Entry  Friday, June 17, 2011, 11:58, John Wong, UCx (flakes), LP-SIS, , , , , Problems/Solutions, Making UC2 flakes (stock# 2011_A & _B) 8x
Fri Jun 17 10:28:47 2011
First batch of UO2/C mixture of carbonization (Stock# 2011_A):   
UO2 used = 50.120g (left overs + container = 411.23g)
    Reply  Tuesday, September 27, 2011, 10:36, Anders Mjos, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, Problems/Solutions, Material deposited on Extraction Electrode after Test Stand Deposited_material.pdf


    
        
            John Wong wrote:
        
        
            
            Tuesday, September 06, 2011, 13:14: 
Entry  Wednesday, August 01, 2012, 09:37, Pierre Bricault, ITE-TM4-UO#3, LP-FEBIAD, ITE, TM4, , , Problems/Solutions, Short has developed while lowering the cathode heater 
 On tuesday July we lower the cathode heater to swap the anode-cathode bias. While lowering the cathode heater a short on the anode developed. 
The polarity swap was not possible because the target/tube assembly has also a short to common. 
We return the configuration has it was and we added two 100 Ohms: 5 W resistor between the common and the heaters to prevent current to flow back
Entry  Tuesday, June 21, 2022, 15:34, Matthew Gareau, SiC#42, SiC#43, , , TM2, , , Problems/Solutions, Multipin guide pin issues 
 While removing the SiC#42 it became apparent that the multipin guide pin had become loose again and was not allowing the target to dismount from
the module.
The multipin shoulder bolts were removed and then the multipin was able to be pried off.
Entry  Wednesday, July 06, 2011, 14:29, John Wong, Nb/Spare, HP-SIS, , , 38817-2, , In progress, Target ready for Assembly 
Target oven w.o# 38817-2:
inner diameter: left = 18.29mm, right = 18.16mm.
Filled with 400 foils Nb (16pk, 5 foils/pk).  
Entry  Wednesday, March 08, 2017, 15:42, Laura Lambert, Ta#51, LP-SIS, , TM2, 41790-4, , In progress, Ta#51 target description 
 Wednesday, March 08, 2017, 15:40
Ta#51 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Wednesday, May 31, 2017, 09:53, Laura Lambert, Ta# 52, LP-SIS, , TM4, 42218-14, , In progress, Ta#52 target description 
 Wednesday, May 31, 2017, 09:51
Ta#52 LP-SIS target description:
Total Ta foils = 400 [4x20 packs + 320 single discs]
Entry  Friday, October 12, 2018, 17:14, John Wong, UCx#25, LP-SIS, , , , , In progress, UCx#25 Target Description UCx#25_target_description.JPG
Friday, October 12, 2018, 17:11
See attachment for UCx#25 target description.

 
Entry  Tuesday, September 17, 2019, 08:47, Aaron Schmidt, Ta#59, LP-SIS, , TM2, 44062-5, , In progress, Ta#59 Target description Ta#59_Loading_Data.pdf
Tuesday, September 17, 2019, 08:44: 
Ta#59 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Thursday, June 04, 2020, 15:00, Marla Cervantes, C#1, LP-SIS, , , 43044-8, , In progress, Target C#1 Description C1-Description.PNG
 Thursday, June 04, 2020, 15:00
See attached picture for description 
Entry  Tuesday, September 29, 2020, 11:50, Marla Cervantes, C#2, LP-SIS, ITW, TM2, 44139-9, , In progress, Target C#2 Description  C2-Description.JPG
 Tuesday, September 29, 2020, 11:49
See attached picture for description 
Entry  Tuesday, October 06, 2020, 14:25, Aaron Schmidt, Ta#61, LP-SIS, ITE, TM4, 44508-1, , In progress, Ta#61 Target Description 
 Ta#61 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Tuesday, March 16, 2021, 17:05, Luca Egoriti, ITE-TM4-UC#32-P2N-SIS, HP-SIS, ITE, TM4, -, -, In progress, UO2 discs cutting UC32-P2N_material_info.jpgFume_hood.jpg
This afternoon, Darwin prepared in the hot lab fume hood the two UO2 slurries to be cut into P2N target discs. Later, I took over cutting both slurries.
A total of 49 annular discs were cut and loaded into the P2N graphite container.
The discs thickness was measured by stacking 5 discs on each other, and measuring their thickness in two points.
Entry  Wednesday, June 23, 2021, 18:13, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44691-4, , In progress, Ta#62 Target Description (2) 
 Ta#62 LP-SIS target description: (REPLACEMENT FOR 44139-10)
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Wednesday, November 10, 2021, 18:09, Aaron Schmidt, Ta#63, LP-SIS, ITE, TM4, 44691-11, , In progress, Ta#63 Ta#63_Target_Loading_Data.pdf
  Ta#63 LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Thursday, June 02, 2022, 16:55, Aaron Schmidt, Ta#64, LP-SIS, ITE, TM4, 44691-12, , In progress, Ta#64 Target Description Ta#64_Target_Loading_Data.pdf
Thursday, June 02, 2022, 16:54: 
Ta#64 LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Thursday, August 24, 2023, 14:16, Aaron Schmidt, Nb#11, LP-IG-LIS, ITW, TM2, 45447-9, , In progress, Nb#11 Target description Nb#11_Target_Loading_Data.pdf
Nb#11 LP-IG-LIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm (0.001")
Entry  Wednesday, September 20, 2023, 14:25, Aaron Schmidt, Ta#66, LP-SIS, ITW, TM2, 45220-5, , In progress, Ta#66 Target description. Ta#66_Target_Loading_Data.pdf
Ta#66 LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.033mm (0.0013") avg Measured. 
Entry  Wednesday, April 01, 2015, 11:27, Laura Lambert, Ta # 45, HP-SIS, , , 38817-5, , In Use, Ta#45 target description 
 Wednesday, April 01, 2015, 11:25
Ta#45 HP-SIS target description:
Total Ta foils = 400
Entry  Wednesday, August 29, 2012, 14:52, John Wong, UCx#5, LP-SIS, ITW, TM4, 39165-5, , Failed, UCx#5 target description  UCx#5_specifications.PNG
Wednesday, August 29, 2012, 14:50
UCx#5 target description, see attachment#1
The target is currently undergoing the final conditioning in the Evaporator #1. 