Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 605     Entry time: Wednesday, September 20, 2017, 14:11
Author: Aaron Schmidt 
Target/No.#: Ta#54 
Source: HP-SIS 
Station: ITW 
Module: TM2 
Target Oven W.O#: 42218-10 
Heat Shield W.O#:  
Status: In progress 
Subject: Conditioning Ta#54 

Wednesday, September 20, 2017, 14:08: Roughing.

Wednesday, September 20, 2017, 14:28: Turbos on.

Wednesday, September 20, 2017, 14:33: Ion gauge on.

Wednesday, September 20, 2017, 14:39: RGA on.


Thursday, September 21, 2017, 08:43: Waterlines opened. No response on RGA. Vacuum ok @ 1.7e-07T

Thursday, September 21, 2017, 08:49: Power/sources on.

Thursday, September 21, 2017, 09:03: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .

Thursday, September 21, 2017, 09:04: IV4 Opened.

Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.1 3.85
 TBHT 25.4 3.04
 COIL + EE 24.9 4.94
 TGHT  25.1 5.59

Thursday, September 21, 2017, 09:08: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.


Friday, September 22, 2017, 13:42: Bias / EZL increased to 40 / 17.3 kV. Tune accordingly.

Mass scan ok

Friday, September 22, 2017, 14:33: Bias / EZL decreased to 30 / 13 kV. Tune accordingly.

Friday, September 22, 2017, 14:39: Auto-cooling @ 2A / min


Monday, September 25, 2017, 10:20: BIAS / EZL / EE @ 0 V.

Monday, September 25, 2017, 10:21:Power/sources off.

Monday, September 25, 2017, 10:32: RGA off. IV4 closed

Monday, September 25, 2017, 10:33: Ion gauge, turbos off.

Monday, September 25, 2017, 10:37: Waterlines purged.

Monday, September 25, 2017, 13:19: Venting.

Attachment 1: ER-580-200-30kV-m7.txt  3 kB  Uploaded Wednesday, September 27, 2017, 10:38  | Show | Show all
Attachment 2: ER-580-200-30kV-m38.txt  3 kB  Uploaded Wednesday, September 27, 2017, 10:38  | Show | Show all
Attachment 3: OMEGA_OM-DAQPRO-5300_27-Sep-17_09.18.45.dlp  1.054 MB  Uploaded Wednesday, September 27, 2017, 10:39
Attachment 4: Ta#54.docx  1.660 MB  Uploaded Wednesday, September 27, 2017, 10:39
Attachment 5: TS-2017-09-20-14-37.rga  3.519 MB  Uploaded Wednesday, September 27, 2017, 10:39
Attachment 6: ITW-TM2-Ta#54-HP-SIS_Test_Stand.docx  567 kB  Uploaded Friday, September 29, 2017, 15:45
ELOG V2.9.2-2455