Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall, Page 18 of 18  Not logged in ELOG logo
  ID Date Author Category Type Specific Subjectup Text Attachments
  99   Friday, January 17, 2014, 15:41 Isaac EarleStandard OperationTarget 1TargetWater Purged from T1 & T2 TargetsWater was purged from the T1 and T2 targets
using compressed air.  The water is
stored in a labeled bucket on the BL1A blocks
  
  151   Wednesday, April 22, 2015, 09:46 Isaac EarleDevelopmentTarget 1TargetWater Sensors Installed on T1 Monolith Four water sensors have been installed
on top of the T1 monolith.  These water
sensors were wired and brought to the area
 T1_Water_Sensors.jpgIMG_4859.JPGIMG_4860.JPG 
  24   Tuesday, March 27, 2012, 13:14 Isaac EarleRepairTarget 1TargetWater removal from T1 monolithAll water was removed from the base of
the target hole in the T1 monolith using
a suction tube device and wypalls.  Video
 downstream.jpgsouth.jpgupstream.jpgM13.jpg 
  35   Wednesday, May 30, 2012, 15:39 Isaac EarleRepairTarget 1TargetWest Side Manipulator Removed from Hot Cell The west side manipulator was removed
from the hot cell using the new manipulator
removal frame.  The operation went smoothly
 IMG_0227.JPGIMG_0231.JPGIMG_0238.JPGIMG_0241.JPG 
  246   Thursday, November 01, 2018, 13:57 Keith C NgOtherOtherOthernuclear venillation in hot cells not workingRandomly checked on the nuclear ventilation
for the Meson Hall Hotcells and discovered
they were not running again (both magnahelic
  
  1   Wednesday, June 29, 2011, 15:27 John Wong   testblah blah blah....   
  227   Thursday, July 27, 2017, 09:34 Keith C NgDevelopmentOtherOthertest 2test 2   