Tuesday, October 14, 2014, 12:19, David Wang, ITW, Standard Operation, TM1, , TM1 was disconnected in ITW.
|
TM1 was disconnected in ITW this morning. Heat shield circuit is purged. |
Tuesday, October 14, 2014, 13:31, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, Electrical check
|
Electrical check of TM#1 with no target attached at the south hot cell see attached PDF for details. |
Wednesday, October 15, 2014, 12:55, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move
|
TM#1 with no target has been moved from the south hot cell to the south west silo. |
Monday, November 03, 2014, 10:27, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move
|
TM#1 has been moved from the south west silo to the south hot cell. |
Monday, November 03, 2014, 11:16, chad fisher, South Hot-Cell, Standard Operation, TM1, ThO#1, ThO#1 Installed
|
ThO#1 has been installed onto TM1 and is ready for leak and electrical checking. High current fasteners torqued to 130 in lbs. |
Monday, November 03, 2014, 13:47, Travis Cave, South Hot-Cell, Standard Operation, TM1, ThO#1, Electrical check
|
TM#1 with ThO#1 electrical check see attatched PDF for details. |
Tuesday, November 04, 2014, 11:05, David Wang, South Hot-Cell, Standard Operation, TM1, ThO#1, Leak check on TM1 HS water line withThO#1 installed.
|
Chad and I leak checked HS line on TM1 with ThO#1 target installed. The LD pumped down to base leak rate 0.0xE-9 atm.cc/sec, base leak rate 0.0xE-4 torr. The pumping down process is normal. Chad sprayed helium on both VCR joints (each for 2 seconds) , and he did a flush spray around the target for 5 seconds. No any response had been found on LD during and after the spray( 40seconds waiting time). The target is leak tight. |
Tuesday, November 04, 2014, 13:17, chad fisher, South Hot-Cell, Standard Operation, TM1, ThO#1, TM1 w/ ThO#1 ready
|
Tm1 with ThO#1 is buttoned up and ready for transport. |
Wednesday, November 05, 2014, 10:20, Travis Cave, South Hot-Cell, Standard Operation, TM1, ThO#1, module move
|
TM#1 with ThO#1 has been moved from the south hot cell to the west target station. |
Thursday, November 06, 2014, 08:07, David Wang, ITW, Standard Operation, TM1, ThO#1, TM1 has been connected in ITW.
|
TM1 has been connected in ITW. All turbo pumps are started. The pumping down on ITW is good so far. The water is supplied to TM1 for HV conditioning. |
Thursday, November 06, 2014, 08:55, David Wang, ITW, Repair, TM1, ThO#1, primary vacuum back up pressureITH CG1 ,CG2,CG4A were high.
|
I found primary vacuum back up pressure ITH CG1, CG2, and CG4A were unusually high this morning. They should be about 10 -20 mtorr after one night pumping, but all of thier reading were 340-350-mtorr. Thease cause the current draw on primary turbo pumps were all over 2.0A(should be about 1.0A). I let Paul closed all BVs on primary side . The pressure dropped quickly to normal range after all BVs were closed. This shows the back up line are good. The problem are from one of the connections on primary BVs. I let Paul opened the BVs one by one,but the problem did not show again. Now ,the current draw on the turbo pumps are back to normal also.
I will keep monitoring the system and take a look on all KF25 clamps on BVs once I have a chance to access to ITW. |
Thursday, November 13, 2014, 13:52, David Wang, ITW, Standard Operation, TM1, ThO#1, 5 Shielding blocks have been transferred from ITE to ITW.
|
Dan and I transferred 5 shielding blocks from ITE to ITW. The ITW is configured to take proton beam. |
Thursday, November 13, 2014, 14:01, David Wang, ITW, Repair, TM1, , I replaced flow wheel and coil on ITW MSP water flow sensor.
|
I replaced flow wheel and coil on ITW MSP water flow sensor which is located in ITW pit. Before replacement, I checked the signal strength and frequency form e-board on this circuit. The signal was good in 10minutes watching. Still, I replaced them. The flow sensor works fine after replacement. I made a comment on Isac e-fault system about this issue. |
Monday, March 09, 2015, 14:01, chad fisher, South Hot-Cell, Standard Operation, TM1, ThO#1, ThO#1 removed
|
ThO#1 has been removed from TM1 and placed into the plastic dissection box.
Containment box cover has been reinstalled as per usual. |
Tuesday, March 10, 2015, 09:01, Travis Cave, South Hot-Cell, Standard Operation, TM1, ThO#1, Module move
|
TM#1 has been moved from the west station to the south hot cell had the ThO#1 target removed and then the modules was moved from the south hot cell to the south west silo. Also an electrical check was done on the target before it was removed. |
Thursday, March 12, 2015, 13:33, Anders Mjos, South Hot-Cell, Standard Operation, TM1, ThO#1, Target inspection
|
Chad, Anders and Alex inspected the target this morning. The target had no significant visible damage to the container. Some material was deposited on the Extraction Electrode.
Phots on DocuShare |
Friday, April 17, 2015, 09:09, Travis Cave, South Hot-Cell, Standard Operation, TM1, No target, Module move
|
TM#1 with no target has been moved from the south west silo to the south hot cell for the installation of the UCx target. |
Friday, April 17, 2015, 11:56, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#12, Electrical check
|
Electrical check of TM#1 with UCx#12 attached. See attached PDF for details. |
Friday, April 17, 2015, 14:04, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#12, Module move
|
TM#1 with UCx#12 has been moved from the south hot cell to the conditioning station. |
Monday, April 20, 2015, 10:12, Anders Mjos, Conditioning Station, Standard Operation, TM1, UC#12, Conditioning UC#12
|
Monday, April 20, 2015, 09:35: Started cooling water circulation
HV cover did not fit due to interference with the air sampling valve. Target Hall will have to be locked out for conditioning to proceed. WP I2015-04-20-2
Monday, April 20, 2015, 10:09: Started chiller staging
Target hall and HV enclosure has been locked out.
Monday, April 20, 2015, 13:45: 22 kV, 0.04 mA BIAS
Monday, April 20, 2015, 14:58: No sparks observed. BIAS off
Tuesday, April 21, 2015, 08:26: Starting heater auto-ramp to 500 / 230 A at 2 A/min
Tuesday, April 21, 2015, 08:32: BIAS/EE to 20 / 1.5 kV
Tuesday, April 21, 2015, 12:59: TGHT / TBHT at 327 / 230 A. Pausing the auto-ramping. Bill will be monitoring TCS while I am off-site.
Tuesday, April 21, 2015, 15:56: Continue auto-ramping
Tuesday, April 21, 2015, 17:34: Auto-ramping finished. TGHT / TBHT at 500 / 230 A
Wednesday, April 22, 2015, 08:43: Vacuum tripped heaters and BIAS over night. Switching off to do a leak check on the service cap.
Wednesday, April 22, 2015, 09:03: Stopping turbo and roughing pump for David. David is preparing a leak check.
Wednesday, April 22, 2015, 09:06: Started roughing pump.
Wednesday, April 22, 2015, 09:22: Roughing pump trips off after a few minutes of pumping.
Wednesday, April 22, 2015, 13:11: Stopped water flow.
Wednesday, April 22, 2015, 16:07: Starting turbos
Wednesday, April 22, 2015, 16:15: All turbos at speed.
David found a leak on the window line this morning.
https://elog.triumf.ca/TIS/RH-ISAC/896
Thursday, April 23, 2015, 11:12 : Starting cooling pack
Good vacuum limit on IG1 changed from 7E-5 T to 1E-5 T
Thursday, April 23, 2015, 12:53 : Starting heater auto-ramp to 500 / 230 A at 2 A/min. Bad vacuum limit reduced to 8E-6 T
Thursday, April 23, 2015, 13:03 : BIAS/EE to 15/ 1.5 kV
Thursday, April 23, 2015, 13:28 : BIAS/EE to 20/ 1.5 kV. No sparking observed
Thursday, April 23, 2015, 17:23: Auto-ramping finished. TGHT / TBHT at 500 / 230 A
Thursday, April 23, 2015, 17:51: Fault on cooling circuit (Fault 2).. Manually starting CP1
Thursday, April 23, 2015, 18:01: Cycled power of chiller unit. System recovered. Enabled staging.
Thursday, April 23, 2015, 18:42 : One minor spark observed. Starting cool down at 12 and 9 A/min
Thursday, April 23, 2015, 19:51 : Heaters and BIAS off
Friday, April 24, 2015, 08:21 : Water cooling off |
|