Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 7 of 7  Not logged in ELOG logo
  ID Date Authorup Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  74   Tuesday, May 30, 2017, 15:15 Laura LambertSiC#36HP-FEBIAD-CTL TM241369-10 ReadySiC#36 target description Tuesday, May 30, 2017, 15:12
See attachment for target
 SiC#36_Target_Description.JPG 
  75   Wednesday, May 31, 2017, 09:53 Laura LambertTa# 52LP-SIS TM442218-14 In progressTa#52 target description Wednesday, May 31, 2017, 09:51
Ta#52 LP-SIS target description:
  
  76   Monday, June 26, 2017, 13:36 Laura LambertTa #53HP-SIS TM242218-6 ReadyTa#53 target description Monday, June 26, 2017, 13:32
Ta#53 HP-SIS target description:
  
  78   Monday, August 21, 2017, 11:13 Laura LambertUCx#21LP-SIS  42218-15 ReadyUCx#21 Target Description Monday, August 21, 2017, 11:09
Attached please find
 target_description.JPG 
  79   Tuesday, September 26, 2017, 12:07 Laura LambertTa#54HP-SISITWTM242218-10 ReadyTa#54 target descriptionTuesday, September 26, 2017, 09:31
Ta#54 HP-SIS target description:
  
  80   Wednesday, September 27, 2017, 09:14 Laura LambertSiC#37HP-FEBIADITETM439530-10 ReadySiC#37 target description Wednesday, September 27, 2017, 09:13
See attachment for target description.

 
 Target_Description.JPG 
  81   Monday, April 16, 2018, 09:55 Laura LambertUCx#22LP-SIS  42218-13 ReadyUCx#22 Target Description Monday, April 16, 2018, 09:53
Attached please find the UCx#22 target
description.
 target_description.JPG 
  105   Tuesday, March 16, 2021, 17:05 Luca EgoritiITE-TM4-UC#32-P2N-SISHP-SISITETM4--In progressUO2 discs cuttingThis afternoon, Darwin prepared in the
hot lab fume hood the two UO2 slurries to
be cut into P2N target discs. Later, I took
 UC32-P2N_material_info.jpgFume_hood.jpg 
  88   Thursday, November 29, 2018, 14:23 Marla CervantesUCx#26LP-IG-LIS  42281-3 ReadyUCx#26 Target descriptionThursday, November 29, 2018, 14:20
Attached please find
 UCx_26-description.JPG 
  90   Monday, July 22, 2019, 16:33 Marla CervantesUCx#27LP-SIS  49044-9 ReadyUCx#27 Target Description Monday, July 22, 2019, 16:31
Attached please find
 UCx#27.JPG 
  93   Wednesday, October 02, 2019, 11:18 Marla CervantesUCx#28LP-SIS  44062-4 ReadyUCx #28 Target description Wednesday, October 02, 2019, 11:17
Attached please find
 UCx28-target_description.JPG 
  100   Thursday, June 04, 2020, 15:00 Marla CervantesC#1LP-SIS  43044-8 In progressTarget C#1 Description Thursday, June 04, 2020, 15:00
See attached picture
 C1-Description.PNG 
  101   Tuesday, September 29, 2020, 11:50 Marla CervantesC#2LP-SISITWTM244139-9 In progressTarget C#2 Description  Tuesday, September 29, 2020, 11:49
See attached picture
 C2-Description.JPG 
  118   Tuesday, June 21, 2022, 15:34 Matthew GareauSiC#42, SiC#43  TM2  Problems/SolutionsMultipin guide pin issues While removing the SiC#42 it became
apparent that the multipin guide pin had
become loose again and was not allowing the
  
  26   Wednesday, August 01, 2012, 09:37 Pierre BricaultITE-TM4-UO#3LP-FEBIADITETM4  Problems/SolutionsShort has developed while lowering the cathode heater On tuesday July we lower the cathode
heater to swap the anode-cathode bias. While
lowering the cathode heater a short on the
  
ELOG V2.9.2-2455