65
|
Wednesday, January 04, 2012, 13:49 |
Travis Cave | Spent Target Vault | Standard Operation | | | Moving the spent targets to mini storage. | Well the first of this year's lucky winners
to win a fabulous one way trip to Chalk River
are as follows. UC#1, UC#2, Ta#25, Ta#26, |
|
|
66
|
Thursday, January 05, 2012, 11:40 |
Travis Cave | Spent Target Vault | Standard Operation | | | Target swapping | Looks like the UC target s #1 and #2 were
found invalidprize winners for their all
inclusive trip to Chalk River and have thus |
|
|
68
|
Tuesday, January 10, 2012, 11:51 |
Grant Minor | Conditioning Station | Repair | | | IMC at Cond. Station is VENTED - DO NOT PUT MODULE IN | Hi Remote Handling,
The guage on the IMC circuit in the
Target Hall is reading atmosphere, and the |
|
|
69
|
Thursday, January 12, 2012, 08:43 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent targets to F-308s | All targets in the mini storage have been
moved to F-308s and those flasks have been
moved over to rad waste. The transfer of |
|
|
71
|
Monday, January 16, 2012, 09:30 |
David Wang | ITE | Maintenance | | | Changed all old inducion coils for flow sensors in ITE | I had changed all old induction coils for
flow sensors in ITE .I checked all ITE water
signals on control boards in electrical room.They |
|
|
79
|
Monday, April 02, 2012, 08:17 |
David Wang | Conditioning Station | Development | | | conditioning station IMC pump down. | I pumped down conditioning station IMC
today. The inside bellow pressure is -20
psi on the gauge.Visually checked the bellow |
|
|
80
|
Tuesday, April 03, 2012, 12:11 |
David Wang | Conditioning Station | Development | | | leak check on conditioning station vacuum system | I did a leak check on conditioning station
vacuum system today.The vacuum system had
been roughed over night . This morning before |
|
|
103
|
Wednesday, May 16, 2012, 10:35 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#26 | Spent target move | SiC #26 was moved from the south hot cell
into storage today. The target was is in
pail # 94 and was placed in slot 1B in the |
|
|
113
|
Friday, May 25, 2012, 10:48 |
Travis Cave | Spent Target Vault | Standard Operation | | | Moving the spent targets to mini storage. | Five targets were moved to the mini storage
today in preparation for transfer of the
targets to the F308s later next week. The |
|
|
114
|
Monday, May 28, 2012, 13:05 |
David Wang | ITE | Standard Operation | | | I moved 5 shielding blocks from ITW to ITE . | 5 shielding blocks have been transferred
from ITW to ITE. ITE ventilation is
opened, and ITW closed. All ITE water |
|
|
124
|
Monday, June 11, 2012, 10:52 |
Travis Cave | Spent Target Vault | Standard Operation | | Nb#6 | Spent target move | The Nb#6 target has been moved from the
south hot cell into storage. It was place
in pail #95 and is in slot 5C of the vault. |
|
|
134
|
Monday, June 25, 2012, 14:39 |
David Wang | ITW | Standard Operation | | | I moved 5 shielding blocks from ITE to ITW, | and set up ventilation for ITW. ITW is
ready for taking proton beam now. All water
interlock checks for ITW are done. The ITW |
|
|
142
|
Friday, July 06, 2012, 11:34 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#27 | Spent target move | SiC#27 has been moved from the south hot
cell to the spent target vault. Target was
placed in pail #96, placed in slot 3A, the |
|
|
146
|
Friday, July 13, 2012, 16:33 |
Bevan Moss | Crane | Repair | | | Crane has stopped working | In the AM today David and I used the crane
to raise the ground plate sheet metal into
place. This afternoon when I attempted to |
|
|
147
|
Monday, July 16, 2012, 11:55 |
Bevan Moss | Crane | Repair | | | Crane has stopped working |
|
|
|
148
|
Wednesday, July 18, 2012, 16:49 |
Grant Minor | South Hot-Cell | Development | | | South Hot Cell Ventilation Alarm Trip | Today (Wednesday July 18th) at around 4:15
pm I was taking a small tour group from
VECC into the Target Hall. In the process |
|
|
149
|
Wednesday, July 18, 2012, 16:49 |
Grant Minor | South Hot-Cell | Development | | | South Hot Cell Ventilation Alarm Trip | Today (Wednesday July 18th) at around 4:15
pm I was taking a small tour group from
VECC into the Target Hall. In the process |
|
|
158
|
Thursday, August 02, 2012, 11:48 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#38 | Spent target move | Ta#38 was moved from the south Hot Cell
to the Spent Target Vault. Target is in pail
#97, and was placed into tray 6 slot B of |
|
|
159
|
Tuesday, August 07, 2012, 14:06 |
David Wang | ITW | Repair | | | ITW TP4S has been replaced |
Normal
0
|
|
|
164
|
Thursday, August 23, 2012, 07:34 |
David Wang | ITW | Repair | | | Replaced broken air lines on ITW HARP5B cylinder. | Prob guys replaced broken air lines on
ITW HARP 5B Cylinder.Several shielding blocks
had been moved out to make the cylinder accessible. |
|