ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
1044
|
Tuesday, January 07, 2025, 17:06 |
Dave Neilson | | LP-FEBIAD | | | 44692-4 | 42972-10 | In progress | FEBIAD development | Tuesday, January 07, 2025, 16:00
- Target assembly installed in test
stand. electrical connections assessed: |
|
1043
|
Friday, December 20, 2024, 09:37 |
Dave Neilson | | | | | | | | Winter holiday shutdown | Friday, December 20, 2024, 09:37
turned off all 4 turbopumps. winding
down prior to evacuating. |
|
1042
|
Tuesday, December 17, 2024, 16:09 |
Dave Neilson | | | | | | | Done | Anode,TGHT, TBHT power supply investigation. Resolved | Note, ground and HVC (high voltage
common) are used interchangeably here.
|
|
1041
|
Tuesday, December 17, 2024, 09:46 |
Dave Neilson | | | | | | 45235-26 | In progress | SIS P2N source cup testing | Monday, December 16, 2024, 3:34 Target
loaded in test stand. Confirmed correct connection
to mass marker power supply through multipin. |
|
1040
|
Tuesday, December 10, 2024, 14:38 |
Isaiah Rabuka | | | | | | | | | Tuesday,
December 10, 2024, 14:38 Depressurized ATTS |
|
1039
|
Friday, December 06, 2024, 16:03 |
Isaiah Rabuka | | | | | | | | | Friday, December
06, 2024, 16:03 Heated and cooled a sample |
|
1038
|
Thursday, December 05, 2024, 15:38 |
Dave Neilson | | LP-FEBIAD | | | 44692-4 | 42972-10 | | FEBIAD development | Tuesday, December 02, 2024, 15:35
- Target loaded into the test stand
Thursday, December 03, 2024, 14:33 |
|
1037
|
Thursday, December 05, 2024, 14:06 |
Isaiah Rabuka | | | | | | | | | Thursday, December 05, 2024, 14:05
Pressurized ATTS with argon, swapped out
samples, and repressurized and heated chamber. |
|
1036
|
Thursday, December 05, 2024, 11:08 |
Aaron Schmidt | | | | | | | Problems/Solutions | Swap RP1 & Inspection (ITS Pumps) | Thursday, December 05, 2024, 11:04:
RP1 was struggling to pump down. RP SN: MY20055A02
removed. Tip seal replacement likely req'd. |
|
1035
|
Wednesday, December 04, 2024, 15:43 |
Isaiah Rabuka | | | | | | | | | Wednesday,
December 04, 2024, 15:42 Depressurized the |
|
1034
|
Tuesday, December 03, 2024, 15:49 |
Isaiah Rabuka | | | | | | | | | Tuesday,
December 03, 2024, 15:48 |
|
1033
|
Tuesday, December 03, 2024, 14:55 |
Dave Neilson | | | | | | | Done | Power supply changed to CATHODE mode (-) | Tuesday, December 03, 2024, 14:55 ANODE/CATHODE
power supply switched to cathode mode, NEGATIVE |
|
1032
|
Thursday, November 28, 2024, 13:47 |
Isaiah Rabuka | | | | | | | | | November 28, 2024 1:46PM
Checked in on sample in ATTS. |
|
1031
|
Thursday, November 28, 2024, 11:47 |
Isaiah Rabuka | | | | | | | In progress | Heating Stage Pellet Testing and Development | Opened the ATTS, placed what I will call
“Cast Alumina Sample #1” into
the ATTS and activated the roughing then |
|
1030
|
Tuesday, November 19, 2024, 14:25 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Tuesday, November 19, 2024, 14:25:
Roughing |
|
1029
|
Wednesday, November 13, 2024, 14:36 |
Aaron Schmidt | UC#(47) - Not included | LP-SIS | ITE | TM3 | 44691-8 | 45235-24 | In progress | Conditioning UC#47 (Assembly only) | Gas line is attached.
Wednesday, November 13, 2024, 14:18:
Roughing. |
|
1028
|
Tuesday, November 05, 2024, 16:40 |
Brady Borrmann | UC #24D (Assembly only) | LP-IG-LIS | | | | 44972-5 / 42972-9 | In progress | Conditioning UC#24D Assembly | 42972-5 Base / 42972-9 Lid
|
|
1027
|
Thursday, October 31, 2024, 13:53 |
Aaron Schmidt | | | | | | | In progress | Chamber empty & Fix IG6 | Thursday, October 31, 2024, 13:53:
Roughing down empty chamber. U-Line installed.
Monday, November 04, 2024, |
|
1026
|
Tuesday, October 29, 2024, 18:25 |
Aaron Schmidt | UC#46 (assembly only) | LP-IG-LIS | ITW | TM4 | | 42972-6 / 39956-1 | In progress | Conditioning UC#46 Assembly | 42972-6 Base / 39956-1 Lid
Tuesday, October 29, 2024, 18:20:
Roughing. |
|
1025
|
Wednesday, October 09, 2024, 13:29 |
Dave Neilson | | | | | 44691-8 | 45235-26 | | Retainer tests - with mass marker target | Wednesday, October 09, 2024, 11:28
Target loaded, remote power supply
added for mass marker, negative channel on |
|
|