ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
284
|
Tuesday, March 19, 2013, 17:25 |
Sebastian Raeder | | | | | | | Problems/Solutions | new turbo installed | Edi replaced the faulty turbo pump in the
mass separator section.
Roughing and turbo started |
|
283
|
Tuesday, March 19, 2013, 12:34 |
Anders Mjos | SiC#28 | | ITE | TM4 | | | Done | Installation of SiC#28 LP-RFQ | Tuesday, March 19, 2013, 12:32 : Turbos
off (vaccum at 2E-7 Torr)
Tuesday, March 19, 2013, 13:35: Venting |
|
282
|
Tuesday, March 19, 2013, 09:04 |
Anders Mjos | | | | | | | Problems/Solutions | Venting TMS section for replacement of TP2 by vacuum group |
|
|
281
|
Monday, March 04, 2013, 09:11 |
Anders Mjos | | | | | | | Problems/Solutions | Restarted turobos after planned power outage | Started archivers
Started turbos
Switched on ion gauges |
|
280
|
Tuesday, February 26, 2013, 08:32 |
Anders Mjos | | | | | | | Problems/Solutions | TMSTP2 timeout / fault | Tuesday, February 26, 2013, 08:24: Started
turbo
Tuesday, February 26, 2013, 08:24: |
|
279
|
Tuesday, February 19, 2013, 08:28 |
Anders Mjos | | | | | | | Problems/Solutions | Opened all backing valves after scheduled site wide air outage | |
|
278
|
Monday, January 28, 2013, 14:41 |
Anders Mjos | Empty | | | | | | | Pumping down | Monday, January 28, 2013, 14:41: Roughing
Monday, January 28, 2013, 15:35:
Starting turbos |
|
277
|
Monday, January 28, 2013, 12:56 |
Anders Mjos | Empty | | | | | | | Venting | For conductor bolt work
Monday, January 28, 2013, 12:56:
Turbos off |
|
276
|
Friday, January 18, 2013, 16:17 |
Anders Mjos | RFQ empty | | | | | | In progress | heating |
|
|
275
|
Friday, January 18, 2013, 15:57 |
Anders Mjos | | | | | | | Problems/Solutions | Conductor bolts to be replaced | After the last test at the test stand,
one of the conductor bolts (ITD0058) is damaged.
To prevent damage to the thread inserts, |
|
274
|
Friday, January 18, 2013, 15:34 |
Anders Mjos | empty | | | | | | | Pumping down empty chamber | Started roughing
Friday, January 18, 2013, 15:25:
Started turbos |
|
273
|
Friday, January 18, 2013, 11:28 |
Sebastian Raeder | RFQ empty | | | | | | | stop turbos | Friday, January 18, 2013, 11:28: turbos
stopped |
|
272
|
Thursday, January 17, 2013, 08:16 |
Sebastian Raeder | RFQ empty | | | | | | In progress | heating | Thursday, January 17, 2013, 08:16: started
heating of the target, vacuum at 2.6E-7T
Thursday, January 17, 2013, |
|
271
|
Wednesday, January 16, 2013, 01:06 |
Sebastian Raeder | RFQ empty | | | | | | | Target installed - pumping down | RFQ empty target installed
Wednesday, January 16, 2013, 01:05:
roughing started |
|
270
|
Tuesday, January 15, 2013, 16:10 |
Anders Mjos | RFQ empty | | | | | | | Turbos off |
|
|
269
|
Tuesday, January 15, 2013, 15:12 |
Sebastian Raeder | RFQ empty | | | | | | | Start cooling | Start cooling of Target RFQ empty |
|
268
|
Monday, January 14, 2013, 18:18 |
Friedhelm Ames | | | | | | | | TMS:CBC1 not working | The optics at the teststand has been switched
on, but TMS:CBC1 is not working. A fault
report has been send to controls. |
|
267
|
Monday, January 14, 2013, 13:51 |
Sebastian Raeder | RFQ empty | | | | | | In progress | heating | Started heating the target, now Silica
sleevings are installed for wire insulation
and the gap target -- repeller is now 0.6mm |
|
266
|
Friday, January 11, 2013, 11:02 |
Anders Mjos | RFQ empty | | | | | | | Target installed, pumping down | Target installed with 120 in lbs torque
on target legs and on central support.
Friday, January 11, 2013, 11:01: |
|
265
|
Friday, January 11, 2013, 08:37 |
Anders Mjos | Empty | | | | | | In progress | Venting | Friday, January 11, 2013, 08:36: Venting
for installation of RFQ test target later
today |
|
|