Attached end plate parasitic / symbiotic target & PEEK assembly bracket.
Friday, November 06, 2020, 12:24: Roughing.
Friday, November 06, 2020, 12:53: TP1B on.
Friday, November 06, 2020, 13:05: TP1A on.
Friday, November 06, 2020, 13:16: IG1 on.
Monday, November 09, 2020, 06:26: Vacuum @ 1.25e-06T.
Monday, November 09, 2020, 06:28: HS waterline opened. Vacuum ok @ 1.25e-06T.
Monday, November 09, 2020, 06:36: Power/sources on.
Monday, November 09, 2020, 06:39: Auto-ramping TGHT / TBHT to 350 / 150 A @ 4 A per min.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
23.96 |
5.15 |
TBHT |
23.78 |
8.02
|
COIL + EE |
23.67 |
2.39 |
TGHT |
23.77 |
6.19 |
Monday, November 09, 2020, 06:4: Optics on.
Monday, November 09, 2020, 08:10: IV4 open.
Monday, November 09, 2020, 08:15: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, November 09, 2020, 08:19: Wire & Mass scans @ 350 / 150 A. Ok.
Monday, November 09, 2020, 08:27: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Monday, November 09, 2020, 11:40: Mass & wire scans complete.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
25.27 |
7.12 |
TBHT |
24.88 |
9.73
|
COIL + EE |
24.65 |
3.26 |
TGHT |
24.88 |
7.05 |
Monday, November 09, 2020, 13:46: E-rig PS off.
Tuesday, November 10, 2020, 04:47: Auto-cooling @ 2A per min.
Tuesday, November 10, 2020, 06:21: HV @ 0 V.
Tuesday, November 10, 2020, 06:58: TBHT @ 0 A. TGHT @ 317 A. Auto-cooling @ 3A per min.
Tuesday, November 10, 2020, 09:06: IV4 Close. Sources off.
Tuesday, November 10, 2020, 09:07: IG1, power, & Turbo pumps off.
Tuesday, November 10, 2020, 10:15: Waterline purged. Venting. |