Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 8 of 8  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown Text Attachments
  4   Thursday, March 31, 2011, 15:38 John WongSiC#25HP-SISITETM438481-138307-?SpentITE-TM4-SiC#25-Hp-SIS Thu Mar 31 15:19:51 2011:  SiC#25
was made sometime in December of 2010. 
It is now in the target module and ready
 big_mass_scan.jpg 
  21   Thursday, May 24, 2012, 11:04 John WongSiC#27HP-SISITETM438817-339069-2SpentHP-SIS SiC27 target description Thursday, May 24, 2012, 10:34
SiC#27- HPSIS target description: 
Total SiC foils = 240 discs
 SiC#27_specification.png 
  96   Tuesday, November 19, 2019, 12:20 Darwin Ortiz RosalesUCx#30LP-SIS  44062-3  Ready UCx30-target_description    UCx#30.PNGUCx30-taret_description_revised.png 
  124   Tuesday, November 15, 2022, 08:41 Darwin Ortiz RosalesUCx#41LP-SIS  45220-13 Ready    UCx#41_Description.png 
  131   Friday, May 26, 2023, 11:53 Darwin Ortiz RosalesSiC#45HP-SIS  44692-3 Ready    SiC#45.png 
ELOG V2.9.2-2455