  52   Monday, July 23, 2012, 16:01 Isaac EarleDevelopmentTarget 1TargetTarget Flask Seismic Restraint Clamps Installed Installation of the seismic restraint
clamps has been completed for the MK1 and
MK2 target flasks in the Remote Handling
 IMG_0427.JPGIMG_0428.JPGIMG_0429.JPG 
  78   Friday, April 12, 2013, 17:33 Isaac EarleDevelopmentTarget 1CoolingT1 & T2 high-temp limit switch installation, wiring, and commissioning completeInstallation, wiring, and commissioning
of the high temperature limit switches for
the T1 and T2 cooling packages was completed
  
  81   Friday, April 19, 2013, 09:55 Isaac EarleDevelopmentTarget 1CoolingT1&T2 cooling package safety/standards compliance upgrade complete (SASP0120)Yesterday (April 18th) the T1 and T2 cooling
package PRV outlet lines were routed to the
active drain in the 1A tunnel.  All
  
  82   Tuesday, May 14, 2013, 13:26 Isaac EarleDevelopmentTarget 1TargetT1 & T2 Profile ScanThe T1 and T2 profile monitors were used
during today's development shift.  Target
ladder movement for T1 was done at the panel
  
  90   Wednesday, October 23, 2013, 15:30 Isaac EarleDevelopmentTarget 1CoolingT1 & T2 High Temp Safety Switch Tested An end-to-end test was performed
on the new T1 and T2 high temperature safety
switches yesterday during the maintenance
  
  107   Tuesday, March 25, 2014, 18:24 Isaac EarleDevelopmentTarget 2Water LeakWater Detecting Sensor Install at T1 & T2Water detecting strips were installed around
the T1 and T2 areas today with Doug Preddy
and contractors from SMT Research.  Four
 9x 
  116   Wednesday, May 14, 2014, 20:36 Grant MinorDevelopmentTarget 2TargetTarget exercised to position 0, then back to 2.0 mm above position 4The T2 target was exercised to position
0 around 6:15pm so that the T2 profile monitor
could be used by operations.  The T2
  
  126   Monday, November 17, 2014, 10:14 Isaac EarleDevelopmentTarget 1Active SumpFilter Installed Downstream of RH HC Lab Active SumpA filter housing and filter were installed
by Dan McDonald on November 14 in the piping
section between the Remote Handling Hot Cell
 IMG_4273.JPG 
  143   Friday, February 27, 2015, 18:06 Isaac EarleDevelopmentTarget 1TargetT1 Rotary Collimator Water and Air Line Investigation Ron Kuramoto, Keith Ng, John McKinnon,
and myself spent some time today investigating
water and air lines related to the T1 Rotary
  
  147   Thursday, April 09, 2015, 13:56 Isaac EarleDevelopmentTarget 2TargetT2-MK2 target wired for version identification, cable ties replaced, ready for useThe "POT/CAM" MS connector on
the T2-MK2 has been wired to allow automatic
target version number identification by the
  
  151   Wednesday, April 22, 2015, 09:46 Isaac EarleDevelopmentTarget 1TargetWater Sensors Installed on T1 Monolith Four water sensors have been installed
on top of the T1 monolith.  These water
sensors were wired and brought to the area
 T1_Water_Sensors.jpgIMG_4859.JPGIMG_4860.JPG 
  153   Wednesday, April 22, 2015, 15:17 Isaac EarleDevelopmentTarget 1TargetT1-MK2 wired for version identification The T1-MK2 target was wired for automatic
target version detection by the new PLC control
system (A to C jumper  in POT/CAM MS
  
  154   Thursday, April 23, 2015, 13:40 Isaac EarleDevelopmentTarget 2OtherT2 Protect Monitor Elevation Adjustment- T2 Protect Monitor moved from the beam
line to the hot cell on Monday April 20th
- Elevation of the plate center measured
 Old_T2_Protect_Monitor_(removed_Apr_22_2015)_-_Entry_Side.jpgOld_T2_Protect_Monitor_(removed_Apr_22_2015)_-_Exit_Side.jpg 
  157   Tuesday, April 28, 2015, 15:55 Isaac EarleDevelopmentTarget 1TargetTarget Version Jumper Wires Installed for T1-MK1 and T2-MK1 The T1-MK1 and T2-MK1 targets have
been re-wired to allow version identification.
 Work was performed in the target storage
  
  162   Thursday, June 11, 2015, 16:59 Isaac EarleDevelopmentOtherControlsLab Test of New T1/T2 Level SensorsThe new T1/T2 level sensors (Omega LVCN414)
were tested in the RH HC lab today using
the Omega software on a laptop and positioning
  
  163   Friday, June 19, 2015, 17:11 Isaac EarleDevelopmentOtherControlsPLC Test of Ultrasonic Level SensorThe new T1/T2 level sensors
(Omega LVCN414) were hooked up to the PLC
 Overnight_Level_Sensor_PLC_Test.jpg 
  165   Wednesday, July 08, 2015, 16:21 Isaac EarleDevelopmentTarget 1Target0.003" 347 SS Sheet for T1/T2 Targets Received A 5lb roll of 347SS sheet was received
today.  This alloy is to be used for
the target windows of the new T1 and T2 beryllium
 347SS_Mill_Spec_Test_Report_-_July_8_2015.pdf 
  166   Thursday, July 09, 2015, 13:51 Isaac EarleDevelopmentOtherTargetNew T1 and T2 Beryllium Targets OrderedAn order for new T1 and T2  beryllium
targets was submitted to the TRIUMF machine
shop today.  A total of seven T2 targets
  
  168   Friday, July 17, 2015, 10:14 Isaac EarleDevelopmentTarget 1TargetT1/T2 Be Target Failure History & Replacement PlanT1 and T2 beryllium target failure history
was investigated back to 2000 (as far as
XSTRIP records were readily available).  For
 T1_and_T2_Be_Target_History_-_July_17_2015.pdf 
  169   Thursday, August 13, 2015, 09:47 Isaac EarleDevelopmentOtherOther"Clamp A" disassembled and used to build clamp "TRH1257-#01"The 4" Marman flange clamp (IRH0001)
labeled "Clamp A",  as used
in the testing detailed in Document-114623
  