  953   Friday, June 19, 2015, 11:43 David WangITWRepairTM1 ITW external water leak on dump circuitThere was an external water leak in ITW
during the last beam running time. The leak
started after the shielding blocks transfer(May
 6x 
  969   Tuesday, June 30, 2015, 11:27 Travis CaveITWStandard OperationTM1UC#12Module movedTM#1 with UC#12 has been moved from the
west station to the south hot cell.
  
  970   Tuesday, June 30, 2015, 12:37 chad fisherSouth Hot-CellStandard OperationTM1UCx#12UCx #12 RemovalUCx#12 has been removed from TM1 and placed
in a pail with argon.
Right leg (B) of target is clearly
  
  971   Tuesday, June 30, 2015, 15:41 David WangITWStandard OperationTM1 TM1 was disconnected in ITW this morning.TM1 was disconnected in ITW  this
morning. The ITW was vented with argon last
night.
  
  974   Thursday, July 02, 2015, 11:49 Travis CaveSouth Hot-CellStandard OperationTM1no targetModule movedTM#1 has been moved from the south hot
cell to the south west silo.
  
  988   Thursday, July 09, 2015, 13:17 Anders MjosConditioning StationStandard OperationTM1 TM1 in TCS for alpha contamination test Thursday, July 09, 2015, 13:17: Water
package started.
Thursday, July 09, 2015, 15:20: Water
  
  990   Thursday, July 09, 2015, 14:02 David WangConditioning StationDevelopmentTM1 TM1 is pumping down at CSTM1 and CS  vacuum system are connected.
All turbo-pumps are started. The new TP1S
works fine also. The pumping down looks good
  
  992   Friday, July 10, 2015, 14:41 Anders MjosConditioning StationMaintenanceTM1 Replaced roughing pump The roughing pump was replaced with
a more leak tight pump due to the discovery
of Rn-220 migration while roughing on TM1
  
  993   Monday, July 13, 2015, 11:31 Travis CaveConditioning StationStandard OperationTM1no targetModule movedTM#1 has been moved back to the south west
silo from the conditioning station.
  
  1064   Wednesday, September 09, 2015, 09:59 Travis CaveSouth Hot-CellStandard OperationTM1no targetModule movedTM#1 has been moved from the south west
silo to the south hot cell.
  
  1065   Thursday, September 10, 2015, 08:55 chad fisherSouth Hot-CellRepairTM1 TM1 Window Leak Diag.Vacuum leak check on the window line circuit
of TM1 took place yesterday and again to
confirm this morning. Both days the response
 P0000122.JPG 
  1068   Tuesday, September 15, 2015, 08:24 David WangSouth Hot-CellRepairTM1UCx 13Leak check on TM1 window circuit soldering stems in service cap.I did a leak check on TM1 window circuit 
2 soldering  stems in service cap.The
round side panel was opened for the job.
  
  1069   Tuesday, September 15, 2015, 11:06 chad fisherSouth Hot-CellRepairTM1 TM1 Window Gasket ReplacementReplaced the custom silver gaskets on the
entrance window panel of TM1 this morning...this
has eliminated an sign of leak at this joint,
  
  1070   Thursday, September 17, 2015, 09:01 Travis CaveSouth Hot-CellStandard OperationTM1no targetModule movedTM#1 has been moved from the south hot
cell to the north east silo.
  
  1071   Thursday, September 17, 2015, 11:50 David WangSpent Target VaultRepairTM1 TM1 window circuit leak check Leak check TM1 window circuit soldering
stems inside service cap when module is located
at NE silo. LD base LR 0.0xE-9atm.cc/sec. 
 TM1_leak_soldering_stems_001.JPGTM1_leak_soldering_stems_003.JPG 
  1180   Thursday, March 24, 2016, 13:15 David WangConditioning StationStandard OperationTM1 TM1 and TCS vacuum system has been connected TM1 and TCS vacuum system have been connected.
All turbo-pumps are started. The pumping
down is fine.
  
  1181   Thursday, March 24, 2016, 13:55 Travis CaveConditioning StationStandard OperationTM1no targetmodule movedTM#2 has been moved from the south hot
cell to the south west silo and TM#1 was
moved from the north east silo to the conditioning
  
  1182   Tuesday, March 29, 2016, 08:38 David WangConditioning StationStandard OperationTM1 TM1 water lines helium pressure check at TCSTM1 water lines helium pressure check at
TCS is done. 70 psi helium was applied to
water circuits. Leak detector base leak rate
 TM1_PNG1_panel_o-ring_replacement_001.JPGTM1_PNG1_panel_o-ring_replacement_002.JPGTM1_PNG1_panel_o-ring_replacement_004.JPGTM1_PNG1_panel_o-ring_replacement_005.JPGTM1_PNG1_panel_o-ring_replacement_006.JPG 
  1184   Wednesday, March 30, 2016, 11:00 Travis CaveConditioning StationStandard OperationTM1no targetElectrical CheckThe results of the TM#1 electrical check
from the 29th of March 2016
 TM1_elec_chk_notgt.PDF 
  1186   Friday, April 01, 2016, 11:41 Travis CaveSouth Hot-CellStandard OperationTM1UC#15Electrical CheckElectrical check of the target on TM#1,
target in question is UC#15. See PDF for
details.
 TM1_elec_chk_UC#15_SHC.PDF 