Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 8 of 8  Not logged in ELOG logo
Entry  Friday, June 17, 2011, 11:58, John Wong, UCx (flakes), LP-SIS, , , , , Problems/Solutions, Making UC2 flakes (stock# 2011_A & _B) 8x
Entry  Tuesday, March 29, 2011, 14:14, John Wong, Ta#35, HP-SIS, ITE, TM4, 38481-3, 38303-4, Spent, ITE-TM4-Ta#35-Hp-SIS  Ta-HPSIS.jpg
Entry  Thursday, March 31, 2011, 15:38, John Wong, SiC#25, HP-SIS, ITE, TM4, 38481-1, 38307-?, Spent, ITE-TM4-SiC#25-Hp-SIS  big_mass_scan.jpg
Entry  Thursday, May 24, 2012, 11:04, John Wong, SiC#27, HP-SIS, ITE, TM4, 38817-3, 39069-2, Spent, HP-SIS SiC27 target description SiC#27_specification.png
Entry  Friday, May 30, 2025, 14:23, Darwin Ortiz Rosales, C#5, LP-SIS, , , 45220-6, , Ready, C#5 conditioning C#5_Description.png
Entry  Tuesday, November 19, 2019, 12:20, Darwin Ortiz Rosales, UCx#30, LP-SIS, , , 44062-3 , , Ready, UCx30-target_description  UCx#30.PNGUCx30-taret_description_revised.png
Entry  Tuesday, November 15, 2022, 08:41, Darwin Ortiz Rosales, UCx#41, LP-SIS, , , 45220-13, , Ready,  UCx#41_Description.png
Entry  Friday, May 26, 2023, 11:53, Darwin Ortiz Rosales, SiC#45, HP-SIS, , , 44692-3, , Ready,  SiC#45.png
ELOG V2.9.2-2455