During testing, it was noted one leg was
glowing vs the other. P2N assembly was removed |
|
926
|
Wednesday, May 11, 2022, 10:05 |
Aaron Schmidt | | P2N-SIS | ITE | TM4 | 44812-2 | 45240-1 | | P2N assembly conditioning - 3 | Target oven #45241-1 swapped out. SS bolts
were in use on the legs.
Molybdenum screws in the legs on |
|
927
|
Thursday, May 12, 2022, 10:50 |
Aaron Schmidt | | P2N-SIS | ITE | TM4 | 44812-2 | 45240-1 | In progress | P2N assembly conditioning - 4 | PE shimmed & extended 1mm due to likely
ion source contact.
Thursday, May 12, 2022, 10:41: Roughing. |
|
3
|
Wednesday, September 14, 2011, 15:40 |
Anders Mjos | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | In progress | TaC#1 installed and pumping down. | Wednesday, September 14, 2011, 15:39: Vacuum
at 1.3e-5 torr
Thursday, September 15, 2011, 08:59: |
|
6
|
Friday, September 16, 2011, 12:39 |
Aurelia Laxdal | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | In progress | HV conditioning | Started the HV conditioning: TSG:BIAS=30kV
and TSH:EE=-700V. |
|
7
|
Monday, September 19, 2011, 09:11 |
Aurelia Laxdal | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | In progress | Started target and tube heaters. | Heaters conditioning went fine: 580A and
230A.
Did a mass scan: |
|
8
|
Tuesday, September 20, 2011, 19:00 |
Aurelia Laxdal | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | Done | Finished testing TaC#1 | Tuesday, September 20, 2011:
Did another mass scan today at 5:40.
Saved as: plotdump-local-clean.txt Sept 20 |
|
72
|
Monday, April 16, 2012, 11:16 |
Anders Mjos | Nb#6 | LP-SIS | ITW | TM1 | | | In progress | Venting, purging cooling lines | Venting chamber and purging cooling lines
in preparation for target removal |
|
73
|
Monday, April 16, 2012, 11:56 |
Anders Mjos | Nb#6 | LP-SIS | ITW | TM1 | | | In progress | Venting, purging cooling lines |
|
|
77
|
Friday, April 20, 2012, 08:56 |
Anders Mjos | Nb#6 | LP-SIS | ITW | TM1 | | | Problems/Solutions | Insulator stand-off failure | When the target was removed from
the test stand it was discovered that the
custom designed insulator stand-off (ITD0400 |
|
101
|
Thursday, May 31, 2012, 15:43 |
Anders Mjos | Ta#38 | LP-SIS | ITW | TM1 | | | In progress | Target ready to be heated | Thursday, May 31, 2012, 15:42: Roughing
Thursday, May 31, 2012, 16:01 : Starting
turbos |
|
102
|
Friday, June 01, 2012, 12:23 |
Aurelia Laxdal | Ta#38 | LP-SIS | ITW | TM1 | | | In progress | HV & Heaters conditioning. | Did the HV conditioning.
Heaters conditioning in progress.
The Hall probe is not working: couldn't |
|
103
|
Monday, June 04, 2012, 10:51 |
Anders Mjos | Ta#38 | LP-SIS | ITW | TM1 | | | Done | Venting chamber |
|
|
192
|
Friday, August 31, 2012, 13:59 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | In progress | Nb#7 installed | Friday, August 31, 2012, 15:19: roughing
Friday, August 31, 2012, 15:39 :
starting turbos |
|
193
|
Tuesday, September 04, 2012, 08:11 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | Done | Nb#7 installed |
|
|