  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  1044   Tuesday, January 07, 2025, 17:06 Dave Neilson LP-FEBIAD  44692-442972-10In progressFEBIAD development Tuesday, January 07, 2025, 16:00
-  Target assembly installed in test
stand. electrical connections assessed:
  
  1043   Friday, December 20, 2024, 09:37 Dave Neilson       Winter holiday shutdownFriday, December 20, 2024, 09:37 
  turned off all 4 turbopumps. winding
down prior to evacuating.
  
  1042   Tuesday, December 17, 2024, 16:09 Dave Neilson      DoneAnode,TGHT, TBHT power supply investigation. Resolved Note, ground and HVC (high voltage
common) are used interchangeably here.
 
  
  1041   Tuesday, December 17, 2024, 09:46 Dave Neilson     45235-26In progressSIS P2N source cup testingMonday, December 16, 2024, 3:34   Target
loaded in test stand. Confirmed correct connection
to mass marker power supply through multipin.
  
  1040   Tuesday, December 10, 2024, 14:38 Isaiah Rabuka          Tuesday,
December 10, 2024, 14:38 Depressurized ATTS
  
  1039   Friday, December 06, 2024, 16:03 Isaiah Rabuka          Friday, December
06, 2024, 16:03 Heated and cooled a sample
  
  1038   Thursday, December 05, 2024, 15:38 Dave Neilson LP-FEBIAD  44692-442972-10 FEBIAD developmentTuesday, December 02, 2024, 15:35 
  - Target loaded into the test stand
Thursday, December 03, 2024, 14:33
  
  1037   Thursday, December 05, 2024, 14:06 Isaiah Rabuka         Thursday, December 05, 2024, 14:05
Pressurized ATTS with argon, swapped out
samples, and repressurized and heated chamber.
  
  1036   Thursday, December 05, 2024, 11:08 Aaron Schmidt      Problems/SolutionsSwap RP1 & Inspection (ITS Pumps) Thursday, December 05, 2024, 11:04:
RP1 was struggling to pump down. RP SN: MY20055A02
removed. Tip seal replacement likely req'd.
 Media.jpgMedia_(2).jpgMedia_(1).jpgMedia_(3).jpgMedia_(4).jpg 
  1035   Wednesday, December 04, 2024, 15:43 Isaiah Rabuka          Wednesday,
December 04, 2024, 15:42 Depressurized the
  
  1034   Tuesday, December 03, 2024, 15:49 Isaiah Rabuka          Tuesday,
December 03, 2024, 15:48
  
  1033   Tuesday, December 03, 2024, 14:55 Dave Neilson      DonePower supply changed to CATHODE mode (-)Tuesday, December 03, 2024, 14:55  ANODE/CATHODE
power supply switched to cathode mode, NEGATIVE
  
  1032   Thursday, November 28, 2024, 13:47 Isaiah Rabuka         November 28, 2024 1:46PM
Checked in on sample in ATTS.
  
  1031   Thursday, November 28, 2024, 11:47 Isaiah Rabuka      In progressHeating Stage Pellet Testing and DevelopmentOpened the ATTS, placed what I will call
“Cast Alumina Sample #1” into
the ATTS and activated the roughing then
  
  1030   Tuesday, November 19, 2024, 14:25 Aaron Schmidt       Pump down empty chamber Tuesday, November 19, 2024, 14:25:
Roughing
  
  1029   Wednesday, November 13, 2024, 14:36 Aaron SchmidtUC#(47) - Not includedLP-SISITETM344691-845235-24In progressConditioning UC#47 (Assembly only)Gas line is attached. 
Wednesday, November 13, 2024, 14:18:
Roughing.
 UC#47_empty_conditioning_test_1_-_Failed.docxUC#47_empty_conditioning_test_2.docx 
  1028   Tuesday, November 05, 2024, 16:40 Brady BorrmannUC #24D (Assembly only)LP-IG-LIS   44972-5 / 42972-9In progressConditioning UC#24D Assembly42972-5 Base / 42972-9 Lid
  
  1027   Thursday, October 31, 2024, 13:53 Aaron Schmidt      In progressChamber empty & Fix IG6 Thursday, October 31, 2024, 13:53:
Roughing down empty chamber. U-Line installed.

Monday, November 04, 2024,
  
  1026   Tuesday, October 29, 2024, 18:25 Aaron SchmidtUC#46 (assembly only)LP-IG-LISITWTM4 42972-6 / 39956-1In progressConditioning UC#46 Assembly 42972-6 Base / 39956-1 Lid
Tuesday, October 29, 2024, 18:20:
Roughing. 
  
  1025   Wednesday, October 09, 2024, 13:29 Dave Neilson    44691-8 45235-26  Retainer tests - with mass marker targetWednesday, October 09, 2024, 11:28 
 Target loaded, remote power supply
added for mass marker, negative channel on
  