2200
|
Monday, March 15, 2021, 13:01 |
Isaac Earle | Crane | Development | | | Plate & pin lift assembly load testing (ITA6550) | In mid-2020 design analysis was completed
on the steel plate & pin assemblies (ITA6550)
used to connect the ISAC target hall crane |
11x |
2206
|
Friday, March 26, 2021, 12:22 |
Adam Newsome | Crane | Development | | | Aux Hoist Pendant Upgrade | The crane pendant for the auxiliary hoist
was upgraded to a FLEX EX2 style pendant
by Canco Cranes. The installation work was |
|
2272
|
Monday, November 22, 2021, 12:44 |
Adam Newsome | Crane | Repair | | | Crane PLC Fault: 0004h | An issue was observed in which the target
hall crane was not functioning: the N-E-S-W
and up/down motions did not work, however |
|
2294
|
Wednesday, January 19, 2022, 13:26 |
David Wang | Crane | Standard Operation | | | Inpection of Target module lifting frames ITA0494-1997-01 and ITA0494-1997-02. | Tom Gauss inspected two target module
lifting frames ITA0494-1997-01 and ITA0494-1997-02..
He certified the use of these two frames. |
|
2295
|
Wednesday, January 19, 2022, 13:36 |
David Wang | Crane | Standard Operation | | | Targe hall crane below hook attachment pins and plates annual inspection. | Tom Kauss inspected target hall crane below
hook attachment pins and plates ITA6550-01.
He certified the use of these pins and plates. |
|
2301
|
Wednesday, February 02, 2022, 11:05 |
David Wang | Crane | Standard Operation | | | Target hall overhand crane annual insepection. | Tom Kauss finished target hall overhead
crane annual inspection today. The crane
works fine. He issued new inspection tag |
|
2399
|
Friday, December 16, 2022, 16:39 |
Adam Newsome | Crane | Standard Operation | | | Crane powered off for holidays | [edit 2023-01-03] The crane was powered
back on this morning - there do not appear
to be any faults and it seems that the crane |
|
2411
|
Friday, January 27, 2023, 07:11 |
David Wang | Crane | Standard Operation | | | Target hall Crane annual inspection has beend done. | Tom Kauss inspected target hall crane yesterday.
The crane works fine. Tom has this inspection
record in his file. The inspection tag has |
|
2412
|
Friday, January 27, 2023, 07:15 |
David Wang | Crane | Standard Operation | | | Target hall Crane annual inspection has beend done. | Tom Kauss finished TH crane annual
inspection yesterday. The crane woks fine.
Tom has this inspection record in his file. |
|
2413
|
Friday, January 27, 2023, 07:18 |
David Wang | Crane | Standard Operation | | | Inspection of target module lifing frame ITA0494-1997-01 and ITA0494-1997-02 | Tom Gauss inspected two target module
lifting frames ITA0494-1997-01 and ITA0494-1997-02
yesterday. He certified the use of these |
|
2414
|
Friday, January 27, 2023, 07:25 |
David Wang | Crane | Standard Operation | | | Inspection of TH crane below hook attachment pins and plates ITA6550-01 | Tom Kauss inspected target hall crane below
hook attachment pins and plates ITA6550-01
yesterday. He certified the use of these |
|
2436
|
Wednesday, May 03, 2023, 11:04 |
Adam Newsome | Crane | Maintenance | | | Pail Handling Tool - Annual Inspection | The pail handling tool which is used to
move 5 gallon pails around the target hall
was inspected by A. Newsome, N. Jorgenson, |
|
2470
|
Tuesday, August 01, 2023, 09:06 |
Adam Newsome | Crane | Development | | | Measuring Tape and Camera Removed from Target Hall Crane | In an effort to clean up the camera installation
on top of the ISAC target hall crane to resolve
a fault, the position measuring tape and |
|
2471
|
Thursday, August 03, 2023, 12:24 |
Jason Zhang | Crane | Development | | | Cleanup of camera installation on target hall crane, installation of replacement laser | The cleanup of
the ISAC Target Hall crane and installation |
|
2505
|
Thursday, November 23, 2023, 11:15 |
Adam Newsome | Crane | Repair | | | Target Hall Crane: CW/CCW rotation mechanism failure [tripped breaker] | It is reported that the crane's hook rotation
is not working currently. It was working
yesterday (Nov 22). Investigation to follow, |
|
2530
|
Thursday, January 25, 2024, 07:24 |
David Wang | Crane | Standard Operation | | | targe hall annual crane inspection | Tom Kauss finished TH crane annual inspection
yesterday. The crane woks fine. Tom has
this inspection record in his file. The crane |
|
2531
|
Thursday, January 25, 2024, 07:27 |
David Wang | Crane | Standard Operation | | | Inspection of target module lifting frames ITA0494-1997-01 and ITA0494-1997-02 | Tom Gauss inspected two target module
lifting frames ITA0494-1997-01 and ITA0494-1997-02
yesterday. He certified the use of these |
|
2532
|
Thursday, January 25, 2024, 07:31 |
David Wang | Crane | Standard Operation | | | Inspection oftareg hall crane below hook attachment pins and plates ITA6550-01 | Tom Kauss inspected target hall crane below
hook attachment pins and plates ITA6550-01
yesterday. He certified the use of these |
|
2618
|
Tuesday, June 18, 2024, 15:16 |
Adam Newsome | Crane | Maintenance | | | Pail Handling Tool - Annual Inspection | The pail handling tool which is used to
move 5 gallon pails around the target hall
was inspected by A. Newsome. The main tool |
|
2673
|
Thursday, September 05, 2024, 12:50 |
Adam Newsome | Crane | Maintenance | | | Overhead crane: up/down hoist delayed start issue | D. Wang reports that recently the overhead
crane has been exhibiting a delayed start
(approx. 1 min) when operating in local mode. |
|