953
|
Friday, June 19, 2015, 11:43 |
David Wang | ITW | Repair | TM1 | | ITW external water leak on dump circuit | There was an external water leak in ITW
during the last beam running time. The leak
started after the shielding blocks transfer(May |
6x |
969
|
Tuesday, June 30, 2015, 11:27 |
Travis Cave | ITW | Standard Operation | TM1 | UC#12 | Module moved | TM#1 with UC#12 has been moved from the
west station to the south hot cell. |
|
970
|
Tuesday, June 30, 2015, 12:37 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#12 | UCx #12 Removal | UCx#12 has been removed from TM1 and placed
in a pail with argon.
Right leg (B) of target is clearly |
|
971
|
Tuesday, June 30, 2015, 15:41 |
David Wang | ITW | Standard Operation | TM1 | | TM1 was disconnected in ITW this morning. | TM1 was disconnected in ITW this
morning. The ITW was vented with argon last
night. |
|
974
|
Thursday, July 02, 2015, 11:49 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module moved | TM#1 has been moved from the south hot
cell to the south west silo. |
|
988
|
Thursday, July 09, 2015, 13:17 |
Anders Mjos | Conditioning Station | Standard Operation | TM1 | | TM1 in TCS for alpha contamination test | Thursday, July 09, 2015, 13:17: Water
package started.
Thursday, July 09, 2015, 15:20: Water |
|
990
|
Thursday, July 09, 2015, 14:02 |
David Wang | Conditioning Station | Development | TM1 | | TM1 is pumping down at CS | TM1 and CS vacuum system are connected.
All turbo-pumps are started. The new TP1S
works fine also. The pumping down looks good |
|
992
|
Friday, July 10, 2015, 14:41 |
Anders Mjos | Conditioning Station | Maintenance | TM1 | | Replaced roughing pump | The roughing pump was replaced with
a more leak tight pump due to the discovery
of Rn-220 migration while roughing on TM1 |
|
993
|
Monday, July 13, 2015, 11:31 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | Module moved | TM#1 has been moved back to the south west
silo from the conditioning station. |
|
1064
|
Wednesday, September 09, 2015, 09:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module moved | TM#1 has been moved from the south west
silo to the south hot cell. |
|
1065
|
Thursday, September 10, 2015, 08:55 |
chad fisher | South Hot-Cell | Repair | TM1 | | TM1 Window Leak Diag. | Vacuum leak check on the window line circuit
of TM1 took place yesterday and again to
confirm this morning. Both days the response |
|
1068
|
Tuesday, September 15, 2015, 08:24 |
David Wang | South Hot-Cell | Repair | TM1 | UCx 13 | Leak check on TM1 window circuit soldering stems in service cap. | I did a leak check on TM1 window circuit
2 soldering stems in service cap.The
round side panel was opened for the job. |
|
1069
|
Tuesday, September 15, 2015, 11:06 |
chad fisher | South Hot-Cell | Repair | TM1 | | TM1 Window Gasket Replacement | Replaced the custom silver gaskets on the
entrance window panel of TM1 this morning...this
has eliminated an sign of leak at this joint, |
|
1070
|
Thursday, September 17, 2015, 09:01 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module moved | TM#1 has been moved from the south hot
cell to the north east silo. |
|
1071
|
Thursday, September 17, 2015, 11:50 |
David Wang | Spent Target Vault | Repair | TM1 | | TM1 window circuit leak check | Leak check TM1 window circuit soldering
stems inside service cap when module is located
at NE silo. LD base LR 0.0xE-9atm.cc/sec. |
 |
1180
|
Thursday, March 24, 2016, 13:15 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and TCS vacuum system has been connected | TM1 and TCS vacuum system have been connected.
All turbo-pumps are started. The pumping
down is fine. |
|
1181
|
Thursday, March 24, 2016, 13:55 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | module moved | TM#2 has been moved from the south hot
cell to the south west silo and TM#1 was
moved from the north east silo to the conditioning |
|
1182
|
Tuesday, March 29, 2016, 08:38 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 water lines helium pressure check at TCS | TM1 water lines helium pressure check at
TCS is done. 70 psi helium was applied to
water circuits. Leak detector base leak rate |
    |
1184
|
Wednesday, March 30, 2016, 11:00 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | Electrical Check | The results of the TM#1 electrical check
from the 29th of March 2016 |
|
1186
|
Friday, April 01, 2016, 11:41 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#15 | Electrical Check | Electrical check of the target on TM#1,
target in question is UC#15. See PDF for
details. |
|