Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 8 of 8  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject
  9   Friday, June 17, 2011, 11:58 John WongUCx (flakes)LP-SIS    Problems/SolutionsMaking UC2 flakes (stock# 2011_A & _B)

Fri Jun 17 10:28:47 2011

First batch of UO2/C mixture of carbonization (Stock# 2011_A):   

UO2 used = 50.120g (left overs + container = 411.23g)

C(grv) used = 10.653g (or 21.25% w/w)

Mass of organics = 4.842g (or 9.66% w/w) 

Mass of dried cast = 47.420g 

Waste collected in jar = 18.195g (including UO2, C and Org) 

Waste accountable for UO2 = 12.57g

The carbonization process started from May 26 to June 4 (9 days).  

See attachment #1 and #2 for the striptools during the UO2/C carbonization

Total Mass UC2 flakes = 35.310g 


 Fri Jun 17 11:56:15 2011

Attempted to make the second batch of UO2/C mixture of carbonization on June 13, but it failed.  The milling jar gasket seal partially came out during the high speed milling.  As a result, the UO2/C mixture squirted out and contaminated the planetary mill (See attachment #3 & #4).  RPG and all other groups were informed.  The planetary mill and the lab were properly cleaned up (see attachment #5), no activities were found after the cleaning.  Attachments #6, #7, #8 are some of the discussion about the UO2 spill.  

All the UO2 taken out from the container (50.23g) is accountable for waste.  

 


 June 28, 2011 - Re-making 2nd batch of UO2/C mixture was successful.  

Stock#2011_B:

UO2 used = 50.29g

C(grv) used = 10.0g 

Mass of Organics = 4.84g 

Mass of Dried green = 71.96g (the cast was let dry over night <24hrs due to time restriction.  It might not be completely dried as a result of such heavy mass remained.  However, the UO2 waste was very minimum, <5.0g) 

Total Mass UC2 flakes = 56.853g 

 


 

 

 

 

 

  8   Thursday, June 16, 2011, 17:26 John WongNbHP-SIS  38817-1 SpentTarget is ready and stored in cabinet

 Thu Jun 16 17:21:10 2011

Two targets of Nb-HP-SIS are complete and ready to be installed in the heat shields:

-----------------------------------------------------------------------------------

Target oven w.o# 38817-1:

inner diameter: left = 18.27mm, right = 18.25mm.

Filled with 400 foils Nb (16pk, 5 foils/pk).  

Discs spec: 18.65mm/14.65mm, thickness = 0.022mm  

Total mass + Ta-wire = 22.74g

Total length = 4.5cm

Rn foil inserted for ionization.  (0.1mm, 0.004", 1cm x 1cm)  

 

------------------------------------------------------------------------------------

Wednesday, July 06, 2011, 14:35: Salts were added and tested in test-stand last 2 weeks.

 

  7   Friday, June 03, 2011, 09:16 John WongTa#37LP-SISITWTM138634-536833-7SpentTarget is done

 Fri Jun 3 12:40:30 2011

Ta#37-LP-SIS (w.o#38634-5)

Filled with 400 Ta foils (25/pk), 4.0 cm in length.  Total mass + Ta wire = 42.32g.  The heat shield was assembled and tested, and the standard salts were added.  Target was installed in the test stand on Jun 1, 2011.  

Fri Jun 17 09:19:46 2011: The following salts have been added: Li, Na, Rb @ 10uL, K @ 5uL, Cs @ 15uL, and Be @ 10uL.

Wednesday, July 06, 2011, 14:08:  TM1 is still under repairing.  It was tested at the test-stand. Target is on the shelve and ready to be used.

Tuesday, July 26, 2011, 15:58:  Salt added before going into the hotcell: Li,Na,Rb,K,Cs.  Target is ready to be used for TM1 test.

Wednesday, July 27, 2011, 10:48:  It was found that the extraction electrode had some arc marking on it (see attachment: EE).  Investigating... 

Wednesday, July 27, 2011, 12:51: After further investigation on the extraction electrode,  we found some black and blue(or green) deposit on the outside surface and inside of the EE.  This deposit is most likely copper oxide, which formed during the HV test.  The EE was removed, and wiped clean with methanol.  (see attachment: EE_CuO).  This target will be used in TM1. 

 

Friday, August 26, 2011, 09:48:  As per Friday Aug 26 TIS meeting, bNMR is very satisfied with the beam; the count rate is very stable.

 

  4   Thursday, March 31, 2011, 15:38 John WongSiC#25HP-SISITETM438481-138307-?SpentITE-TM4-SiC#25-Hp-SIS

Thu Mar 31 15:19:51 2011:  SiC#25 was made sometime in December of 2010.  It is now in the target module and ready to be conditioned. 

Mon Apr 18 18:17:05 2011: It was found later that no salt was added to this target after it came out from the test stand.  However,  there were enough 40Ca and 39K  for tuning (See attachment#1 for the big mass scan).  Once the P+ is back, the yields will be measured.

Fri Apr 29 15:30:26 2011:  Low 27Al was ionized from the surface for some reason.  However, after the green laser was shone into the extraction tube, more 27Al was produced.  Then, the laser was turned off, the target continued to surface ionizing 27Al.  There could be a blockage from the rhenium (Re) ionizer foil.  Jens L. will investigate this further and do a test with the lasers and the rhenium foil.

 

 


  3   Tuesday, March 29, 2011, 14:14 John WongTa#35HP-SISITETM438481-338303-4SpentITE-TM4-Ta#35-Hp-SIS

ITE-TM4-Ta#35-Hp-SIS

Thu Apr 7 15:32:32 2011:

Target oven - w.o#38481-3.

Packs of Ta foils were previously prepared by Vicky H.

Marik loaded the target:  400 of 0.025mm foils (25 foils/pk) in 3.5cm length.  (Recommended length 4.0-4.5cm; If too closely packed, wires get squeezed and snapped)

Average mass per discs = 0.105g

Total mass (Ta+wire) = 45.06g

Disc area = 2.12cm2

Ta thickness = 21.25g/cm2

Thu Apr 28 :

Target heat Shield (w.o 38303-4) cleaned

Target is now assembled by John and Rick

Megger Test Performed:

TA-->HS = 540V, OL

TA-->EE = 540V, OL 

HS--> EE = 1049V, OL

Leak Check OK

*SIS restraint used in this target ion source

Mon May 9 10:32:40 2011:  Standard salts added: Li, Na, Rb @ 10uL, K @ 5uL (but added 10uL), Cs @ 15uL.  Target will be going to the test stand.

Fri May 20 16:57:22 2011: 

Target was tested on the Test Stand but problems with the software (see Test stand elog). 

Standard salts added: Li, Na, Rb @ 10uL, K @ 5uL (but added 10uL), Cs @ 15uL, and Be @ 10uL.

Monday, July 18, 2011, 11:15:  Target ended on July 16.  The target was used online for an extra 2 weeks and performed very well. 

 

 

ELOG V2.9.2-2455