264
|
Wednesday, January 09, 2013, 14:13 |
Anders Mjos | Empty | | | | | | | Rouging | Wednesday, January 09, 2013, 14:12: Roughing
empty chamber |
|
263
|
Wednesday, January 09, 2013, 10:39 |
Anders Mjos | RFQ empty | | | | | | In progress | Venting | Wednesday, January 09, 2013, 10:38:
Turbos off. Vacuum at 1.7 E-7 T
Wednesday, January 09, 2013, 13:24 |
|
262
|
Monday, January 07, 2013, 14:52 |
Sebastian Raeder | RFQ empty | | | | | | | heating target | heating target for RFQ tests. Now the wiring
is insulated with alumina beats and tubing
and the target has the standard Ta alkali |
|
261
|
Friday, January 04, 2013, 15:07 |
Anders Mjos | RFQ empty | | | | | | In progress | Pumping down | Friday, January 04, 2013, 15:04: Roughing
Friday, January 04, 2013, 15:24:
Starting turbos |
|
260
|
Friday, January 04, 2013, 10:52 |
Anders Mjos | | | | | | | In progress | Preparing for venting | Friday, January 04, 2013, 10:51:
Vacuum at 3.2E-7 T
Friday, January 04, 2013, 10:52: |
|
259
|
Thursday, January 03, 2013, 11:39 |
Anders Mjos | | | | | | | Problems/Solutions | Starting pumps after holiday shut down - TMSRP2 replaced | Thursday,
January 03, 2013, 11:28: TMSRP2 is noisy.
Stopped. |
|
258
|
Thursday, January 03, 2013, 08:33 |
Anders Mjos | | | | | | | Problems/Solutions | Started archivers after holiday shut down | Started archivers. Controls whited out. |
|
257
|
Thursday, December 20, 2012, 14:19 |
Anders Mjos | | | | | | | | Power down for holidays | |
|
256
|
Wednesday, December 19, 2012, 16:22 |
Sebastian Raeder | | | | | | | Problems/Solutions | status after power outage | Wednesday, December 19, 2012, 16:24:
After long power outage, everything
is off except the roughing pumps. Two turbo |
|
255
|
Wednesday, December 19, 2012, 11:24 |
Anders Mjos | | | | | | | Problems/Solutions | Restarted turbos in TMS section after power bump | Sources arch restared |
|
254
|
Wednesday, December 19, 2012, 09:44 |
Sebastian Raeder | | | | | | | In progress | venting | venting and inspect the target
Wednesday, December 19, 2012, 09:43:
vqacuum at 1.9E-7T, stop turbos |
|
253
|
Tuesday, December 18, 2012, 16:00 |
Sebastian Raeder | RFQ empty | | | | | | Done | target heating | Tuesday, December 18, 2012, ~ 13:00 start
ramping the TGHT current, vacuum at 1.7E-7T
Tuesday, December 18, 2012, 15:56: |
|
252
|
Tuesday, December 18, 2012, 12:51 |
Sebastian Raeder | | | | | | | | Anode powersupply connected to HV-common | The anode PS is turned off and connected
to HV common.
the Target is connected to a -18V |
|
251
|
Monday, December 17, 2012, 22:35 |
Sebastian Raeder | RFQ empty | | | | | | | wire connection for RFQ test | Overview over the connections of the new
9Pin connector inside the vacuum and in the
HV cage |
|
250
|
Friday, December 14, 2012, 20:34 |
Sebastian Raeder | RFQ empty | | | | | | Done | pumping down | Friday, December 14, 2012, ~ 17:00: start
roughing pumps
Friday, December 14, 2012, 20:33: |
|
249
|
Friday, December 14, 2012, 15:28 |
Anders Mjos | RFQ empty | | | | | | In progress | Venting |
|
|
248
|
Friday, December 14, 2012, 14:24 |
Sebastian Raeder | RFQ empty | | | | | | | Venting | Friday, December 14, 2012, 14:24 Stop Turbopumps
and prepare venting to insert RFQ target |
|
247
|
Thursday, December 13, 2012, 14:38 |
Anders Mjos | | | | | | | | Pumping down empty chamber | Thursday, December 13, 2012, 14:36: Roughing
Thursday, December 13, 2012, 14:56
: Starting turbos |
|
246
|
Thursday, December 13, 2012, 08:40 |
Anders Mjos | RFQ empty | | | | | | In progress | Venting | Thursday, December 13, 2012, 08:38: TBHT
and TGHT off
Thursday, December 13, 2012, 08:38 : |
|
245
|
Tuesday, December 11, 2012, 13:40 |
Sebastian Raeder | RFQ empty | | | | | | Done | Heating test for Ion guide Laser ion source | new ion guide laser ion source installed.
Pure target container without targetmaterial
and without surface ion source. |
|
|