Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 8 of 8  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Datedown Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  9   Friday, June 17, 2011, 11:58 John WongUCx (flakes)LP-SIS    Problems/SolutionsMaking UC2 flakes (stock# 2011_A & _B)Fri Jun 17 10:28:47 2011
First batch of UO2/C mixture of carbonization
(Stock# 2011_A):   
 8x 
  8   Thursday, June 16, 2011, 17:26 John WongNbHP-SIS  38817-1 SpentTarget is ready and stored in cabinet  Thu Jun 16 17:21:10 2011
Two targets of Nb-HP-SIS are complete
and ready to be installed in the heat shields:
  
  7   Friday, June 03, 2011, 09:16 John WongTa#37LP-SISITWTM138634-536833-7SpentTarget is done Fri Jun  3 12:40:30 2011
Ta#37-LP-SIS (w.o#38634-5)
Filled with 400 Ta foils (25/pk),
 EE.JPGEE-CuO.jpg 
  4   Thursday, March 31, 2011, 15:38 John WongSiC#25HP-SISITETM438481-138307-?SpentITE-TM4-SiC#25-Hp-SIS Thu Mar 31 15:19:51 2011:  SiC#25
was made sometime in December of 2010. 
It is now in the target module and ready
 big_mass_scan.jpg 
  3   Tuesday, March 29, 2011, 14:14 John WongTa#35HP-SISITETM438481-338303-4SpentITE-TM4-Ta#35-Hp-SIS ITE-TM4-Ta#35-Hp-SIS
Thu Apr  7 15:32:32 2011:
Target oven - w.o#38481-3.
 Ta-HPSIS.jpg 
ELOG V2.9.2-2455