  2200   Monday, March 15, 2021, 13:01 Isaac EarleCraneDevelopment  Plate & pin lift assembly load testing (ITA6550)In mid-2020 design analysis was completed
on the steel plate & pin assemblies (ITA6550)
used to connect the ISAC target hall crane
 11x 
  2206   Friday, March 26, 2021, 12:22 Adam NewsomeCraneDevelopment  Aux Hoist Pendant UpgradeThe crane pendant for the auxiliary hoist
was upgraded to a FLEX EX2 style  pendant
by Canco Cranes. The installation work was
  
  2272   Monday, November 22, 2021, 12:44 Adam NewsomeCraneRepair  Crane PLC Fault: 0004hAn issue was observed in which the target
hall crane was not functioning: the N-E-S-W
and up/down motions did not work, however
 Fault_code_when_connecting_Nov_22_2021.png 
  2294   Wednesday, January 19, 2022, 13:26 David WangCraneStandard Operation  Inpection of Target module lifting frames ITA0494-1997-01 and ITA0494-1997-02. Tom Gauss inspected  two target module
lifting frames ITA0494-1997-01 and ITA0494-1997-02..
He certified the use of these two frames.
 2022-01-19_170.jpg2022-01-19_173.jpg2022-01-19_175.jpg2022-01-19_176.jpg 
  2295   Wednesday, January 19, 2022, 13:36 David WangCraneStandard Operation  Targe hall crane below hook attachment pins and plates annual inspection. Tom Kauss inspected target hall crane below
hook attachment pins and plates ITA6550-01.
He certified the use of these pins and plates.
 2022-01-19_174.jpg2022-01-19_172.jpg 
  2301   Wednesday, February 02, 2022, 11:05 David WangCraneStandard Operation  Target hall overhand crane annual insepection. Tom Kauss finished target hall overhead
crane annual inspection today. The crane
works fine. He issued new inspection tag
  
  2399   Friday, December 16, 2022, 16:39 Adam NewsomeCraneStandard Operation  Crane powered off for holidays[edit 2023-01-03] The crane was powered
back on this morning - there do  not appear
to be any faults and it seems that the crane
  
  2411   Friday, January 27, 2023, 07:11 David WangCraneStandard Operation  Target hall Crane annual inspection has beend done.Tom Kauss inspected target hall crane yesterday.
The crane works fine. Tom has this inspection
record in his file. The inspection tag has
  
  2412   Friday, January 27, 2023, 07:15 David WangCraneStandard Operation  Target hall Crane annual inspection has beend done.Tom Kauss  finished TH crane annual
inspection yesterday. The crane woks fine.
Tom has this inspection record in his file.
  
  2413   Friday, January 27, 2023, 07:18 David WangCraneStandard Operation  Inspection of target module lifing frame ITA0494-1997-01 and ITA0494-1997-02Tom Gauss inspected  two target module
lifting frames ITA0494-1997-01  and ITA0494-1997-02
yesterday. He certified the use of these
  
  2414   Friday, January 27, 2023, 07:25 David WangCraneStandard Operation  Inspection of TH crane below hook attachment pins and plates ITA6550-01Tom Kauss inspected target hall crane below
hook attachment pins and  plates ITA6550-01
yesterday. He certified the use of these
  
  2436   Wednesday, May 03, 2023, 11:04 Adam NewsomeCraneMaintenance  Pail Handling Tool - Annual InspectionThe pail handling tool which is used to
move 5 gallon pails around the target hall
was inspected by A. Newsome, N. Jorgenson,
 PXL_20230503_172503014.jpgPXL_20230503_172457837.jpgPXL_20230503_172454009.jpg 
  2470   Tuesday, August 01, 2023, 09:06 Adam NewsomeCraneDevelopment  Measuring Tape and Camera Removed from Target Hall CraneIn an effort to clean up the camera installation
on top of the ISAC target hall crane to resolve
a fault, the position measuring tape and
  
  2471   Thursday, August 03, 2023, 12:24 Jason ZhangCraneDevelopment  Cleanup of camera installation on target hall crane, installation of replacement laser The cleanup of
the ISAC Target Hall crane and installation
 LaserProgramCalibrationLocation.pngSICK_Laser_Upgrade_Calibration.xlsxInstallation_IMG.png 
  2505   Thursday, November 23, 2023, 11:15 Adam NewsomeCraneRepair  Target Hall Crane: CW/CCW rotation mechanism failure [tripped breaker]It is reported that the crane's hook rotation
is not working currently. It was working
yesterday (Nov 22). Investigation to follow,
  
  2530   Thursday, January 25, 2024, 07:24 David WangCraneStandard Operation  targe hall annual crane inspectionTom Kauss finished TH crane annual inspection
yesterday. The crane woks fine. Tom  has
this inspection record in his file. The crane
  
  2531   Thursday, January 25, 2024, 07:27 David WangCraneStandard Operation  Inspection of target module lifting frames ITA0494-1997-01 and ITA0494-1997-02Tom Gauss inspected  two target module
lifting frames ITA0494-1997-01   and ITA0494-1997-02
yesterday. He certified the use of these
  
  2532   Thursday, January 25, 2024, 07:31 David WangCraneStandard Operation  Inspection oftareg hall crane below hook attachment pins and plates ITA6550-01Tom Kauss inspected target hall crane below
hook attachment pins and   plates ITA6550-01
yesterday. He certified the use of these
  
  2618   Tuesday, June 18, 2024, 15:16 Adam NewsomeCraneMaintenance  Pail Handling Tool - Annual InspectionThe pail handling tool which is used to
move 5 gallon pails around  the target hall
was inspected by A. Newsome.  The main tool
 PXL_20240618_213742257.jpgPXL_20240618_213455575.jpgPXL_20240618_213626154.jpg 
  2673   Thursday, September 05, 2024, 12:50 Adam NewsomeCraneMaintenance  Overhead crane: up/down hoist delayed start issueD. Wang reports that recently the overhead
crane has been exhibiting a delayed start
(approx. 1 min) when operating in local mode.
  