Friday, September 30, 2016, 10:00: Roughing.
Friday, September 30, 2016, 10:01: Roughing stopped. RP1 failure. Breaker tripped.
Friday, September 30, 2016, 11:49: Roughing continued.
Friday, September 30, 2016, 12:37: Turbos started -AM
Monday, October 03, 2016, 09:00: RGA on.
Monday, October 03, 2016, 09:05: Waterline opened. No response on RGA. Vacuum stable @1.70E-7T.
Monday, October 03, 2016, 09:20: Power/Sources on. Gas sources opened/closed.
Monday, October 03, 2016, 09:39: Optics switched on. Monitor TMS:SX2
Monday, October 03, 2016, 09:47: Anode on @ 200 V
Monday, October 03, 2016, 09:49: Coil on @ 50A
Monday, October 03, 2016, 09:50: IV4 opened.
Monday, October 03, 2016, 09:58: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Monday, October 03, 2016, 10:08: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Monday, October 03, 2016, 10:12
Device
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.0 |
3.99 |
TBHT |
27.5 |
3.21 |
COIL + EE |
26.8 |
5.26 |
TGHT |
26.9 |
5.78 |
Monday, October 03, 2016, 11:09: TMS:SX2 Fixed. No optics or sources affected.
Monday, October 03, 2016, 11:38: BIAS @ 30 kV. (Was actually set to 20 kV before). Ramping progress ok.
Monday, October 03, 2016, 15:56: TGHT / TBHT @ 580 / 290 A. RGA restarted.
Wednesday, October 05, 2016, 08:29: Optics found to be tripped : TMS:OCT4 , TMS:Q4 ,TMS:OCT3 ,TMS:SX3 ,TMS:Q3 ,TMS:SX2. Restarted
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
35.3 |
3.99 |
TBHT |
29.9 |
3.14 |
COIL + EE |
28.8 |
5.07 |
TGHT |
30.8 |
5.72 |
Wednesday, October 05, 2016, 09:20: Wire scanners reset. Emittance rig not reading properly.
Wednesday, October 05, 2016, 09:22: Auto ramping TBHT to 300 A @ 2A per min.
Thursday, October 06, 2016, 15:58: Auto-cooling TGHT / TBHT @ 2A per min.
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
35.4 |
3.95 |
TBHT |
29.4 |
3.09 |
COIL + EE |
28.8 |
5.05 |
TGHT |
30.8 |
5.70 |
Friday, October 07, 2016, 08:12: Source off - AM
Tuesday, October 11, 2016, 08:28: Turbos off. RGA off -AM
Tuesday, October 11, 2016, 13:38: Venting -AM |