Message ID: 819     Entry time: Friday, November 06, 2020, 12:53
Author: Aaron Schmidt 
Target/No.#: Nb#9 
Source: LP-SIS 
Station: ITW 
Module: TM2 
Target Oven W.O#: 44508-2 
Heat Shield W.O#: 43515-4 
Status: In progress 
Subject: Conditioning Nb#9 w/ P/S Target & Bracket 

Attached end plate parasitic / symbiotic target & PEEK assembly bracket.

Friday, November 06, 2020, 12:24: Roughing.

Friday, November 06, 2020, 12:53: TP1B on.

Friday, November 06, 2020, 13:05: TP1A on. 

Friday, November 06, 2020, 13:16: IG1 on.


Monday, November 09, 2020, 06:26: Vacuum @ 1.25e-06T.

Monday, November 09, 2020, 06:28: HS waterline opened. Vacuum ok @ 1.25e-06T.

Monday, November 09, 2020, 06:36: Power/sources on.

Monday, November 09, 2020, 06:39: Auto-ramping TGHT / TBHT to 350 / 150 A @ 4 A per min.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 23.96 5.15
 TBHT 23.78

8.02

 COIL + EE 23.67 2.39
 TGHT 23.77 6.19

Monday, November 09, 2020, 06:4: Optics on.

Monday, November 09, 2020, 08:10: IV4 open.

Monday, November 09, 2020, 08:15: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Monday, November 09, 2020, 08:19: Wire & Mass scans @ 350 / 150 A. Ok.

Monday, November 09, 2020, 08:27: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Monday, November 09, 2020, 11:40: Mass & wire scans complete.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.27 7.12
 TBHT 24.88

9.73

 COIL + EE 24.65 3.26
 TGHT 24.88 7.05

Monday, November 09, 2020, 13:46: E-rig PS off.


Tuesday, November 10, 2020, 04:47: Auto-cooling @ 2A per min. 

Tuesday, November 10, 2020, 06:21: HV @ 0 V. 

Tuesday, November 10, 2020, 06:58: TBHT @ 0 A. TGHT @ 317 A. Auto-cooling @ 3A per min. 

Tuesday, November 10, 2020, 09:06: IV4 Close. Sources off.

Tuesday, November 10, 2020, 09:07: IG1, power, & Turbo pumps off.

Tuesday, November 10, 2020, 10:15: Waterline purged. Venting.

Attachment 1: Nb#9_Conditioning_with_P-S_Mods.docx  1.522 MB  Uploaded Monday, November 16, 2020, 14:42
Attachment 2: ITW-TM2-Nb#9-LP-SIS_Test_Stand.docx  860 kB  Uploaded Monday, November 16, 2020, 14:43
Attachment 3: ER-580-230-30kV-m7.txt  3 kB  Uploaded Monday, November 16, 2020, 14:43  | Show | Show all
Attachment 4: ER-580-230-30kV-m23.txt  3 kB  Uploaded Monday, November 16, 2020, 14:43  | Show | Show all
Attachment 5: ER-580-230-30kV-m39.txt  3 kB  Uploaded Monday, November 16, 2020, 14:43  | Show | Show all
Attachment 6: ER-580-230-30kV-m83.txt  3 kB  Uploaded Monday, November 16, 2020, 14:43  | Show | Show all
Attachment 7: ER-580-230-30kV-m133.txt  3 kB  Uploaded Monday, November 16, 2020, 14:43  | Show | Show all