Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-Meson Hall, Page 2 of 18
Not logged in
Back
|
Find
|
Select
|
Help
|
Login
Full
|
Summary
| Threaded |
Collapse
|
Expand
358 Entries
Goto page
Previous
1
, 2,
3
...
16
,
17
,
18
Next
All
Thursday, January 11, 2024, 15:10, Albert Kong, Maintenance, Other, Cooling, T1/T2 Cooling Pkg. Proteus Paddle Wheel Maintenance, CUNO Filter Replacement, and Fitting Inspection
Wednesday, January 10, 2024, 12:47, Albert Kong, Standard Operation, Target 1, Target, T1 target ladder exchange (T1-MK1 to hot cell roof, T1-MK2 from pit to station)
Wednesday, January 10, 2024, 12:25, Albert Kong, Standard Operation, Other, Cooling, T1/T2 cooling packages drained
Monday, December 04, 2023, 09:22, Albert Kong, Standard Operation, Target 2, Cooling, T2 TGT Low Flow
Tuesday, October 17, 2023, 14:25, Albert Kong, Maintenance, Other, Other, T1/T2 Air Amplifier Spool O-Ring Servicing
Tuesday, October 17, 2023, 10:16, Eric Lahe, Maintenance, Other, Active Sump, Testing the Remote Handling Lab Active Sump Level Sensor
Thursday, August 03, 2023, 10:33, Albert Kong, Repair, Target 2, Cooling, T2 Expansion Tank Water Level Low (Leak Identified)
7x
Tuesday, July 18, 2023, 09:14, Adam Newsome, Other, Target 1, Cooling, T1 Cooling Package: target flow (FGTGT) sensor noise issues
Tuesday, June 06, 2023, 15:42, Albert Kong, Standard Operation, Target 1, Cooling, T1 Heat Exchanger Low Flow Diagnostics
Thursday, May 11, 2023, 11:28, Adam Newsome, Repair, Target 1, Target, T1-MK1 - broken target ladder motor coupler repaired
Wednesday, May 03, 2023, 10:06, Adam Newsome, Maintenance, Other, Hot Cell, Meson Hall Hot Cell - Nuclear Ventilation HEPA Filter Changed, Operational
Thursday, April 06, 2023, 13:35, Albert Kong, Maintenance, Target 1, Controls, T1 Motor Controller Hearbeat Trip (+T2 Heartbeat Trip)
Thursday, March 30, 2023, 13:17, Albert Kong, Maintenance, Other, Target, Air Amplifier Testing: M9 BB (AKA T2 blocker), M20 BB, T2 MK1 prof. monitor, T1 MK1 prof. monitor actuation
Wednesday, March 15, 2023, 15:56, Albert Kong, Maintenance, Target 2, Controls, T2 - M9 and M20 beam blocker actuation and vacuum test
6x
Monday, March 06, 2023, 16:58, Albert Kong, Repair, Target 2, Cooling, M20 O-Ring Replacement and Valve Replacement Leak Check
Friday, March 03, 2023, 16:00, Albert Kong, Maintenance, Target 2, Other, M20 Return to T2 Monolith + Vaccum Leak / T1-T2 Valve Re-inspection
Thursday, March 02, 2023, 07:04, maicodallavalle, Maintenance, Target 2, Cooling, Refilled Expasion Tank
Thursday, March 02, 2023, 06:59, maicodallavalle, Maintenance, Target 1, Cooling, Refilled Expasion Tank
Wednesday, March 01, 2023, 13:10, Albert Kong, Maintenance, Other, Cooling, T1/T2 Water Cooling Package Heat Exchanger Ball Valve Replacement
Tuesday, February 21, 2023, 16:56, Albert Kong, Maintenance, Target 2, Other, M20 BB moved to meson hall hot cell roof
Goto page
Previous
1
, 2,
3
...
16
,
17
,
18
Next
All
ELOG V2.9.2-2455