1118
|
Friday, November 06, 2015, 14:44 |
Anders Mjos | Conditioning Station | Repair | TM3 | | O-rings replaced on service cap | O-rings were replaced on the service cap
by Anders, Maico, Aurelia and Keith under
work permit I2015-11-05-5 |
|
1120
|
Tuesday, November 10, 2015, 10:23 |
Anders Mjos | Conditioning Station | Maintenance | TM3 | | Air to vacuum leak on service cap | Conducted a more thorough leak check this
morning with Edi. He found a leak on the
base of the blue F/T insulator for |
|
1122
|
Thursday, November 12, 2015, 10:18 |
Anders Mjos | Conditioning Station | Maintenance | TM3 | | Air to vacuum leak on service cap |
|
|
1124
|
Monday, November 16, 2015, 08:04 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | Update TH schedule according to changes.
See attachment 1,2 .
update TH schedule weekly. See attachments |
   |
1127
|
Monday, November 16, 2015, 10:37 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 has been disconnected at TCS. | I stopped the TM3 and TCS vacuum pumps
and water system. The TM3 is disconnected
and vented. It will be moved to silo this |
|
1129
|
Tuesday, November 24, 2015, 13:54 |
chad fisher | South Hot-Cell | Repair | | | Cell Decon | Decon/removal of large solid waste was
performed on Wednesday November 18th."Hot"
activated items included containment box |
|
1130
|
Tuesday, November 24, 2015, 14:00 |
chad fisher | South Hot-Cell | Repair | | | Compressible waste sorting. | Residual fields from the remaining compressible
waste were still too high (as far as I'm
concerned) so I have unpacked all compressible |
|
1131
|
Tuesday, November 24, 2015, 14:02 |
chad fisher | South Hot-Cell | Repair | | | Left Manip repair | electronics package on left manip died
completely yesterday (it has been going for
a while). |
|
1132
|
Tuesday, November 24, 2015, 14:03 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | | Ta#46 | Ta#46 has been removed from TM4. |
|
1136
|
Wednesday, November 25, 2015, 14:16 |
chad fisher | South Hot-Cell | Repair | | | Cell Decon | Cell (table) was systematically cleaned
with a swiffer and resulting piles of contaminated
waste placed in pail with spent Ta target. |
 |
1142
|
Monday, November 30, 2015, 11:46 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | Weekly update TH schedule according to
changes. see attachment 1,2 .
Update TH schedule before the weekend. |
   |
1147
|
Wednesday, December 02, 2015, 10:41 |
chad fisher | South Hot-Cell | Repair | | | Drum Clean-up #2 | Another drum of waste was removed from
the south hot cell this morning. This drum
contained one 5 gal steel pail (damaged), |
|
1148
|
Thursday, December 10, 2015, 13:17 |
Anders Mjos | Conditioning Station | Standard Operation | | | Blank off flange | Thursday, December 10, 2015, 13:17: Roughing
Thursday, December 10, 2015, 14:56:
Started TP1S |
|
1149
|
Friday, December 18, 2015, 11:42 |
Anders Mjos | Conditioning Station | Repair | | | Vacuum gauges not reading correctly | It was found that the conversion
from voltage to vacuum (Torr) in EPICS is
not correct for the XGS-600 controllers in |
|
1150
|
Monday, December 21, 2015, 13:27 |
Anders Mjos | Conditioning Station | Repair | | | Vacuum gauges not reading correctly |
|
|
1151
|
Friday, January 08, 2016, 09:29 |
chad fisher | South Hot-Cell | Repair | | | Window Decon | Entered the hot cell to perform final decon
on the window. Initial swipes this morning
were 11000 c.p.m. on 44-2. After decon approximately |
|
1153
|
Friday, January 22, 2016, 14:24 |
David Wang | South Hot-Cell | Standard Operation | | | 2016 Winter Shut Down Target Hall Schedule (sketch) | Post a sketch of 2016 winter shut down
target hall schedule. see attachment 1,2
UPDATE THE SCHEDULE ACCORDING |
   |
1154
|
Friday, February 12, 2016, 13:00 |
David Wang | Conditioning Station | Standard Operation | | | 2016 Winter Shut Down Target Hall Schedule | 2016 Winter shut down target hall schedule.
See attachments1,2.
update the schedule weekly. |
6x |
1155
|
Friday, February 19, 2016, 06:58 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308's serviced/loaded/ bolts torqued | Five F-308's were loaded with spent ISAC
targets. All five F-308's were serviced two
weeks ago. All bolts were torqued and security |
|
1156
|
Thursday, February 25, 2016, 06:48 |
David Wang | ITE | Standard Operation | | | 4 Shielding blocks have been transferred from ITE to block storage area. | Dan and I transferred 4 shielding blocks
from ITE to block storage area. The ITE pit
is opened now. |
|