124
|
Wednesday, July 04, 2012, 13:07 |
Anders Mjos | | | | | | | Problems/Solutions | water lines purged |
|
|
123
|
Wednesday, July 04, 2012, 09:22 |
Friedhelm Ames | | | | | | | Problems/Solutions | turbo pumps stopped | turbo pumps stopped to prepare for venting
for anode short investigation. |
|
122
|
Tuesday, July 03, 2012, 19:05 |
Friedhelm Ames | | | | | | | Problems/Solutions | short in anode | A short in the anode has developed during
the heater ramp up. Increasing the current
limit did not cure it. Start heater ramp |
|
121
|
Tuesday, July 03, 2012, 09:23 |
Friedhelm Ames | | | | | | | In progress | start up again | purged Ne line and started cathode heater
ramp up to 295 A |
|
120
|
Friday, June 29, 2012, 16:39 |
Friedhelm Ames | | | | | | | | mass scan finished |
|
|
119
|
Friday, June 29, 2012, 15:03 |
Friedhelm Ames | | | | | | | | start ramping down heater | |
|
118
|
Friday, June 29, 2012, 15:02 |
Friedhelm Ames | | | | | | | | mass scan finished | mass spectrum saved as
plotdump-local-clean.txt_Jun29_12_14-55-43.txt
|
|
117
|
Friday, June 29, 2012, 13:39 |
Friedhelm Ames | | | | | | | | start mass scan | start mass scan to do new mass calibration |
|
116
|
Friday, June 29, 2012, 08:57 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Continue cathode heating | This morning the pressure was 3.5E-7
T. Current at 275 A is 30nA.
Continue cathode heating to 290 A |
|
115
|
Thursday, June 28, 2012, 17:18 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Leave the cathode heater at 275 A overninght. | |
|
114
|
Thursday, June 28, 2012, 17:00 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Cathode heater reached its value of 230 A and stoped. good test. | Now ramp cathode current up to 290 A. The
total current out is 1.e-7 A.
|
|
113
|
Thursday, June 28, 2012, 15:14 |
Aurelia Laxdal | | LP-FEBIAD | | | | | | Quick check | Just a quick check at the Test Stand:
1. The system operational (
white out not present ) with TSH:TBHT heating |
|
112
|
Thursday, June 28, 2012, 11:29 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Lost all cnntrol interface, complete whiteout of the epics system. | |
|
111
|
Thursday, June 28, 2012, 11:27 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Cathode heating in progress, pressure 8.3e-7 T | |
|
110
|
Thursday, June 28, 2012, 11:19 |
Pierre Bricault | | LP-FEBIAD | | | | | In progress | Cathode ramping to 230 A in progress | |
|
109
|
Thursday, June 28, 2012, 11:13 |
Pierre Bricault | | LP-FEBIAD | | | | | | ISAC test stand ready for cathode heating | The ISAC test stand is ready for cathode
heating.
Bias voltage: 30000 V |
|
108
|
Thursday, June 28, 2012, 11:04 |
Pierre Bricault | Test FEBIAD | LP-FEBIAD | | | | | In progress | Ready to bias the high voltage. | |
|
107
|
Tuesday, June 26, 2012, 18:30 |
Anders Mjos | | | | | | | Problems/Solutions | Crack in source tray insulator | A crack in the insulator ITD0054
was observed while mounting the target assembly.
See attachment. |
|
106
|
Tuesday, June 26, 2012, 18:04 |
Anders Mjos | FEBIAD anode end cap test | | | | Tube only | 38307-9 | In progress | FEBIAD anode end cap test - ready | Testing FEBIAD anode end cap as per dwg
ITD0304 REV C
Target with TUBE ONLY. Do not use |
|
105
|
Tuesday, June 26, 2012, 16:06 |
Anders Mjos | | | | | | | Done | Vented |
|
|