  RH-Meson Hall, Page 19 of 19  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Category Type Specificdown Subject Text Attachments
  312   Monday, January 16, 2023, 15:06 Adam NewsomeRepairOtherActive SumpRH Active Sump - draining flow rate sensor repairThe flow rate sensor used to monitor the
drain rate from BL1A holding tank to active
sump, located in the active sump area, was
  
  313   Tuesday, January 17, 2023, 13:46 Adam NewsomeMaintenanceOtherActive SumpFilter Change: RH Active Sump and BL1A Holding Tank Drain OutputThe CUNO filters were changed 2023-01-17
for:

    BL1A Holding Tank drain
 PXL_20230117_195113855.MP.jpgPXL_20230117_195649596.jpg 
  314   Tuesday, January 17, 2023, 13:49 Adam NewsomeRepairOtherActive SumpActive Sump - Valve V6 LeakingIt was noticed today (2023-01-17) that
the valve V6, used in draining the BL1A Holding
Tank to the Active Sump, was leaky. This
  
  333   Tuesday, October 17, 2023, 10:16 Eric LaheMaintenanceOtherActive SumpTesting the Remote Handling Lab Active Sump Level SensorThe level sensor for the active sump in
the RH lab was tested.
The level sensor is working properly
  
  352   Thursday, August 22, 2024, 15:16 Adam NewsomeStandard OperationOtherActive SumpActive sump filled ~600L with grey water from RCR1 sump replacementDuring a replacement  of the RCR1 active
sump (mechanical services group), approximately
600L of non-active grey water was released
  
  354   Monday, September 09, 2024, 16:31 Albert KongStandard OperationOtherActive SumpActive Sump High Level Sensor TestingThe active sump high level sensor was tested
and correctly alarmed locally. However the
alarm in the MHESA RCR lab did not make any
  
  1   Wednesday, June 29, 2011, 15:27 John Wong   testblah blah blah....   