ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  1217   Thursday, April 28, 2016, 06:28 David WangConditioning StationMaintenanceTM2 TCS water system are turned off. TCS water system worked fine overnight.
I turned off TCS water system at 6:16 AM
this morning. Start of purging TM2 water
  
  1218   Friday, April 29, 2016, 08:01 David WangConditioning StationMaintenanceTM2 TM2 leak check at TCS, helium pressure testAnders and I finished the most part of
TM2 water lines helium pressure test yesterday.I
list the system parameters and test result
  
  1219   Friday, April 29, 2016, 10:06 David WangConditioning StationStandard OperationTM2 I switched off TCS and TM2 vacuum pumps.  I switched off TCS and TM2 vacuum
pumps. The TM2 will be disconnected at TCS
today and moved to silo on next Monday.
  
  1221   Wednesday, May 04, 2016, 11:14 Isaac EarleNorth Hot-CellDevelopment  North Hot Cell Scope DecisionA meeting was held on May 4, 2016 to determine
the scope of the North Hot Cell project.
 The following was agreed upon by those
  
  1222   Wednesday, May 04, 2016, 12:01 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep)Update schedule weekly. See attachment
1,2,3.
 Target_Hall_shedule_130_Apr_to_Sep_2016.pdfTarget_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf 
  1223   Monday, May 09, 2016, 08:43 David WangConditioning StationRepairTM3 I reinstalled all the side panel on TM3 service cap.They were moved for TM3 inspection job
last week. All the bolts on the panel are
hand tight only now since they will be removed
  
  1226   Tuesday, May 10, 2016, 13:54 David WangSouth Hot-CellStandard OperationTM2 SHC, TM2 leak check on window line and HS line.Chad and I leak checked the TM2 HS and
window lines after new target installation. 
The window line was very easy pumped down
  
  1229   Wednesday, May 11, 2016, 13:15 David WangConditioning StationMaintenanceTM2 TCS tank top flange seal is changed this morningI changed TCS tank top flange seal(o-ring
42.00"ID X 0.275" DIA) this morning
before TM2 was moved to TCS.
  
  1230   Wednesday, May 11, 2016, 13:16 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected.TM2 and TCS vacuum system has been connected.
I started all turbo pumps. Everything is
good so far.
  
  1231   Friday, May 13, 2016, 10:08 David WangConditioning StationStandard OperationTM2 Helium pressure test on TM2 HS and window line at CS with new Lp Ta targetThese two lines are passed helium pressure
test this morning. The LD base leak rate
0.0 X E-9 atm.cc/sec. The base pressure 0.0
  
  1232   Friday, May 13, 2016, 10:12 David WangConditioning StationStandard OperationTM2 TM2 water lines, heaters, EE, and EL are connected at TCS.The HV  cover is installed on to TM2
after the connections. The HV key is returned
back to B2 level. The TCS Faraday cage is
  
  1233   Monday, May 16, 2016, 10:48 Anders MjosConditioning StationMaintenance  Topped up water in TCS:TK2 Filled from 15 to 25 in   
  1234   Monday, May 16, 2016, 11:16 David WangITWStandard OperationTM1 ITW, TM1 turbo-pumps are swithched offI let isac opp switched off ITW turbo-pumps.
The argon vent valve in electrical room is
opened. The ITW argon venting will be started 
  
  1243   Tuesday, May 24, 2016, 10:42 David WangConditioning StationStandard OperationTM2 Target Hall schedule for beam schedule 130 (Apr- Sep)Weekly update the TH schedules. See attachments
1, 2,3.
 Target_Hall_shedule_130_Apr_to_Sep_2016.xlsxTarget_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf 
  1249   Thursday, June 02, 2016, 11:59 David WangSouth Hot-CellRepairTM3 5K mega test on TM3I did a 5KV mega test on TM3.  Only5Mohm
@5kV between coli line PQ and chassis(ground).
It confirmed the close gap between P,Q and
 5K_mega_check_on_TM3.pdf 
  1250   Thursday, June 02, 2016, 18:04 Aurelia LaxdalSouth Hot-CellRepairTM3 5K mega test on TM3

    

       
            
 DSC_0821.JPGDSC_0822.JPG 
  1252   Friday, June 03, 2016, 16:04 Aurelia LaxdalSouth Hot-CellRepairTM3 5K mega test on TM3

    

       
            
  
  1262   Thursday, June 09, 2016, 10:04 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep)Weekly update .  Target_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf 
  1265   Tuesday, June 14, 2016, 11:20 David WangITEStandard OperationTM4 TM4 has been connected in ITETM4 and ITE are under roughing now.   
  1267   Tuesday, June 21, 2016, 13:47 Travis Cave/ Dan McDonaldSpent Target VaultRepair  Spent Target Vault DoorThe spent target vault door does not open
or close. The emergency door closing did
have to be used to close the door as it was
  