Entry  Tuesday, May 21, 2013, 11:52, Bevan Moss, Conditioning Station, Standard Operation, TM3, No Source Tray, May 16th Long HV conditioning 16052013_TM3_long_HV_conditioning.xlsx
On May 16th 2013 the module was HV conditioned all day. As a result the maximum stable voltage has been increased to about 47kV (~4kV more than last
test). A maximum voltage of 49kV was achieved but the module was very unstable. Attached is the data from the testing. Note that occasionally the sparking
caused the PS to reset, it was turned back on and the voltage increased back to what it was (or lower) quickly.
Entry  Monday, November 27, 2023, 12:01, chad fisher, South Hot-Cell, Maintenance, , , Manipulator tong cable and wrist replacement 
Broken tong cable on SW manipulator (serial #8106) of SHC was replaced today. 
Following ISAC Hot Cell entry procedure, Document 157554, SHC was entered and wrist and tong cable were replaced with a pre-run/assembled wrist,
cable and tong. It is standard to try and pre-make/load a new cable into a spare tong assembly to reduce time spent in the HC. This marks the first time
Entry  Tuesday, October 21, 2014, 08:55, chad fisher, South Hot-Cell, Repair, , , Manipulator repair 
The east manipulator handle has been adjusted and is ready for use.
Entry  Wednesday, April 17, 2019, 12:03, chad fisher, South Hot-Cell, Repair, , , Manipulator repair 
Broken handle cable of east manipulator has been replaced and manipulator is operational again.
Entry  Thursday, August 18, 2016, 13:57, chad fisher, South Hot-Cell, Maintenance, , , Manipulator maitenance 
South hot cell was entered to check to replace cable if needed. Wrist cable showed no signs of fraying or broken strands.
A tong with new cable pre-installed is now in the hot cell for next time this job needs to be done. There is also another spare tong cable not
installed in a tong located in the box of manipulator repair equipment located inside the hot cell.
Entry  Wednesday, October 21, 2015, 09:49, chad fisher, South Hot-Cell, Repair, , , Manipulator handle repair 
Rebuild handle of manipulator serial 7986 (currently in the east position) and replaced broken snap ring 5555-18h on west side of the handle underneath
motion switch.
Entry  Friday, June 29, 2018, 10:12, chad fisher, South Hot-Cell, Maintenance, , , Manipulator Tong Cable Replacement 
Tuesday, June 26 the broken tong cable was replaced on the west manipulator in the south hot cell. Wednesday the tong cable was preemptively replaced
on the east manipulator of the south hot cell.
Entry  Monday, October 24, 2016, 10:10, chad fisher, South Hot-Cell, Repair, , , Manipulator Repair Complete 
Maico entered the hot cell and re-strung the skipped cable back onto the pulleys this morning. Manipulator is now operational.
Entry  Friday, May 17, 2013, 10:04, chad fisher, South Hot-Cell, Repair, , , Manipulator Repair 
Manipulator has been sucessfully repaired. Recieved 0.19 mSv. Took Approx. 10-20 minutes
Entry  Monday, October 20, 2014, 14:18, chad fisher, South Hot-Cell, Repair, , , Manipulator Repair 
The broken cable on the east manipulator has been replaced.
The handle will need some adjustments which will take place first thing tomorrow.
Entry  Friday, October 21, 2016, 12:51, chad fisher, South Hot-Cell, Repair, , , Manipulator Repair 
Broken cable has been replaced however a cable has hopped some pulleys inside. After two hours in cell the job was stopped with cables still off pulleys.
Alternate tooling will have to be made and the job will continue Monday.
Entry  Monday, May 05, 2025, 09:18, chad fisher, North Hot-Cell, Maintenance, , , Manipulator Remote End Replacement 9352 with 9764 
Remote end 9352 replaced with end 9764 due to signs of an issue with the tong cable (tong opening excessively large and slack in cable on one side).
Upon replacement tong opening on 9764 also opened larger then the remote end was set to. Everything is operational but this phenomenon indicates the handle
cable system on operator side must be where the excess is coming for. This is further indicted but the position of the locking screw on the handle cable
Entry  Friday, August 12, 2016, 09:58, chad fisher, South Hot-Cell, Maintenance, , , Manipulator Maitenance 
Disassembled the master side of the right manipulator this morning to check the wrist cable. The cable on the master side shows no sign of wear or fraying
suggesting that the slave side cable may be the item that is wearing. during disassembly of the master I did notice some loose parts that could have been
the source of the audible concern but should not have contributed to the slippage felt in the gripper. I will try and schedule Tuesday for entry into the
Entry  Thursday, September 10, 2015, 08:59, chad fisher, South Hot-Cell, Repair, , , Manipulator Mait. and field check Sept. 4 
Hot cell was entered for preventative mait. on left manip. field measurements around the cell were taken in prep. for window removal in January and left/south
light bulb changed.
Hottest item in the cell was the conductor block end of the TM4 febiad coil line. It was 70 mSv/H on contact and seemed to be the major source
Entry  Wednesday, February 15, 2017, 12:07, chad fisher, South Hot-Cell, Maintenance, , , Manipulator 'Z' motion cable replacement preparation status 20170215_113609.jpg
Aaron and I completed assembling (re-assembling) the clean spare on Tuesday, February 14th to assist in determining a procedure for replacement of the
'Z' motion cable on the south hot cell manipulators.
 
Entry  Wednesday, August 03, 2016, 09:15, chad fisher, South Hot-Cell, Repair, , , Manipulator 
East manipulator on the south hot cell is showing signs of eminent wrist/tong cable failure. Some slight slippage was noted yesterday and confirmed by
a snapping sound and more slippage tomorrow.
Entry  Monday, February 27, 2017, 14:23, chad fisher, South Hot-Cell, Repair, , , Manip. 'Z' motion cable run through 
Aaron and I successfully completed a run through on the procedure to replace the 'Z' motion cable. I will be writing up the procedure for review and
we will be performing more run through-s for practice before the actual job.
Entry  Friday, July 28, 2023, 10:09, Adam Newsome, Spent Target Vault, Maintenance, , , Main Storage Vault: Bearing Lubrication 
Bearings for the main storage vault door were lubricated on 2023-07-28. It is unknown when this was last done. It is suggested that this be a recurring
maintenance task every two years. 
Entry  Wednesday, September 04, 2013, 18:53, Grant Minor, South Hot-Cell, Repair, TM3, , Maico's measurements of new c-seals and bench-tested c-seals c-seals_GStanford_file_chronological_4Sept2013.pdfGuyStanford_cseal_file_scanned_30Aug2013.pdf
Today Maico measured the thickness of three indium-plated inconel c-seals, presumably Ultra-Seal P/N 50606.  These seals had NOT been in the Hot
Cell.
 
Entry  Friday, April 28, 2017, 12:04, Anders Mjos, Conditioning Station, Maintenance, , , MP1 problem 
TCS:MP1 was tripping of intermittently yesterday. It was found by Dave Morris that the current sensor was not set correctly causing the pump on status
to flicker at times. Dave adjusted the settings yesterday. The system should be operational and is currently running normally.