Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 7 of 8  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject Text Attachments
  9   Friday, June 17, 2011, 11:58 John WongUCx (flakes)LP-SIS    Problems/SolutionsMaking UC2 flakes (stock# 2011_A & _B)Fri Jun 17 10:28:47 2011
First batch of UO2/C mixture of carbonization
(Stock# 2011_A):   
 8x 
  16   Tuesday, September 27, 2011, 10:36 Anders MjosTaC#1LP-SISITETM138634-636833-6Problems/SolutionsMaterial deposited on Extraction Electrode after Test Stand

    

       
            
 Deposited_material.pdf 
  26   Wednesday, August 01, 2012, 09:37 Pierre BricaultITE-TM4-UO#3LP-FEBIADITETM4  Problems/SolutionsShort has developed while lowering the cathode heater On tuesday July we lower the cathode
heater to swap the anode-cathode bias. While
lowering the cathode heater a short on the
  
  118   Tuesday, June 21, 2022, 15:34 Matthew GareauSiC#42, SiC#43  TM2  Problems/SolutionsMultipin guide pin issues While removing the SiC#42 it became
apparent that the multipin guide pin had
become loose again and was not allowing the
  
  11   Wednesday, July 06, 2011, 14:29 John WongNb/SpareHP-SIS  38817-2 In progressTarget ready for AssemblyTarget oven w.o# 38817-2:
inner diameter: left = 18.29mm, right
= 18.16mm.
  
  72   Wednesday, March 08, 2017, 15:42 Laura LambertTa#51LP-SIS TM241790-4 In progressTa#51 target description Wednesday, March 08, 2017, 15:40
Ta#51 LP-SIS target description:
  
  75   Wednesday, May 31, 2017, 09:53 Laura LambertTa# 52LP-SIS TM442218-14 In progressTa#52 target description Wednesday, May 31, 2017, 09:51
Ta#52 LP-SIS target description:
  
  86   Friday, October 12, 2018, 17:14 John WongUCx#25LP-SIS    In progressUCx#25 Target DescriptionFriday, October 12, 2018, 17:11
See attachment for UCx#25 target
description.
 UCx#25_target_description.JPG 
  92   Tuesday, September 17, 2019, 08:47 Aaron SchmidtTa#59LP-SIS TM244062-5 In progressTa#59 Target descriptionTuesday, September 17, 2019, 08:44: 
T
 Ta#59_Loading_Data.pdf 
  100   Thursday, June 04, 2020, 15:00 Marla CervantesC#1LP-SIS  43044-8 In progressTarget C#1 Description Thursday, June 04, 2020, 15:00
See attached picture
 C1-Description.PNG 
  101   Tuesday, September 29, 2020, 11:50 Marla CervantesC#2LP-SISITWTM244139-9 In progressTarget C#2 Description  Tuesday, September 29, 2020, 11:49
See attached picture
 C2-Description.JPG 
  102   Tuesday, October 06, 2020, 14:25 Aaron SchmidtTa#61LP-SISITETM444508-1 In progressTa#61 Target Description Ta#61 LP-SIS target
description:
  
  105   Tuesday, March 16, 2021, 17:05 Luca EgoritiITE-TM4-UC#32-P2N-SISHP-SISITETM4--In progressUO2 discs cuttingThis afternoon, Darwin prepared in the
hot lab fume hood the two UO2 slurries to
be cut into P2N target discs. Later, I took
 UC32-P2N_material_info.jpgFume_hood.jpg 
  108   Wednesday, June 23, 2021, 18:13 Aaron SchmidtTa#62LP-SISITETM444691-4 In progressTa#62 Target Description (2) Ta#62 LP-SIS target
description: (REPLACEMENT FOR 44139-10)
  
  114   Wednesday, November 10, 2021, 18:09 Aaron SchmidtTa#63LP-SISITETM444691-11 In progressTa#63  Ta#63 LP-SIS target
description: 
 Ta#63_Target_Loading_Data.pdf 
  116   Thursday, June 02, 2022, 16:55 Aaron SchmidtTa#64LP-SISITETM444691-12 In progressTa#64 Target DescriptionThursday, June 02, 2022, 16:54: 
Ta#64 LP-SIS target
 Ta#64_Target_Loading_Data.pdf 
  135   Thursday, August 24, 2023, 14:16 Aaron SchmidtNb#11LP-IG-LISITWTM245447-9 In progressNb#11 Target descriptionNb#11 LP-IG-LIS target description:
 Nb#11_Target_Loading_Data.pdf 
  136   Wednesday, September 20, 2023, 14:25 Aaron SchmidtTa#66LP-SISITWTM245220-5 In progressTa#66 Target description.Ta#66 LP-SIS target description: 
 Ta#66_Target_Loading_Data.pdf 
  49   Wednesday, April 01, 2015, 11:27 Laura LambertTa # 45HP-SIS  38817-5 In UseTa#45 target description Wednesday, April 01, 2015, 11:25
Ta#45 HP-SIS target description:
  
  27   Wednesday, August 29, 2012, 14:52 John WongUCx#5LP-SISITWTM439165-5 FailedUCx#5 target description Wednesday, August 29, 2012, 14:50
UCx#5 target description, see attachment#1
The target is currently undergoing
 UCx#5_specifications.PNG 
ELOG V2.9.2-2455