Message ID: 259     Entry time: Wednesday, March 04, 2020, 13:42
Author: Ron Kuramoto 
Category: Repair 
Type: Other 
Specific: Other 
Subject: B/L 1A vacuum air leak repair 

 A 4” Marmon aluminum blank-off flange and o-ring were replaced on the south port of the T1 target monolith vacuum vessel. This port was accessed from the 1A Service Tunnel were the repair took place.

See the attached pdf file “1AT1 Vacuum Leak Repair-Feb2020” for a summary of the repair.

Attachment 1: 1AT1_Vacuum_Leak_Repair-Feb2020.pdf  1.047 MB  | Hide | Hide all